Timeline



04/30/10:

18:08 Milestone PGTools: S2.e Updated user guide completed
Second version of user guide for ProtoGENI experimenter tools. …
17:44 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:37 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:36 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:31 coverletter.pdf attached to WiMAXInteg by hmussman@bbn.com
11:51 Ticket #430 (Milestone completion for LEARN: S2-j Release of Measurement Handler ...) created by dgurkan@uh.edu
Milestone report of the release of measurement handler software. The …
11:50 LEARN edited by dgurkan@uh.edu
(diff)
11:49 GENI_MS2J_LEARN_May01.pdf attached to LEARN by dgurkan@uh.edu
milestone j report
11:49 LEARN edited by dgurkan@uh.edu
link to milestone j report (diff)
10:48 LAMP edited by Vic Thomas
(diff)
10:47 LAMP edited by Vic Thomas
(diff)
10:45 LAMP-FirstQuarter2010 created by Vic Thomas
10:44 GIMSFig2010_03.jpg attached to MeasurementSystem by cthomas@wisc.edu
Diagram of latest GIMS Configuration
00:00 Milestone OFNOX: S2.e Support campus installations of GENI software with AM API completed
Campuses will be installing GENI software with AM API implementation; …

04/29/10:

17:16 LAMP edited by Vic Thomas
(diff)
17:12 LAMP edited by Vic Thomas
(diff)
17:09 LAMP edited by Vic Thomas
(diff)
17:06 LAMP edited by Vic Thomas
(diff)
17:05 GEC7-LAMP.pdf attached to LAMP by Vic Thomas
Presentation at GEC7.
17:02 LAMP edited by Vic Thomas
(diff)
16:57 LAMP edited by Vic Thomas
(diff)
15:04 2010_04_29_GIMS_TODO.txt attached to MeasurementSystem by cthomas@wisc.edu
GIMS GUI "To Do" List as of 2010-04-29
15:01 PGAugmentation edited by Vic Thomas
(diff)

04/28/10:

16:06 2ndInstMeasWork edited by hmussman@bbn.com
(diff)
16:04 042810 InstMeasWorkshopAgenda.pdf attached to 2ndInstMeasWork by hmussman@bbn.com
16:04 2ndInstMeasWork created by hmussman@bbn.com
15:58 GeniInstMeas edited by hmussman@bbn.com
(diff)
15:56 042810 InstMeasWorkshopAgenda.pdf attached to GeniInstMeas by hmussman@bbn.com
14:15 NLR_OF_Deployment_plan_13Apr2010.docx attached to OFNLR by Josh Smift
Text describing NLR's deployment plan
14:14 nlr-deployment-project-schedule.pdf attached to OFNLR by Josh Smift
PDF of NLR's deployment project schedule
12:16 OFI2 edited by Josh Smift
(diff)

04/26/10:

13:07 OFUWI edited by Josh Smift
(diff)
13:06 OFUWI-2010Q1-status created by Josh Smift
11:11 Milestone BGPMux: S2.c BGP-Mux ops transition - completed
BGP-Mux Operations Transition. Support for (non-developer) …

04/23/10:

16:56 Quilt GENI Quarterly Status Report 03312010.pdf attached to Quilt by jen@thequilt.net
16:04 april042310agenda edited by hmussman@bbn.com
(diff)
16:03 april042310agenda created by hmussman@bbn.com
16:02 ClusterD edited by hmussman@bbn.com
(diff)
11:53 GEC7DemoSummary edited by NIDHI
Adding DSL Demo participants (diff)
09:47 Gec4Demos edited by Josh Smift
(diff)
09:37 Gec5Agenda edited by Josh Smift
(diff)
09:36 WikiStart edited by Josh Smift
(diff)
09:01 Ticket #429 (Milestone completion for LEARN: S2-c Establish ORCA control framework) closed by hmussman@bbn.com
fixed

04/22/10:

17:23 IGENI edited by j-mambretti@northwestern.edu
(diff)
17:21 iGENI_Quarterly_Report_Q2_2010Apr1.pdf attached to IGENI by j-mambretti@northwestern.edu
Quarterly Report
16:49 Ticket #429 (Milestone completion for LEARN: S2-c Establish ORCA control framework) created by dgurkan@uh.edu
ORCA control framework instance has been created in the lab for …
16:44 LEARN edited by dgurkan@uh.edu
(diff)
16:42 GENI_S2C_LEARN_Apr23.pdf attached to LEARN by dgurkan@uh.edu
LEARN milestone 2.c Create an ORCA instance in the lab
16:41 Milestone GpENI: S2.j federate completed
Federate with Public PlanetLab using SFA + GENIwrapper + MyPLC. …
16:15 WiMAXInteg edited by hmussman@bbn.com
(diff)
12:42 GEC7DemoSummary edited by Don Kline
(diff)
11:54 GEC7DemoSummary edited by NIDHI
removed ORCABEN vendor demo details. Leaving Ilia to add by himself. (diff)
11:48 GEC7DemoSummary edited by NIDHI
per email request from Ilia to add Openflow demo along with ORCABEN (diff)
11:26 GEC7DemoSummary edited by NIDHI
(diff)
11:26 GEC7DemoSummary edited by hdempsey@bbn.com
remove unneeded graphic (diff)
11:20 GEC7DemoSummary edited by hdempsey@bbn.com
fix punctuation (diff)
11:14 GEC7DemoSummary edited by hdempsey@bbn.com
fix typo (diff)
11:12 GEC7DemoSummary edited by hdempsey@bbn.com
fix punctuation (diff)
10:16 GEC7DemoSummary edited by NIDHI
(diff)
10:13 GEC7DemoSummary edited by NIDHI
(diff)
10:13 GEC7DemoSummary edited by NIDHI
(diff)
09:41 WikiStart edited by hdempsey@bbn.com
Add link to GEC7 Demo Summary page. (diff)
09:08 GEC7DemoSummary edited by NIDHI
(diff)
09:01 Milestone LEARN: S2.c Establish ORCA framework completed
Establish local ORCA control framework, for eventual integration with …
09:01 Gec7Agenda edited by hdempsey@bbn.com
add link to demo summary page with videos, posters, and presentations (diff)

