04/30/10:
- 18:08 Milestone PGTools: S2.e Updated user guide completed
- Second version of user guide for ProtoGENI experimenter tools. …
- 17:44 WiMAXInteg edited by
- (diff)
- 17:37 WiMAXInteg edited by
- (diff)
- 17:36 WiMAXInteg edited by
- (diff)
- 11:51 Ticket #430 (Milestone completion for LEARN: S2-j Release of Measurement Handler ...) created by
- Milestone report of the release of measurement handler software. The …
- 11:50 LEARN edited by
- (diff)
- 11:49 LEARN edited by
- link to milestone j report (diff)
- 10:48 LAMP edited by
- (diff)
- 10:47 LAMP edited by
- (diff)
- 10:45 LAMP-FirstQuarter2010 created by
- 00:00 Milestone OFNOX: S2.e Support campus installations of GENI software with AM API completed
- Campuses will be installing GENI software with AM API implementation; …
04/29/10:
- 17:16 LAMP edited by
- (diff)
- 17:12 LAMP edited by
- (diff)
- 17:09 LAMP edited by
- (diff)
- 17:06 LAMP edited by
- (diff)
- 17:02 LAMP edited by
- (diff)
- 16:57 LAMP edited by
- (diff)
- 15:01 PGAugmentation edited by
- (diff)
04/28/10:
- 16:06 2ndInstMeasWork edited by
- (diff)
- 16:04 2ndInstMeasWork created by
- 15:58 GeniInstMeas edited by
- (diff)
- 12:16 OFI2 edited by
- (diff)
04/26/10:
- 13:07 OFUWI edited by
- (diff)
- 13:06 OFUWI-2010Q1-status created by
- 11:11 Milestone BGPMux: S2.c BGP-Mux ops transition - completed
- BGP-Mux Operations Transition. Support for (non-developer) …
04/23/10:
- 16:04 april042310agenda edited by
- (diff)
- 16:03 april042310agenda created by
- 16:02 ClusterD edited by
- (diff)
- 11:53 GEC7DemoSummary edited by
- Adding DSL Demo participants (diff)
- 09:47 Gec4Demos edited by
- (diff)
- 09:37 Gec5Agenda edited by
- (diff)
- 09:36 WikiStart edited by
- (diff)
- 09:01 Ticket #429 (Milestone completion for LEARN: S2-c Establish ORCA control framework) closed by
- fixed
04/22/10:
- 17:23 IGENI edited by
- (diff)
- 16:49 Ticket #429 (Milestone completion for LEARN: S2-c Establish ORCA control framework) created by
- ORCA control framework instance has been created in the lab for …
- 16:44 LEARN edited by
- (diff)
- 16:41 Milestone GpENI: S2.j federate completed
- Federate with Public PlanetLab using SFA + GENIwrapper + MyPLC. …
- 16:15 WiMAXInteg edited by
- (diff)
- 12:42 GEC7DemoSummary edited by
- (diff)
- 11:54 GEC7DemoSummary edited by
- removed ORCABEN vendor demo details. Leaving Ilia to add by himself. (diff)
- 11:48 GEC7DemoSummary edited by
- per email request from Ilia to add Openflow demo along with ORCABEN (diff)
- 11:26 GEC7DemoSummary edited by
- (diff)
- 11:26 GEC7DemoSummary edited by
- remove unneeded graphic (diff)
- 11:20 GEC7DemoSummary edited by
- fix punctuation (diff)
- 11:14 GEC7DemoSummary edited by
- fix typo (diff)
- 11:12 GEC7DemoSummary edited by
- fix punctuation (diff)
- 10:16 GEC7DemoSummary edited by
- (diff)
- 10:13 GEC7DemoSummary edited by
- (diff)
- 10:13 GEC7DemoSummary edited by
- (diff)
- 09:41 WikiStart edited by
- Add link to GEC7 Demo Summary page. (diff)
- 09:08 GEC7DemoSummary edited by
- (diff)
- 09:01 Milestone LEARN: S2.c Establish ORCA framework completed
- Establish local ORCA control framework, for eventual integration with …
- 09:01 Gec7Agenda edited by
- add link to demo summary page with videos, posters, and presentations (diff)
04/21/10:
- 17:56 GEC7DemoSummary edited by
- (diff)
- 17:48 GEC7DemoSummary edited by
- (diff)
- 17:42 GEC7DemoSummary edited by
- (diff)