04/21/10:

17:56 GEC7DemoSummary edited by NIDHI
(diff)
17:48 GEC7DemoSummary edited by NIDHI
(diff)
17:42 GEC7DemoSummary edited by NIDHI
(diff)
17:39 GEC7DemoSummary edited by NIDHI
(diff)
17:38 GEC7DemoSummary edited by NIDHI
(diff)
17:28 GEC7DemoSummary edited by NIDHI
(diff)
17:28 Ticket #428 (CMU: GEC7 poster) created by pgunn@cs.cmu.edu
You may find the GEC7 demo linked at: …
17:27 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:23 GEC7DemoSummary edited by NIDHI
(diff)
17:15 GEC7DemoSummary edited by NIDHI
(diff)
17:00 GEC7DemoSummary edited by hdempsey@bbn.com
fix SPP link (diff)
16:59 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:49 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:44 GEC7DemoSummary edited by hdempsey@bbn.com
add "s" for plural participants (diff)
16:42 GEC7DemoSummary edited by hdempsey@bbn.com
punctuation (diff)
15:57 NetKarma_2010Q1_Qtrly_Report.pdf attached to netKarma by robping@indiana.edu
15:56 CRON edited by Seung-Jong Park
(diff)
15:55 CRON edited by Seung-Jong Park
(diff)
15:54 CRON.jpg attached to CRON by Seung-Jong Park
15:53 netKarma edited by robping@indiana.edu
(diff)
15:52 netKarma edited by robping@indiana.edu
(diff)
15:52 netKarma edited by robping@indiana.edu
(diff)
15:48 CRON edited by Seung-Jong Park
(diff)
15:48 CRON edited by Seung-Jong Park
(diff)
15:47 CRON edited by Seung-Jong Park
(diff)
15:46 CRON edited by Seung-Jong Park
(diff)
15:45 control.jpg attached to CRON by Seung-Jong Park
15:44 data-plane.jpg attached to CRON by Seung-Jong Park
15:42 BGPMux edited by feamster@cc.gatech.edu
(diff)
15:42 CRON edited by Seung-Jong Park
(diff)
15:41 CRON edited by Seung-Jong Park
(diff)
15:40 CRON-GENI.png attached to CRON by Seung-Jong Park
15:12 BGPMux edited by feamster@cc.gatech.edu
(diff)
15:11 BGPMux edited by feamster@cc.gatech.edu
(diff)
15:11 BGPMux edited by feamster@cc.gatech.edu
(diff)
15:05 CRON edited by Seung-Jong Park
(diff)
14:58 GEC7DemoSummary edited by NIDHI
(diff)
14:51 GEC7DemoSummary edited by NIDHI
(diff)
14:46 GEC7DemoSummary edited by NIDHI
(diff)
14:26 EnterpriseGeni edited by Josh Smift
(diff)
14:18 OFSTAN edited by Josh Smift
(diff)
14:16 E-GENI-Status-report-Q1-2010.doc attached to OFSTAN by Josh Smift
OFSTAN 2010 Q1 status report
14:11 GEC7DemoSummary edited by hdempsey@bbn.com
add video/audio hint (diff)
14:06 GEC7DemoSummary edited by NIDHI
(diff)
14:05 GEC7DemoSummary edited by NIDHI
(diff)
13:52 GEC7DemoSummary created by hdempsey@bbn.com
13:47 OFPR edited by Josh Smift
(diff)
12:32 scaffold-poster.pdf attached to GEC7Demos by NIDHI
SCAFFOLD Poster
11:55 CRON edited by Seung-Jong Park
(diff)
11:36 OFRG edited by Josh Smift
(diff)
11:34 Ticket #387 (OFRG: S2.a2 Purchase equipment) closed by Josh Smift
fixed: Thanks, Ivan! I'll go ahead and close this one out, and mark the …
10:59 CmuLab edited by Vic Thomas
(diff)
10:12 CRON edited by Seung-Jong Park
(diff)
10:07 SCAFFOLD edited by hdempsey@bbn.com
add Steve Ko, who presented poster at GEC7 (diff)
06:35 Internet Scale Overlay Hosting edited by hdempsey@bbn.com
Add John DeHart, who did GEC demos and helped run SPP tutorial (diff)
03:14 CRON edited by Seung-Jong Park
(diff)
03:12 CRON edited by Seung-Jong Park
(diff)
03:03 Contribution.png attached to CRON by Seung-Jong Park
03:01 CRON edited by Seung-Jong Park
(diff)
02:37 CRON edited by Seung-Jong Park
(diff)
01:52 WeatherMap.png attached to CRON by Seung-Jong Park
00:49 Ticket #427 (milestone S2.d completion) created by Seung-Jong Park
Rspec allows advertising, Request and describing the resources used in …
00:34 Ticket #426 (milestone S2.c completion) created by Seung-Jong Park
An optical fiber between CRON testbed (which was deployed at the first …
00:19 Ticket #425 (Milestone S2.b completion) created by Seung-Jong Park
LONI network has established a 10Gbps connection to Internet2 since …

04/20/10:

21:44 milestone 2b- Draft.docx attached to CRON by Seung-Jong Park
CRON Milestone S2.b
17:07 Quarterly-ExptsSec-report-2.txt edited by hxy@cs.ua.edu
(diff)
17:01 ExptsSec created by hxy@cs.ua.edu
17:00 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
16:17 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
16:10 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:09 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:51 PrimoGENI edited by hdempsey@bbn.com
added students who did GEC7 demo (diff)
15:43 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:39 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:37 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:22 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:11 WiMAXInteg edited by hmussman@bbn.com
(diff)
14:47 WiMAXInteg edited by hmussman@bbn.com
(diff)
14:35 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
13:33 OFBBN edited by Josh Smift
(diff)
11:16 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:15 WiMAXInteg edited by hmussman@bbn.com
(diff)
10:59 OFBBN edited by Josh Smift
(diff)
10:13 OFUWA edited by Josh Smift
(diff)
00:00 Milestone OFRG: S2.a2 Purchase equipment completed
Purchase equipment.

04/19/10:

18:38 ExptsSecurity created by hxy@cs.ua.edu
18:36 Quarterly-ExptsSec-report-2.txt edited by hxy@cs.ua.edu
(diff)
18:32 Quarterly-ExptsSec-report-2.txt created by hxy@cs.ua.edu
18:31 Ticket #304 (Plan for GEC7 demos) closed by hdempsey@bbn.com
fixed
18:10 OFUWI edited by hdempsey@bbn.com
adding folks who did GEC7 demo (diff)
17:52 OFGT edited by hdempsey@bbn.com
add line break (diff)
17:51 OFGT edited by hdempsey@bbn.com
Added Ankur, who did the GEC7 demo (diff)
17:47 OFUWA edited by hdempsey@bbn.com
Added Vjeko, who did the GEC7 demo (diff)
17:20 RavenToProtoGENI created by Vic Thomas
17:19 ProvisioningService edited by Vic Thomas
(diff)
16:19 GpENI edited by Vic Thomas
(diff)
16:17 GpENI edited by Vic Thomas
(diff)
16:15 GpENI edited by Vic Thomas
(diff)
15:58 Mid-Atlantic Crossroads edited by hdempsey@bbn.com
Adding Tom Lehman, who gave MAX demo at GEC7 (diff)
15:28 K-GENI edited by hdempsey@bbn.com
fix typo (diff)
14:55 ProtoGENI edited by Vic Thomas
(diff)
11:33 Ticket #391 (OFUWI: S2.a2 Purchase equipment) closed by Josh Smift
fixed: Aditya writes: […] Sounds good; I'll go ahead and close this one …
11:30 OFSTAN edited by Josh Smift
(diff)
11:15 OFUWI edited by Josh Smift
(diff)
11:11 ProCurve created by Josh Smift
11:09 OFUWA edited by Josh Smift
(diff)
11:06 OFRG edited by Josh Smift
(diff)
10:50 OFIU edited by Josh Smift
(diff)
10:45 FlowVisor created by Josh Smift
10:43 OFCLEM edited by Josh Smift
(diff)
00:08 ExptsSec-initialExpts-findings.pdf attached to ExptsSecurityAnalysis by hxy@cs.ua.edu
Report of the initial experiments abd findings
00:00 Milestone OFUWI: S2.a2 Purchase equipment completed
Purchase equipment.

04/18/10:

23:43 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
23:39 ExptsSec-gec7.pdf attached to ExptsSecurityAnalysis by hxy@cs.ua.edu
GEC7 Presentation

04/16/10:

23:24 ProjTemp-1Q10-status created by Don Kline
23:20 VMI-FED edited by Don Kline
(diff)
23:18 ProjTemp-4Q09-status created by Don Kline
17:55 OFNLR edited by Josh Smift
(diff)
17:54 nlr-backbone-connectivity.jpg attached to OFNLR by Josh Smift
NLR backbone connectivity diagram
17:01 OFUWI edited by Josh Smift
(diff)
17:01 GEC7-openflow-meeting-slides-OFUWI.pdf attached to OFUWI by Josh Smift
Wisconsin's slides from the OpenFlow meeting at GEC 7
17:00 OFUWA edited by Josh Smift
(diff)
17:00 GEC7-openflow-meeting-slides-OFUWA.pdf attached to OFUWA by Josh Smift
Washington's slides from the OpenFlow meeting at GEC 7
17:00 OFRG edited by Josh Smift
(diff)
16:59 OFRG edited by Josh Smift
(diff)
16:59 GEC7-openflow-meeting-slides-OFRG.pdf attached to OFRG by Josh Smift
Rutgers's slides from the OpenFlow meeting at GEC 7
16:58 OFIU edited by Josh Smift
(diff)
16:56 GEC7-openflow-meeting-slides-OFSTAN.pdf attached to OFSTAN by Josh Smift
Stanford's slides from the OpenFlow meeting at GEC 7
16:56 OFSTAN edited by Josh Smift
Added Stanford's slides from the OpenFlow meeting at GEC 7 (diff)
16:54 OFCLEM edited by Josh Smift
Added Clemson's slides from the OpenFlow meeting at GEC 7 (diff)
16:51 GEC7-openflow-meeting-slides-OFCLEM.pdf attached to OFCLEM by Josh Smift
Clemson's slides from the OpenFlow meeting at GEC 7
16:11 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
14:09 SpiralTwo edited by Josh Smift
(diff)
14:08 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
14:08 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
14:07 ExptsSecurityAnalysis edited by hxy@cs.ua.edu
(diff)
13:55 SpiralTwo edited by hdempsey@bbn.com
typo (diff)
13:47 SpiralTwo edited by hdempsey@bbn.com
add Nicira openflow page link (diff)

04/15/10:

18:46 video-ofclem.png attached to GEC7DemoSummary by NIDHI
16:58 Milestone Quilt: S2.c Complete Workshop Program completed
Completed as described in ticket.
16:25 ABAC edited by Stephen Schwab
(diff)
16:25 ABAC edited by Stephen Schwab
(diff)
16:23 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:15 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:11 041510 Quote_5018368.pdf attached to WiMAXInteg by hmussman@bbn.com
15:57 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:49 WiMAXInteg edited by hmussman@bbn.com
(diff)
14:53 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:35 Ticket #424 (Milestone S2.b completion) closed by hmussman@bbn.com
fixed
11:34 Ticket #424 (Milestone S2.b completion) created by hmussman@bbn.com
Per Ivan on 4/7: Radio card demo'd at GEC7
11:31 Ticket #423 (Milestone S2.a completion) closed by hmussman@bbn.com
fixed
11:31 Ticket #423 (Milestone S2.a completion) created by hmussman@bbn.com
Ivan on 4/7: Gathered in wiki, now attached.
11:05 Ticket #422 (Milestone S2.f completion) closed by hmussman@bbn.com
fixed
11:05 Ticket #422 (Milestone S2.f completion) created by hmussman@bbn.com
Ivan on 3/16: Summarized current view of clients at mtg, including …
11:01 Ticket #421 (Milestone S2.d completion) closed by hmussman@bbn.com
fixed
11:01 Ticket #421 (Milestone S2.d completion) created by hmussman@bbn.com
Ivan on 3/4: Has completed connection from WINLAB to NICTA via I2 iON …
10:57 Ticket #420 (Milestone S2.c completion) closed by hmussman@bbn.com
fixed
10:57 Ticket #420 (Milestone S2.c completion) reopened by hmussman@bbn.com
10:56 Ticket #420 (Milestone S2.c completion) closed by hmussman@bbn.com
fixed
10:56 Ticket #420 (Milestone S2.c completion) created by hmussman@bbn.com
Ivan on 4/7: Done at GEC6 on 11/16/09
10:53 Ticket #419 (Milestone S2.a completion) closed by hmussman@bbn.com
fixed
10:53 Ticket #419 (Milestone S2.a completion) created by hmussman@bbn.com
IVAN ON 4/7: Has been available since GEC6 on 11/16/09
10:50 Ticket #172 (milestone 1d completion) closed by hmussman@bbn.com
fixed: Ivan on 4/7: v1.0 code shown at GEC6 demo, on 11/16/09
10:35 Milestone KGENI: S2.c ETRI-IU Connection Live completed
The two institutions are connected and GMOC-dvNOC interoperability …
10:20 photo-igeni.JPG attached to GEC7DemoSummary by NIDHI
10:20 photo-dsl.jpg attached to GEC7DemoSummary by NIDHI
09:44 Ticket #418 (Milestone S2.i completion) created by hmussman@bbn.com
Ivan on 4/7: Every OMF service has a REST interface, with a status. …
09:42 Ticket #417 (Milestone S2.f completion) created by hmussman@bbn.com
Ivan on 3/31: Testing rel 5.3; expect to push into WimAX after May …
09:38 Ticket #416 (Milestone S2.e completion) closed by hmussman@bbn.com
fixed
09:38 Ticket #416 (Milestone S2.e completion) created by hmussman@bbn.com
Ivan on 3/4: Hvae completed L2 connection between WINLAB and NICTA …
09:36 Ticket #415 (Milestone S2.a completion) created by hmussman@bbn.com
Ivan on 3/4: Have completed L2 connection between WINLAB and NICTA …
09:32 Ticket #414 (Milestone S2.d completion) created by hmussman@bbn.com
Per Ivan on 4/7: WiMAX integrated into ORBIT testbed before GEC6. …
09:29 ABAC edited by Vic Thomas
(diff)
09:25 Ticket #413 (Milestone S2.c completion) closed by hmussman@bbn.com
fixed
09:25 Ticket #413 (Milestone S2.c completion) created by hmussman@bbn.com
Per Ivan on 4/7: Done early, with implementation of triplines; …
09:22 Ticket #412 (Milestone S2.b completion) closed by hmussman@bbn.com
fixed
09:22 Ticket #412 (Milestone S2.b completion) created by hmussman@bbn.com
Ivan on 3/31 and 4/7: Plan for federation is to use pub/sub over mgmt …
08:56 PrimoGENIStatusReport2010Q1 edited by liux@cis.fiu.edu
(diff)
08:53 PrimoGENIStatusReport2009Q4 created by liux@cis.fiu.edu
08:49 PrimoGENI edited by liux@cis.fiu.edu
(diff)
08:48 PrimoGENIStatusReport2010Q1 created by liux@cis.fiu.edu
06:05 PlanetLab-1Q10-status edited by acb@cs.princeton.edu
(diff)
06:00 PlanetLab-1Q10-status created by acb@cs.princeton.edu
05:25 PlanetLab edited by acb@cs.princeton.edu
(diff)

04/14/10:

22:47 PrimoGENI edited by liux@cis.fiu.edu
(diff)
21:02 Ticket #411 (Milestone S2.k completion) closed by hmussman@bbn.com
fixed
21:01 Ticket #411 (Milestone S2.k completion) created by hmussman@bbn.com
After GEC7: Ontology workshop held at Duke.
21:00 Ticket #410 (Milestone S2.j completion) closed by hmussman@bbn.com
fixed
21:00 Ticket #410 (Milestone S2.j completion) created by hmussman@bbn.com
Per 1Q10 QSR: First ontology schema is available at …
20:56 Ticket #409 (Milestone S2.h completion) closed by hmussman@bbn.com
fixed
20:56 Ticket #409 (Milestone S2.h completion) created by hmussman@bbn.com
At GEC7: Demonstrated support for provisioning Eucalyptus VMs
20:53 Ticket #357 (ORCA actor registry) closed by hmussman@bbn.com
fixed
20:50 Ticket #356 (Bella 2.1) closed by hmussman@bbn.com
fixed
20:48 Ticket #408 (Milestone S2.j completion) closed by hmussman@bbn.com
fixed
20:48 Ticket #408 (Milestone S2.j completion) created by hmussman@bbn.com
Per 1Q10 SR: Demonstrated at GEC7 demo.
20:44 Ticket #407 (Milestone S2.e completion) closed by hmussman@bbn.com
fixed
20:44 Ticket #407 (Milestone S2.e completion) created by hmussman@bbn.com
Per 1Q10 QSR: Debug and stabilize clearinghouse Code and operational …
20:33 Ticket #355 (Bella 2.1) closed by hmussman@bbn.com
fixed
18:15 Ticket #406 (Demonstration of initial VMI library on cluster nodes at UA (Demo at GEC8)) created by Don Kline
Porting VMI library to ORCA, which has a Xen-based infrastructure. …
18:12 Ticket #405 (Porting VMI library to vServer-based cluster nodes.) created by Don Kline
Porting VMI to myPLC, which has a vServer-based infrastructure. …
18:11 InstrumentationTools edited by Vic Thomas
(diff)
18:01 PGAugmentation edited by Vic Thomas
(diff)
17:02 DOME edited by hmussman@bbn.com
(diff)
16:58 Ticket #396 (Milestone DOME: S2.d completion) closed by hmussman@bbn.com
fixed
16:56 BGPMux edited by Vic Thomas
(diff)
16:54 BGPMux-Coursework.pdf attached to BGPMux by Vic Thomas
BGP Mux based class assignment.
16:51 Ticket #404 (Milestone S2.c completion) closed by hmussman@bbn.com
fixed
16:51 Ticket #404 (Milestone S2.c completion) created by hmussman@bbn.com
A Cisco 6509 router was installed in Chicago before GEC7. It was …
16:39 BGPMux edited by Vic Thomas
(diff)
16:30 BGPMux edited by Vic Thomas
(diff)
15:20 LAMP edited by Vic Thomas
(diff)
14:17 ClusterE edited by hmussman@bbn.com
(diff)
14:16 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:15 GEC7Poster-GENICloud.pdf attached to GEC7Demos by NIDHI
GENICloud Poster
13:06 GENICloud edited by Vic Thomas
(diff)
13:04 GEC7Poster.pdf attached to GENICloud by Vic Thomas
GEC7 poster
12:07 GEC8GEC9DemoPlans edited by hmussman@bbn.com
(diff)
12:04 GEC8GEC9DemoPlans edited by hmussman@bbn.com
(diff)
12:04 GEC8GEC9DemoPlans created by hmussman@bbn.com
11:57 GpENI edited by Vic Thomas
(diff)
11:21 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:12 video-tied.png attached to GEC7DemoSummary by NIDHI
11:11 video-vise.png attached to GEC7DemoSummary by NIDHI
11:11 video-wimax.png attached to GEC7DemoSummary by NIDHI
11:11 video-seattle.png attached to GEC7DemoSummary by NIDHI
11:11 video-s3monitor.png attached to GEC7DemoSummary by NIDHI
11:11 video-protogeni.png attached to GEC7DemoSummary by NIDHI
11:11 video-primogeni.png attached to GEC7DemoSummary by NIDHI
11:11 video-orcaben.png attached to GEC7DemoSummary by NIDHI
11:10 video-ofuwash.2.png attached to GEC7DemoSummary by NIDHI
11:10 video-ofuwash.png attached to GEC7DemoSummary by NIDHI
11:10 video-ofiu.png attached to GEC7DemoSummary by NIDHI
11:10 video-ofgt.png attached to GEC7DemoSummary by NIDHI
11:10 video-max.png attached to GEC7DemoSummary by NIDHI
11:10 video-kgeni.png attached to GEC7DemoSummary by NIDHI
11:10 video-instools.png attached to GEC7DemoSummary by NIDHI
11:09 video-gush.png attached to GEC7DemoSummary by NIDHI
11:09 video-gpeni.png attached to GEC7DemoSummary by NIDHI
11:09 video-gmoc.png attached to GEC7DemoSummary by NIDHI
11:09 video-genicloud.png attached to GEC7DemoSummary by NIDHI
11:09 video-gcii.png attached to GEC7DemoSummary by NIDHI
11:09 video-dome.png attached to GEC7DemoSummary by NIDHI
11:09 video-digobreg.png attached to GEC7DemoSummary by NIDHI
10:41 MilestonesAndTickets edited by Josh Smift
(diff)
09:58 video-cmu.png attached to GEC7DemoSummary by NIDHI
09:53 Kansei.jpg attached to GEC7DemoSummary by NIDHI
09:53 spp.jpg attached to GEC7DemoSummary by NIDHI
09:53 vmi.png attached to GEC7DemoSummary by NIDHI
09:52 vise.jpg attached to GEC7DemoSummary by NIDHI
09:52 raven.jpg attached to GEC7DemoSummary by NIDHI
09:52 protogeni.jpg attached to GEC7DemoSummary by NIDHI
09:52 PlanetLab.jpg attached to GEC7DemoSummary by NIDHI
09:52 ORCA.jpg attached to GEC7DemoSummary by NIDHI
09:52 orbit.jpg attached to GEC7DemoSummary by NIDHI
09:52 million_node_geni.jpg attached to GEC7DemoSummary by NIDHI
09:51 max.png attached to GEC7DemoSummary by NIDHI
09:51 instools.jpg attached to GEC7DemoSummary by NIDHI
09:51 igeni.png attached to GEC7DemoSummary by NIDHI
09:51 gush.jpg attached to GEC7DemoSummary by NIDHI
09:51 gpeni.png attached to GEC7DemoSummary by NIDHI
09:50 gmoc.png attached to GEC7DemoSummary by NIDHI
09:50 genicloud.png attached to GEC7DemoSummary by NIDHI
09:50 cnri.png attached to GEC7DemoSummary by NIDHI
09:50 cmulab.png attached to GEC7DemoSummary by NIDHI
00:00 Milestone OFNLR: S2.a Complete initial deployment plan completed
Complete NLR deployment plan for year 1 (5 cities). Specified cities …