- 17:39 GEC7DemoSummary edited by
- (diff)
- 17:38 GEC7DemoSummary edited by
- (diff)
- 17:28 GEC7DemoSummary edited by
- (diff)
- 17:28 Ticket #428 (CMU: GEC7 poster) created by
- You may find the GEC7 demo linked at: …
- 17:27 WiMAXInteg edited by
- (diff)
- 17:23 GEC7DemoSummary edited by
- (diff)
- 17:15 GEC7DemoSummary edited by
- (diff)
- 17:00 GEC7DemoSummary edited by
- fix SPP link (diff)
- 16:59 WiMAXInteg edited by
- (diff)
- 16:49 WiMAXInteg edited by
- (diff)
- 16:44 GEC7DemoSummary edited by
- add "s" for plural participants (diff)
- 16:42 GEC7DemoSummary edited by
- punctuation (diff)
- 15:56 CRON edited by
- (diff)
- 15:55 CRON edited by
- (diff)
- 15:53 netKarma edited by
- (diff)
- 15:52 netKarma edited by
- (diff)
- 15:52 netKarma edited by
- (diff)
- 15:48 CRON edited by
- (diff)
- 15:48 CRON edited by
- (diff)
- 15:47 CRON edited by
- (diff)
- 15:46 CRON edited by
- (diff)
- 15:42 BGPMux edited by
- (diff)
- 15:42 CRON edited by
- (diff)
- 15:41 CRON edited by
- (diff)
- 15:12 BGPMux edited by
- (diff)
- 15:11 BGPMux edited by
- (diff)
- 15:11 BGPMux edited by
- (diff)
- 15:05 CRON edited by
- (diff)
- 14:58 GEC7DemoSummary edited by
- (diff)
- 14:51 GEC7DemoSummary edited by
- (diff)
- 14:46 GEC7DemoSummary edited by
- (diff)
- 14:26 EnterpriseGeni edited by
- (diff)
- 14:18 OFSTAN edited by
- (diff)
- 14:11 GEC7DemoSummary edited by
- add video/audio hint (diff)
- 14:06 GEC7DemoSummary edited by
- (diff)
- 14:05 GEC7DemoSummary edited by
- (diff)
- 13:52 GEC7DemoSummary created by
- 13:47 OFPR edited by
- (diff)
- 11:55 CRON edited by
- (diff)
- 11:36 OFRG edited by
- (diff)
- 11:34 Ticket #387 (OFRG: S2.a2 Purchase equipment) closed by
- fixed: Thanks, Ivan! I'll go ahead and close this one out, and mark the …
- 10:59 CmuLab edited by
- (diff)
- 10:12 CRON edited by
- (diff)
- 10:07 SCAFFOLD edited by
- add Steve Ko, who presented poster at GEC7 (diff)
- 06:35 Internet Scale Overlay Hosting edited by
- Add John DeHart, who did GEC demos and helped run SPP tutorial (diff)
- 03:14 CRON edited by
- (diff)
- 03:12 CRON edited by
- (diff)
- 03:01 CRON edited by
- (diff)
- 02:37 CRON edited by
- (diff)
- 00:49 Ticket #427 (milestone S2.d completion) created by
- Rspec allows advertising, Request and describing the resources used in …
- 00:34 Ticket #426 (milestone S2.c completion) created by
- An optical fiber between CRON testbed (which was deployed at the first …
- 00:19 Ticket #425 (Milestone S2.b completion) created by
- LONI network has established a 10Gbps connection to Internet2 since …
04/20/10:
- 17:07 Quarterly-ExptsSec-report-2.txt edited by
- (diff)
- 17:01 ExptsSec created by
- 17:00 ExptsSecurityAnalysis edited by
- (diff)
- 16:17 WiMAXInteg/CampusInstallation edited by
- (diff)
- 16:10 WiMAXInteg edited by
- (diff)
- 16:09 WiMAXInteg edited by
- (diff)
- 15:51 PrimoGENI edited by
- added students who did GEC7 demo (diff)
- 15:43 WiMAXInteg edited by
- (diff)
- 15:39 WiMAXInteg edited by
- (diff)
- 15:37 WiMAXInteg edited by
- (diff)
- 15:22 WiMAXInteg edited by
- (diff)
- 15:11 WiMAXInteg edited by
- (diff)
- 14:47 WiMAXInteg edited by
- (diff)
- 14:35 WiMAXInteg/CampusInstallation edited by
- (diff)
- 13:33 OFBBN edited by
- (diff)
- 11:16 WiMAXInteg edited by
- (diff)
- 11:15 WiMAXInteg edited by
- (diff)
- 10:59 OFBBN edited by
- (diff)
- 10:13 OFUWA edited by
- (diff)
- 00:00 Milestone OFRG: S2.a2 Purchase equipment completed
- Purchase equipment.
04/19/10:
- 18:38 ExptsSecurity created by
- 18:36 Quarterly-ExptsSec-report-2.txt edited by
- (diff)
- 18:32 Quarterly-ExptsSec-report-2.txt created by
- 18:31 Ticket #304 (Plan for GEC7 demos) closed by
- fixed
- 18:10 OFUWI edited by
- adding folks who did GEC7 demo (diff)
- 17:52 OFGT edited by
- add line break (diff)
- 17:51 OFGT edited by
- Added Ankur, who did the GEC7 demo (diff)
- 17:47 OFUWA edited by
- Added Vjeko, who did the GEC7 demo (diff)
- 17:20 RavenToProtoGENI created by
- 17:19 ProvisioningService edited by
- (diff)
- 16:19 GpENI edited by
- (diff)
- 16:17 GpENI edited by
- (diff)
- 16:15 GpENI edited by
- (diff)
- 15:58 Mid-Atlantic Crossroads edited by
- Adding Tom Lehman, who gave MAX demo at GEC7 (diff)
- 15:28 K-GENI edited by
- fix typo (diff)
- 14:55 ProtoGENI edited by
- (diff)
- 11:33 Ticket #391 (OFUWI: S2.a2 Purchase equipment) closed by
- fixed: Aditya writes: […] Sounds good; I'll go ahead and close this one …
- 11:30 OFSTAN edited by
- (diff)
- 11:15 OFUWI edited by
- (diff)
- 11:11 ProCurve created by
- 11:09 OFUWA edited by
- (diff)
- 11:06 OFRG edited by
- (diff)
- 10:50 OFIU edited by
- (diff)
- 10:45 FlowVisor created by
- 10:43 OFCLEM edited by
- (diff)
- 00:00 Milestone OFUWI: S2.a2 Purchase equipment completed
- Purchase equipment.
04/18/10:
04/16/10:
- 23:24 ProjTemp-1Q10-status created by
- 23:20 VMI-FED edited by
- (diff)
- 23:18 ProjTemp-4Q09-status created by
- 17:55 OFNLR edited by
- (diff)
- 17:01 OFUWI edited by
- (diff)
- 17:00 OFUWA edited by
- (diff)
- 17:00 OFRG edited by
- (diff)
- 16:59 OFRG edited by
- (diff)
- 16:58 OFIU edited by
- (diff)
- 16:56 OFSTAN edited by
- Added Stanford's slides from the OpenFlow meeting at GEC 7 (diff)
- 16:54 OFCLEM edited by
- Added Clemson's slides from the OpenFlow meeting at GEC 7 (diff)
- 16:11 ExptsSecurityAnalysis edited by
- (diff)
- 14:09 SpiralTwo edited by
- (diff)
- 14:08 ExptsSecurityAnalysis edited by
- (diff)
- 14:08 ExptsSecurityAnalysis edited by
- (diff)
- 14:07 ExptsSecurityAnalysis edited by
- (diff)
- 13:55 SpiralTwo edited by
- typo (diff)
- 13:47 SpiralTwo edited by
- add Nicira openflow page link (diff)
04/15/10:
- 16:58 Milestone Quilt: S2.c Complete Workshop Program completed
- Completed as described in ticket.
- 16:25 ABAC edited by
- (diff)
- 16:25 ABAC edited by
- (diff)
- 16:23 WiMAXInteg edited by
- (diff)
- 16:15 WiMAXInteg edited by
- (diff)
- 15:57 WiMAXInteg edited by
- (diff)
- 15:49 WiMAXInteg edited by
- (diff)
- 14:53 WiMAXInteg edited by
- (diff)
- 11:35 Ticket #424 (Milestone S2.b completion) closed by
- fixed
- 11:34 Ticket #424 (Milestone S2.b completion) created by
- Per Ivan on 4/7: Radio card demo'd at GEC7
- 11:31 Ticket #423 (Milestone S2.a completion) closed by
- fixed
- 11:31 Ticket #423 (Milestone S2.a completion) created by
- Ivan on 4/7: Gathered in wiki, now attached.