04/13/10:

17:43 Raven4Q10QSR created by Vic Thomas
17:42 ProvisioningService edited by Vic Thomas
(diff)
17:39 Raven1Q10QSR created by Vic Thomas
17:38 ProvisioningService edited by Vic Thomas
(diff)
16:09 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:08 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:43 MilestonesAndTickets edited by Josh Smift
(diff)
15:38 Ticket #403 (OFNLR: S2.a Complete initial deployment plan) created by Josh Smift
Complete NLR deployment plan for year 1 (5 cities). Specified cities …
15:36 Ticket #402 (OFI2: S2.a Complete initial deployment plan) created by Josh Smift
Complete initial Internet2 deployment plan for year 1 (5 cities). …
15:24 Ticket #401 (OFNOX: S2.d Release software that supports OpenFlow 1.0 configuration ...) created by Josh Smift
Release software that supports OpenFlow 1.0 configuration protocol. …
15:22 Ticket #400 (OFNOX: S2.c Initial rough NOX API documentation) created by Josh Smift
Provide initial rough NOX API documentation for OF development team review.
15:18 Ticket #399 (OFNOX: S2.b Release NOX supporting OpenFlow 1.0) closed by Josh Smift
fixed: http://www.openflowswitch.org/wk/index.php/OpenFlow_1.0_release_notes
15:12 Ticket #399 (OFNOX: S2.b Release NOX supporting OpenFlow 1.0) created by Josh Smift
Release software that supports OpenFlow 1.0. In GENI environments. …
15:08 OFNOX edited by Josh Smift
(diff)
15:05 Ticket #398 (OFNOX: S2.a Publish NOX feature list) closed by Josh Smift
fixed: I've attached a PDF that Martin sent to Henry in January with this …
15:01 Ticket #398 (OFNOX: S2.a Publish NOX feature list) created by Josh Smift
Publish NOX feature list with technical descriptions for OpenFlow 1.0 …
14:04 OFUWA edited by Josh Smift
(diff)
13:39 OFUWA-2010Q1-status created by Josh Smift

04/12/10:

17:15 SecureUpdates edited by Vic Thomas
(diff)
17:13 qsr-mar10.pdf attached to SecureUpdates by Vic Thomas
Quarterly Status Report --- March 2010
16:58 Milestone DOME: S2.d Import extended ORCA v2.1 completed
Import an extended GENI-compliant control framework from the ORCA …
14:55 Asset-Valuation-and-Risk-Assesment-Report.pdf attached to ComprehensiveSecurityPgm by Adam Slagell
Version 0.2 of Asset report
12:35 OpticalAccessNets edited by hyeh@bbn.com
(diff)
12:31 status_report-Q1-2010.doc attached to OpticalAccessNets by hyeh@bbn.com
Q1-2010
11:30 BGPMux edited by Vic Thomas
(diff)
10:58 BGPMux edited by Vic Thomas
(diff)
10:37 DOME edited by blynn@cs.umass.edu
(diff)
10:34 DOMEGENI-Y2Q2-status.pdf attached to DOME by blynn@cs.umass.edu
Y2Q2 status report
10:33 GEC7-demo-SPP.pdf attached to GEC7Demos by NIDHI
SPP demo description/presentation
10:03 Milestone DOME: S2.g Include 900MHz radios completed
Implement improved virtualization and experiment control functions, …
10:03 Ticket #397 (Milestone DOME: S2.g completion) closed by hmussman@bbn.com
fixed
10:02 Ticket #296 (MIlestone S2.g completion) closed by hmussman@bbn.com
fixed
10:02 Milestone DOME: S2.e Improve virtualization and experiment control completed
Extend the software for your mobile nodes (bricks), your centralized …
10:01 Ticket #395 (Milestone DOME: S2.e completion) closed by hmussman@bbn.com
fixed
09:18 Ticket #397 (Milestone DOME: S2.g completion) created by blynn@cs.umass.edu
XTend 900 MHz radio development is complete and has been deployed on …
09:15 Ticket #396 (Milestone DOME: S2.d completion) created by blynn@cs.umass.edu
DOME has been built with "bella" release of ORCA. Any functionality …
09:12 Ticket #395 (Milestone DOME: S2.e completion) created by blynn@cs.umass.edu
Various improvements made, including a suite of tools to monitor and …

04/10/10:

14:49 gec7-sharma.pdf attached to Gec7ClusterCAgenda by fahmy@cs.purdue.edu
Puneet Sharma's slides on measurement projects (PDF)

04/09/10:

18:01 GpENI edited by Vic Thomas
(diff)
17:56 MAX-GpENI-interconnection.pdf attached to GpENI by Vic Thomas
Options for interconnecting GpENI with MAX.
17:06 DigitalObjectRegistry edited by Vic Thomas
(diff)
17:05 CNRI-QSR-Q1-2010.pdf attached to DigitalObjectRegistry by Vic Thomas
Quarterly Status Report --- Mar 2010
16:45 april040910agenda created by hmussman@bbn.com
16:43 ClusterD edited by hmussman@bbn.com
(diff)
10:51 Gec7ClusterEAgenda edited by hmussman@bbn.com
(diff)

04/08/10:

17:23 OFBBN.pdf attached to GEC7Demos by NIDHI
OpenFlow Campus Integration trial at BBN
14:44 GEC7-demo-poster.pdf attached to GEC7Demos by NIDHI
Scalable Monitoring GEC7 Poster
14:43 Netkarma_poster_gec7.pdf attached to GEC7Demos by NIDHI
NetKarma GEC7 poster

04/07/10:

18:59 ORCAAUG edited by hmussman@bbn.com
(diff)
18:56 Gec7ClusterDDemos edited by hmussman@bbn.com
(diff)
18:55 ORCABEN edited by hmussman@bbn.com
(diff)
18:54 GEC7 demo.pdf attached to ORCABEN by hmussman@bbn.com
18:53 ORCABEN edited by hmussman@bbn.com
(diff)
18:52 GENI QSR 2010-3-31.pdf attached to ORCABEN by hmussman@bbn.com
18:45 IMF edited by hmussman@bbn.com
(diff)
18:41 Ticket #324 (Submitting milestone S2.d document) closed by hmussman@bbn.com
fixed
18:39 Ticket #323 (Submitting milestone S2.a document) closed by hmussman@bbn.com
fixed
18:33 Ticket #361 (Milestone S2.b completion) closed by hmussman@bbn.com
fixed
18:23 Ticket #371 (Milestone S2.e completion) closed by hmussman@bbn.com
fixed
18:22 Ticket #370 (Milestone S2.d completion) closed by hmussman@bbn.com
fixed
18:07 Ticket #394 (Milestone S2.m completion) closed by hmussman@bbn.com
fixed
18:07 Ticket #394 (Milestone S2.m completion) created by hmussman@bbn.com
Based on 1Q10 reports from DICLOUD and ViSE projects, completed …
18:02 DICLOUD edited by hmussman@bbn.com
(diff)
18:02 DICLOUD edited by hmussman@bbn.com
(diff)
18:00 DICLOUD edited by hmussman@bbn.com
(diff)
17:59 DICLOUD edited by hmussman@bbn.com
(diff)
17:58 DICLOUD edited by hmussman@bbn.com
(diff)
17:57 DICLOUD edited by hmussman@bbn.com
(diff)
17:43 Ticket #292 (S2.p milestone completion) closed by hmussman@bbn.com
fixed
17:37 ViSE edited by hmussman@bbn.com
(diff)
17:36 1Q10 vise-quarterly.pdf attached to ViSE by hmussman@bbn.com
17:34 Ticket #375 (Milestone ViSE: S2.i Demo control of VLAN connections) closed by hmussman@bbn.com
fixed
17:30 Ticket #374 (Milestone ViSE: S2.h Import extended ORCA v2.1) closed by hmussman@bbn.com
fixed
17:28 Ticket #376 (Milestone ViSE: S2.g Integration of virtualization) closed by hmussman@bbn.com
fixed
17:26 Ticket #373 (Milestone ViSE: S2.f Installation of cameras) closed by hmussman@bbn.com
fixed
15:10 Ticket #295 (Milestone S2.c completion) closed by hmussman@bbn.com
fixed
15:01 LEARN edited by hmussman@bbn.com
(diff)
15:00 GENI_QSR_LEARN_Mar30-2010.docx attached to LEARN by hmussman@bbn.com
14:55 LEARN edited by hmussman@bbn.com
(diff)
14:52 GENI_S2H_LEARN_Nov09.pdf attached to LEARN by hmussman@bbn.com
14:46 Ticket #365 (Milestone completion for LEARN: S2-i) closed by hmussman@bbn.com
fixed
14:23 concept of operations 03|10.pdf attached to GENIMetaOps by jph@grnoc.iu.edu
Presentation on Concept of Operations for GEC7
14:22 GMOC OMIS update presentation 03|10.pdf attached to GENIMetaOps by jph@grnoc.iu.edu
Presentation on Emergency Stop for GEC7
14:08 ScalableMonitoring edited by Vic Thomas
(diff)
14:07 GEC7-demo-poster.pdf attached to ScalableMonitoring by Vic Thomas
Poster describing GEC7 demo.
12:31 GeniFourYearColleges edited by hyeh@bbn.com
(diff)
12:25 LangstonGeniReportMarch2010.doc attached to GeniFourYearColleges by hyeh@bbn.com
Q1-2010
11:51 COGRADIO edited by hmussman@bbn.com
(diff)
11:47 COGRADIO edited by hmussman@bbn.com
(diff)
11:37 Ticket #389 (OFUWA: S2.a2 Purchase equipment) closed by Josh Smift
fixed: Arvind writes: […] Sounds good; I'll go ahead and close this …

04/06/10:

17:55 Milestone PGINTEGRN: S2.d Experimenters guide completed
Release a guide for experimenters using ProtoGENI (expanded version of …
15:24 MillionNodeGENI edited by Vic Thomas
(diff)
15:20 project-team.JPG attached to MillionNodeGENI by Vic Thomas
Photo of project team.
15:17 MillionNodeGENI edited by Vic Thomas
(diff)
15:13 qsr-mar10.pdf attached to MillionNodeGENI by Vic Thomas
March 2010 status report.
15:07 MillionNodeGENI edited by Vic Thomas
(diff)
14:40 gush-qsr-mar10 created by Vic Thomas
14:37 GushProto edited by Vic Thomas
(diff)
14:18 ScalableMonitoring edited by Vic Thomas
(diff)
14:13 S3Monitor-QSR-Mar10 created by Vic Thomas
14:07 ScalableMonitoring edited by Vic Thomas
(diff)
14:06 ScalableMonitoring edited by Vic Thomas
(diff)
13:59 LEFA edited by Vic Thomas
(diff)
13:17 LEFA-QSR-1Q10 edited by Vic Thomas
(diff)
13:11 LEFA-QSR-1Q10 edited by Vic Thomas
(diff)
13:08 LEFA-QSR-1Q10 created by Vic Thomas
13:04 LEFA edited by Vic Thomas
(diff)
12:42 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
12:41 GEC7-demo-description.pdf attached to Internet Scale Overlay Hosting by Vic Thomas
GEC7 demo description.
12:34 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
12:32 GEC6-demo-description.pdf attached to Internet Scale Overlay Hosting by Vic Thomas
GEC6 demo description.