- 11:05 Ticket #422 (Milestone S2.f completion) closed by
- fixed
- 11:05 Ticket #422 (Milestone S2.f completion) created by
- Ivan on 3/16: Summarized current view of clients at mtg, including …
- 11:01 Ticket #421 (Milestone S2.d completion) closed by
- fixed
- 11:01 Ticket #421 (Milestone S2.d completion) created by
- Ivan on 3/4: Has completed connection from WINLAB to NICTA via I2 iON …
- 10:57 Ticket #420 (Milestone S2.c completion) closed by
- fixed
- 10:57 Ticket #420 (Milestone S2.c completion) reopened by
- 10:56 Ticket #420 (Milestone S2.c completion) closed by
- fixed
- 10:56 Ticket #420 (Milestone S2.c completion) created by
- Ivan on 4/7: Done at GEC6 on 11/16/09
- 10:53 Ticket #419 (Milestone S2.a completion) closed by
- fixed
- 10:53 Ticket #419 (Milestone S2.a completion) created by
- IVAN ON 4/7: Has been available since GEC6 on 11/16/09
- 10:50 Ticket #172 (milestone 1d completion) closed by
- fixed: Ivan on 4/7: v1.0 code shown at GEC6 demo, on 11/16/09
- 10:35 Milestone KGENI: S2.c ETRI-IU Connection Live completed
- The two institutions are connected and GMOC-dvNOC interoperability …
- 09:44 Ticket #418 (Milestone S2.i completion) created by
- Ivan on 4/7: Every OMF service has a REST interface, with a status. …
- 09:42 Ticket #417 (Milestone S2.f completion) created by
- Ivan on 3/31: Testing rel 5.3; expect to push into WimAX after May …
- 09:38 Ticket #416 (Milestone S2.e completion) closed by
- fixed
- 09:38 Ticket #416 (Milestone S2.e completion) created by
- Ivan on 3/4: Hvae completed L2 connection between WINLAB and NICTA …
- 09:36 Ticket #415 (Milestone S2.a completion) created by
- Ivan on 3/4: Have completed L2 connection between WINLAB and NICTA …
- 09:32 Ticket #414 (Milestone S2.d completion) created by
- Per Ivan on 4/7: WiMAX integrated into ORBIT testbed before GEC6. …
- 09:29 ABAC edited by
- (diff)
- 09:25 Ticket #413 (Milestone S2.c completion) closed by
- fixed
- 09:25 Ticket #413 (Milestone S2.c completion) created by
- Per Ivan on 4/7: Done early, with implementation of triplines; …
- 09:22 Ticket #412 (Milestone S2.b completion) closed by
- fixed
- 09:22 Ticket #412 (Milestone S2.b completion) created by
- Ivan on 3/31 and 4/7: Plan for federation is to use pub/sub over mgmt …
- 08:56 PrimoGENIStatusReport2010Q1 edited by
- (diff)
- 08:53 PrimoGENIStatusReport2009Q4 created by
- 08:49 PrimoGENI edited by
- (diff)
- 08:48 PrimoGENIStatusReport2010Q1 created by
- 06:05 PlanetLab-1Q10-status edited by
- (diff)
- 06:00 PlanetLab-1Q10-status created by
- 05:25 PlanetLab edited by
- (diff)
04/14/10:
- 22:47 PrimoGENI edited by
- (diff)
- 21:02 Ticket #411 (Milestone S2.k completion) closed by
- fixed
- 21:01 Ticket #411 (Milestone S2.k completion) created by
- After GEC7: Ontology workshop held at Duke.
- 21:00 Ticket #410 (Milestone S2.j completion) closed by
- fixed
- 21:00 Ticket #410 (Milestone S2.j completion) created by
- Per 1Q10 QSR: First ontology schema is available at …
- 20:56 Ticket #409 (Milestone S2.h completion) closed by
- fixed
- 20:56 Ticket #409 (Milestone S2.h completion) created by
- At GEC7: Demonstrated support for provisioning Eucalyptus VMs
- 20:53 Ticket #357 (ORCA actor registry) closed by
- fixed
- 20:50 Ticket #356 (Bella 2.1) closed by
- fixed
- 20:48 Ticket #408 (Milestone S2.j completion) closed by
- fixed
- 20:48 Ticket #408 (Milestone S2.j completion) created by
- Per 1Q10 SR: Demonstrated at GEC7 demo.
- 20:44 Ticket #407 (Milestone S2.e completion) closed by
- fixed
- 20:44 Ticket #407 (Milestone S2.e completion) created by
- Per 1Q10 QSR: Debug and stabilize clearinghouse Code and operational …
- 20:33 Ticket #355 (Bella 2.1) closed by
- fixed
- 18:15 Ticket #406 (Demonstration of initial VMI library on cluster nodes at UA (Demo at GEC8)) created by
- Porting VMI library to ORCA, which has a Xen-based infrastructure. …
- 18:12 Ticket #405 (Porting VMI library to vServer-based cluster nodes.) created by
- Porting VMI to myPLC, which has a vServer-based infrastructure. …
- 18:11 InstrumentationTools edited by
- (diff)
- 18:01 PGAugmentation edited by
- (diff)
- 17:02 DOME edited by
- (diff)
- 16:58 Ticket #396 (Milestone DOME: S2.d completion) closed by
- fixed
- 16:56 BGPMux edited by
- (diff)
- 16:51 Ticket #404 (Milestone S2.c completion) closed by
- fixed
- 16:51 Ticket #404 (Milestone S2.c completion) created by
- A Cisco 6509 router was installed in Chicago before GEC7. It was …
- 16:39 BGPMux edited by
- (diff)
- 16:30 BGPMux edited by
- (diff)
- 15:20 LAMP edited by
- (diff)
- 14:17 ClusterE edited by
- (diff)
- 14:16 WiMAXInteg edited by
- (diff)
- 13:06 GENICloud edited by
- (diff)
- 12:07 GEC8GEC9DemoPlans edited by
- (diff)
- 12:04 GEC8GEC9DemoPlans edited by
- (diff)
- 12:04 GEC8GEC9DemoPlans created by
- 11:57 GpENI edited by
- (diff)
- 11:21 WiMAXInteg edited by
- (diff)
- 10:41 MilestonesAndTickets edited by
- (diff)
- 00:00 Milestone OFNLR: S2.a Complete initial deployment plan completed
- Complete NLR deployment plan for year 1 (5 cities). Specified cities …
04/13/10:
- 17:43 Raven4Q10QSR created by
- 17:42 ProvisioningService edited by
- (diff)
- 17:39 Raven1Q10QSR created by
- 17:38 ProvisioningService edited by
- (diff)
- 16:09 WiMAXInteg edited by
- (diff)
- 16:08 WiMAXInteg edited by
- (diff)
- 15:43 MilestonesAndTickets edited by
- (diff)
- 15:38 Ticket #403 (OFNLR: S2.a Complete initial deployment plan) created by
- Complete NLR deployment plan for year 1 (5 cities). Specified cities …
- 15:36 Ticket #402 (OFI2: S2.a Complete initial deployment plan) created by
- Complete initial Internet2 deployment plan for year 1 (5 cities). …
- 15:24 Ticket #401 (OFNOX: S2.d Release software that supports OpenFlow 1.0 configuration ...) created by
- Release software that supports OpenFlow 1.0 configuration protocol. …
- 15:22 Ticket #400 (OFNOX: S2.c Initial rough NOX API documentation) created by
- Provide initial rough NOX API documentation for OF development team review.
- 15:18 Ticket #399 (OFNOX: S2.b Release NOX supporting OpenFlow 1.0) closed by
- fixed: http://www.openflowswitch.org/wk/index.php/OpenFlow_1.0_release_notes …
- 15:12 Ticket #399 (OFNOX: S2.b Release NOX supporting OpenFlow 1.0) created by
- Release software that supports OpenFlow 1.0. In GENI environments. …
- 15:08 OFNOX edited by
- (diff)
- 15:05 Ticket #398 (OFNOX: S2.a Publish NOX feature list) closed by
- fixed: I've attached a PDF that Martin sent to Henry in January with this …
- 15:01 Ticket #398 (OFNOX: S2.a Publish NOX feature list) created by
- Publish NOX feature list with technical descriptions for OpenFlow 1.0 …
- 14:04 OFUWA edited by
- (diff)
- 13:39 OFUWA-2010Q1-status created by
04/12/10:
- 17:15 SecureUpdates edited by
- (diff)
- 16:58 Milestone DOME: S2.d Import extended ORCA v2.1 completed
- Import an extended GENI-compliant control framework from the ORCA …
- 12:35 OpticalAccessNets edited by
- (diff)
- 11:30 BGPMux edited by
- (diff)
- 10:58 BGPMux edited by
- (diff)
- 10:37 DOME edited by
- (diff)
- 10:03 Milestone DOME: S2.g Include 900MHz radios completed
- Implement improved virtualization and experiment control functions, …
- 10:03 Ticket #397 (Milestone DOME: S2.g completion) closed by
- fixed
- 10:02 Ticket #296 (MIlestone S2.g completion) closed by
- fixed
- 10:02 Milestone DOME: S2.e Improve virtualization and experiment control completed
- Extend the software for your mobile nodes (bricks), your centralized …
- 10:01 Ticket #395 (Milestone DOME: S2.e completion) closed by
- fixed
- 09:18 Ticket #397 (Milestone DOME: S2.g completion) created by
- XTend 900 MHz radio development is complete and has been deployed on …
- 09:15 Ticket #396 (Milestone DOME: S2.d completion) created by
- DOME has been built with "bella" release of ORCA. Any functionality …
- 09:12 Ticket #395 (Milestone DOME: S2.e completion) created by
- Various improvements made, including a suite of tools to monitor and …
04/10/10:
04/09/10:
- 18:01 GpENI edited by
- (diff)
- 17:06 DigitalObjectRegistry edited by
- (diff)
- 16:45 april040910agenda created by
- 16:43 ClusterD edited by
- (diff)
- 10:51 Gec7ClusterEAgenda edited by
- (diff)
04/08/10:
04/07/10:
- 18:59 ORCAAUG edited by
- (diff)
- 18:56 Gec7ClusterDDemos edited by
- (diff)
- 18:55 ORCABEN edited by
- (diff)
- 18:53 ORCABEN edited by
- (diff)
- 18:45 IMF edited by
- (diff)
- 18:41 Ticket #324 (Submitting milestone S2.d document) closed by
- fixed
- 18:39 Ticket #323 (Submitting milestone S2.a document) closed by
- fixed
- 18:33 Ticket #361 (Milestone S2.b completion) closed by
- fixed
- 18:23 Ticket #371 (Milestone S2.e completion) closed by
- fixed
- 18:22 Ticket #370 (Milestone S2.d completion) closed by
- fixed
- 18:07 Ticket #394 (Milestone S2.m completion) closed by
- fixed
- 18:07 Ticket #394 (Milestone S2.m completion) created by
- Based on 1Q10 reports from DICLOUD and ViSE projects, completed …
- 18:02 DICLOUD edited by
- (diff)
- 18:02 DICLOUD edited by
- (diff)
- 18:00 DICLOUD edited by
- (diff)
- 17:59 DICLOUD edited by
- (diff)
- 17:58 DICLOUD edited by
- (diff)
- 17:57 DICLOUD edited by
- (diff)
- 17:43 Ticket #292 (S2.p milestone completion) closed by
- fixed
- 17:37 ViSE edited by
- (diff)
- 17:34 Ticket #375 (Milestone ViSE: S2.i Demo control of VLAN connections) closed by
- fixed
- 17:30 Ticket #374 (Milestone ViSE: S2.h Import extended ORCA v2.1) closed by
- fixed
- 17:28 Ticket #376 (Milestone ViSE: S2.g Integration of virtualization) closed by
- fixed
- 17:26 Ticket #373 (Milestone ViSE: S2.f Installation of cameras) closed by
- fixed
- 15:10 Ticket #295 (Milestone S2.c completion) closed by
- fixed
- 15:01 LEARN edited by
- (diff)
- 14:55 LEARN edited by
- (diff)
- 14:46 Ticket #365 (Milestone completion for LEARN: S2-i) closed by
- fixed
- 14:08 ScalableMonitoring edited by
- (diff)
- 12:31 GeniFourYearColleges edited by
- (diff)
- 11:51 COGRADIO edited by
- (diff)
- 11:47 COGRADIO edited by
- (diff)
- 11:37 Ticket #389 (OFUWA: S2.a2 Purchase equipment) closed by
- fixed: Arvind writes: […] Sounds good; I'll go ahead and close this …
04/06/10:
- 17:55 Milestone PGINTEGRN: S2.d Experimenters guide completed
- Release a guide for experimenters using ProtoGENI (expanded version of …
- 15:24 MillionNodeGENI edited by
- (diff)
- 15:17 MillionNodeGENI edited by
- (diff)
- 15:07 MillionNodeGENI edited by
- (diff)
- 14:40 gush-qsr-mar10 created by
- 14:37 GushProto edited by
- (diff)
- 14:18 ScalableMonitoring edited by
- (diff)
- 14:13 S3Monitor-QSR-Mar10 created by
- 14:07 ScalableMonitoring edited by
- (diff)
- 14:06 ScalableMonitoring edited by
- (diff)
- 13:59 LEFA edited by
- (diff)
- 13:17 LEFA-QSR-1Q10 edited by
- (diff)
- 13:11 LEFA-QSR-1Q10 edited by
- (diff)
- 13:08 LEFA-QSR-1Q10 created by
- 13:04 LEFA edited by
- (diff)
- 12:42 Internet Scale Overlay Hosting edited by
- (diff)
- 12:34 Internet Scale Overlay Hosting edited by
- (diff)
04/05/10:
- 16:59 OnTime-Mar10 created by
- 16:59 OnTimeMeasure edited by
- (diff)
- 16:58 OnTimeMeasure edited by
- (diff)
- 16:49 sppReport-1Q10 edited by
- (diff)
- 15:19 sppReport-1Q10 edited by
- (diff)
- 15:18 sppReport-1Q10 created by
- 15:17 Internet Scale Overlay Hosting edited by
- (diff)
- 12:33 MillionNodeGENI edited by
- updated to reflect milestone name change using short (component) name … (diff)
- 11:16 DigitalObjectRegistry edited by
- (diff)
- 11:15 Internet Scale Overlay Hosting edited by
- (diff)
- 11:11 Internet Scale Overlay Hosting edited by
- (diff)
04/02/10:
- 14:30 OFCLEM edited by
- Gave up on keeping projects off of their own "related projects" lists (diff)
- 14:20 Ticket #384 (OFPR: S2.a2 Purchase equipment) closed by
- fixed: Scott Karlin says that they've bought two switches that they're …
- 14:18 Ticket #366 (Princeton initial switch purchases) closed by
- fixed: I didn't notice this ticket when I created 384; I'll go ahead …
- 13:37 OFPR edited by
- (diff)
- 13:36 OFPR-2010Q1-status created by
04/01/10:
- 19:36 KanseiSensorNet edited by
- (diff)
- 16:18 WiMAXInteg/CampusInstallation edited by
- (diff)
- 16:01 WiMAXInteg edited by
- (diff)
- 15:53 WiMAXInteg edited by
- (diff)
- 15:48 OFNLR created by
- 15:31 OFI2 created by
- 15:28 Embedded Real-Time Measurements edited by
- (diff)
- 13:42 WiMAXInteg edited by
- (diff)
- 13:36 WiMAXInteg edited by
- (diff)
- 13:34 WiMAXInteg edited by
- (diff)
- 13:33 WiMAXInteg edited by
- (diff)
- 12:10 WiMAXInteg edited by
- (diff)
- 11:59 WiMAXInteg edited by
- (diff)
- 11:56 WiMAXInteg edited by
- (diff)
- 11:52 WiMAXInteg edited by
- (diff)
- 10:29 Ticket #381 (OFIU: S2.a2 Purchase equipment) closed by
- fixed: The 2010-Q1 OFIU quarterly status report has more info about IU's …
- 10:20 Ticket #390 (OFWA: S2.b Campus small deployments) closed by
- fixed: Arvind's slides from GEC 7 say: […] So, I'll go ahead and close …
- 10:16 Ticket #392 (OFUWI: S2.b Campus small deployments) closed by
- fixed: Theo's slides from GEC 7 say […] So, I'll go ahead and close out …
- 09:42 DemoInfo edited by
- (diff)
03/31/10:
- 23:02 OFIU edited by
- (diff)
- 20:24 OnTimeMeasure edited by
- (diff)
- 20:23 OnTimeMeasure edited by
- (diff)
- 20:00 OnTimeMeasure edited by
- (diff)
- 20:00 OnTimeMeasure edited by
- (diff)
- 19:58 OnTimeMeasure edited by
- (diff)
- 19:46 OnTimeMeasure edited by
- (diff)
- 18:36 Milestone MAX: S2.i Common Control Framework Design Update completed
- Continue work with the GENI community to develop an approach for a …
- 18:11 Milestone MAX: S2.l User Tool Evaluation and Development Plan completed
- Review the available user tools across the GENI facilities and …
- 18:05 Milestone MAX: S2.m User Support completed
- Work with and support interested users on use of the DRAGON GENI …
- 18:03 WiMAXInteg/SiteFederation edited by
- (diff)
- 18:02 WiMAXInteg edited by
- (diff)
- 18:00 WiMAXInteg/CampusInstallation edited by
- (diff)
- 18:00 WiMAXInteg edited by
- (diff)
- 17:58 WiMAXInteg/CampusInstallation edited by
- (diff)
- 17:56 Milestone MAX: S2.n DRAGON Aggregate Manager Documentation completed
- Update the design and installation documents for the DRAGON Aggregate …
- 17:55 WiMAXInteg/CampusInstallation edited by
- (diff)
- 17:47 Gec7ClusterEAgenda edited by
- (diff)
- 17:40 Milestone MAX: S2.g NetFPGA as a GENI Resource Implementation completed
- Implement the results of the plan from milestone S2.a. The expected …
- 17:39 Milestone MAX: S2.b NetFPGA as a GENI Resource Plan - completed
- Develop a plan to enable the NetFPGA systems to be generally available …
- 17:27 WiMAXInteg edited by
- (diff)
- 17:24 WiMAXInteg/SiteFederation created by
- 17:20 Gec7ClusterEAgenda edited by
- (diff)
- 17:13 WiMAXInteg/ClientPlatforms edited by
- (diff)
- 16:59 WiMAXInteg/ClientPlatforms edited by
- (diff)
- 16:47 Ticket #307 (Develop slice view prototype with shared data from at least one GENI ...) closed by
- fixed: An available demo, with data coming primarily from PlanetLab is …
- 16:42 Milestone MAX: S2.k Common Control Framework Documentation completed
- Generate a document summarizing the results of interoperability …
- 16:40 Milestone MAX: S2.j Common Control Framework Implementation completed
- Develop an initial common framework implementation sufficient for …
- 16:40 WiMAXInteg/CampusInstallation edited by
- (diff)
- 16:37 WiMAXInteg edited by
- (diff)
- 16:35 Milestone MAX: S2.h DRAGON Aggregate Manager Enhancement Initial Implementation completed
- Complete initial implementation of enhanced DRAGON Aggregate Manager. …
- 16:35 WiMAXInteg edited by
- (diff)
- 16:23 WiMAXInteg edited by
- (diff)
- 15:54 Milestone SPP: S2.n openflow completed
- We also plan to implement OpenFlow-in-a-slice by 3/31/10 Status: …
- 15:53 OFNOX edited by
- (diff)
- 15:49 Ticket #393 (OFSTAN: S2.a Release OpenFlow 1.0) closed by
- fixed: OpenFlow 1.0 was released on Dec 31st 2009, so I'll close out this …
- 15:49 Ticket #393 (OFSTAN: S2.a Release OpenFlow 1.0) created by
- Release OpenFlow 1.0.
- 15:48 OFSTAN edited by
- (diff)
- 15:48 OFSTAN edited by
- (diff)
- 15:31 Ticket #392 (OFUWI: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 15:31 Ticket #391 (OFUWI: S2.a2 Purchase equipment) created by
- Purchase all the equipment needed for deployment in the Spiral 2 …
- 15:28 OFUWI edited by
- (diff)
- 15:24 Ticket #390 (OFWA: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 15:23 Ticket #389 (OFUWA: S2.a2 Purchase equipment) created by
- Purchase all the equipment needed for deployment in the Spiral 2 …
- 15:23 OFUWA edited by
- (diff)
- 15:11 Milestone OFRG: S2.b Campus small deployments completed
- Finish all campus small deployments.
- 15:11 Ticket #388 (OFRG: S2.b Campus small deployments) closed by
- fixed: As Ivan presented at GEC 7, the Rutgers small deployment is done, so …
- 15:10 Ticket #388 (OFRG: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 15:10 Ticket #387 (OFRG: S2.a2 Purchase equipment) created by
- Purchase all the equipment needed for deployment in the Spiral 2 …
- 15:10 OFRG edited by
- (diff)
- 14:45 MPRADIO edited by
- (diff)
- 14:31 Ticket #224 (milestone 1f completion) closed by
- fixed
- 14:29 Ticket #377 (Milestone DICLOUD: S2.e Demo archiving sensor data) closed by
- fixed
- 14:23 Ticket #386 (S2.e completion) closed by
- fixed
- 14:22 Ticket #386 (S2.e completion) created by
- This demo was presented at GEC7 by David Irwin
- 14:17 Ticket #91 (milestone 1d completion) closed by
- fixed
- 14:10 ORBIT edited by
- (diff)
- 14:10 OFPR edited by
- (diff)
- 13:38 Ticket #385 (OFPR: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 13:36 Ticket #384 (OFPR: S2.a2 Purchase equipment) created by
- Purchase all the equipment needed for deployment in the Spiral 2 …
- 13:33 Milestone RAVEN: S2.e rel 3.0 completed
- e) Raven release v3.0 including documentation. (Mar. 31, 2010) …
- 13:27 OFIU edited by
- (diff)
- 13:27 OFCLEM edited by
- (diff)
- 13:27 OFGT edited by
- (diff)
- 12:41 Ticket #383 (OFGT: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 12:39 Milestone OFIU: S2.b Campus small deployments completed
- Finish all campus small deployments.
- 12:39 Ticket #382 (OFIU: S2.b Campus small deployments) closed by
- fixed: Based on the slides Chris presented at the OpenFlow meeting at GEC 7, …
- 12:36 Ticket #382 (OFIU: S2.b Campus small deployments) created by
- Finish all campus small deployments.
- 12:36 Ticket #381 (OFIU: S2.a2 Purchase equipment) created by
- Purchase all the equipment needed for deployment in the Spiral 2 …
- 12:32 OFIU edited by
- (diff)
- 11:52 Milestone GpENI: S2.i web-portal completed
- Create an integrated web-portal for MyPLC and MyVINI within GpENI. …
- 11:43 GewCfp created by
- 11:41 Milestone RAVEN: S2.d pubsub completed
- c) Plan for using Raven as a provisioning service for one other …
- 10:34 Milestone KGENI: S2.b Network Selected completed
- Network (NLR or I2) selected for connection between ETRI Korea and IU. …
- 10:33 Milestone KGENI: S2.a PoC for Response and Escalation completed
- Identify responsible person who can respond to queries from GENI …
- 04:31 Ticket #306 (Document Emergency Stop mechanisms proposed for Spiral 2, and ...) closed by
- fixed
- 00:00 Milestone OFUWA: S2.a2 Purchase equipment completed
- Purchase equipment.
- 00:00 Milestone OFPR: S2.a2 Purchase equipment completed
- Purchase equipment.
- 00:00 Milestone OFUWA: S2.b Campus small deployments completed
- Finish all campus small deployments.
- 00:00 Milestone OFGT: S2.a2 Purchase equipment completed
- Purchase equipment.
- 00:00 Milestone OFNOX: S2.d Release software that supports OpenFlow 1.0 configuration protocol, and NOX API V2 completed
- Release software that supports OpenFlow 1.0 configuration protocol. …
- 00:00 Milestone OFGT: S2.b Campus small deployments completed
- Finish all campus small deployments.
- 00:00 Milestone OFIU: S2.a2 Purchase equipment completed
- Purchase equipment.
- 00:00 Milestone OFUWI: S2.b Campus small deployments completed
- Finish all campus small deployments.
- 00:00 Milestone OFPR: S2.b Campus small deployments completed
- Finish all campus small deployments.