04/05/10:

16:59 OnTime-Mar10 created by Vic Thomas
16:59 OnTimeMeasure edited by Vic Thomas
(diff)
16:58 OnTimeMeasure edited by Vic Thomas
(diff)
16:49 sppReport-1Q10 edited by Jon Turner
(diff)
15:19 sppReport-1Q10 edited by Vic Thomas
(diff)
15:18 sppReport-1Q10 created by Vic Thomas
15:17 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
12:33 MillionNodeGENI edited by jwilliams@bbn.com
updated to reflect milestone name change using short (component) name … (diff)
11:16 DigitalObjectRegistry edited by gmanepalli@cnri.reston.va.us
(diff)
11:15 Internet Scale Overlay Hosting edited by Jon Turner
(diff)
11:12 sppInterfaces.png attached to Internet Scale Overlay Hosting by Jon Turner
11:11 GENI_Poster_GEC7.pdf attached to GEC7Demos by gmanepalli@cnri.reston.va.us
CNRI displayed this poster during the GEC7 held in Durham, NC
11:11 Internet Scale Overlay Hosting edited by Jon Turner
(diff)

04/02/10:

20:53 Stitching.pdf attached to GEC7Demos by faber@isi.edu
TIED poster describing our stitching system
20:53 Demo.pdf attached to GEC7Demos by faber@isi.edu
TIED Demonstartion Poster
14:30 OFCLEM edited by Josh Smift
Gave up on keeping projects off of their own "related projects" lists (diff)
14:20 Ticket #384 (OFPR: S2.a2 Purchase equipment) closed by Josh Smift
fixed: Scott Karlin says that they've bought two switches that they're …
14:18 Ticket #366 (Princeton initial switch purchases) closed by Josh Smift
fixed: I didn't notice this ticket when I created 384; I'll go ahead …
13:37 OFPR edited by Josh Smift
(diff)
13:36 OFPR-2010Q1-status created by Josh Smift

04/01/10:

19:36 KanseiSensorNet edited by hzhang@cs.wayne.edu
(diff)
19:34 KanseiGenie_Spiral 2-Winter 2010 StatusReport.pdf attached to KanseiSensorNet by hzhang@cs.wayne.edu
Winter 2010 status report
16:18 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
16:01 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:53 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:48 OFNLR created by Josh Smift
15:31 OFI2 created by Josh Smift
15:28 Embedded Real-Time Measurements edited by caroline@ee.columbia.edu
(diff)
15:26 GENI_QR_ERM_April10.pdf attached to Embedded Real-Time Measurements by caroline@ee.columbia.edu
ERM Quarterly Report (Apr 1, 2010)
13:42 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:36 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:34 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:33 WiMAXInteg edited by hmussman@bbn.com
(diff)
12:10 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:59 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:56 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:52 WiMAXInteg edited by hmussman@bbn.com
(diff)
10:29 Ticket #381 (OFIU: S2.a2 Purchase equipment) closed by Josh Smift
fixed: The 2010-Q1 OFIU quarterly status report has more info about IU's …
10:20 Ticket #390 (OFWA: S2.b Campus small deployments) closed by Josh Smift
fixed: Arvind's slides from GEC 7 say: […] So, I'll go ahead and close …
10:16 Ticket #392 (OFUWI: S2.b Campus small deployments) closed by Josh Smift
fixed: Theo's slides from GEC 7 say […] So, I'll go ahead and close out …
09:42 DemoInfo edited by NIDHI
(diff)

03/31/10:

23:02 OFIU edited by chsmall@grnoc.iu.edu
(diff)
22:54 OFIU-2010Q1-status.pdf attached to OFIU by chsmall@grnoc.iu.edu
IU OpenFlow 2010Q1 report
20:24 OnTimeMeasure edited by Prasad Calyam
(diff)
20:23 OnTimeMeasure edited by Prasad Calyam
(diff)
20:21 GIMA_Design_UseCases.pdf attached to OnTimeMeasure by Prasad Calyam
Use-cases for GENI Instrumentation and Measurement Architecture Design …
20:00 OnTimeMeasure edited by Prasad Calyam
(diff)
20:00 OnTimeMeasure edited by Prasad Calyam
(diff)
19:59 GEC7-OnTimeMeasureGENI-Poster.pdf attached to OnTimeMeasure by Prasad Calyam
GEC7 Demo Poster
19:58 OnTimeMeasure edited by Prasad Calyam
(diff)
19:53 ProtoGENI_UserFeedback_031710.pdf attached to OnTimeMeasure by Prasad Calyam
ProtoGENI User Feedback (OnTimeMeasure Project Experiences)
19:46 OnTimeMeasure edited by Prasad Calyam
(diff)
18:36 Milestone MAX: S2.i Common Control Framework Design Update completed
Continue work with the GENI community to develop an approach for a …
18:11 Milestone MAX: S2.l User Tool Evaluation and Development Plan completed
Review the available user tools across the GENI facilities and …
18:05 Milestone MAX: S2.m User Support completed
Work with and support interested users on use of the DRAGON GENI …
18:03 WiMAXInteg/SiteFederation edited by hmussman@bbn.com
(diff)
18:02 WiMAXInteg edited by hmussman@bbn.com
(diff)
18:00 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
18:00 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:58 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
17:56 Milestone MAX: S2.n DRAGON Aggregate Manager Documentation completed
Update the design and installation documents for the DRAGON Aggregate …
17:55 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
17:47 Gec7ClusterEAgenda edited by hmussman@bbn.com
(diff)
17:40 Milestone MAX: S2.g NetFPGA as a GENI Resource Implementation completed
Implement the results of the plan from milestone S2.a. The expected …
17:39 Milestone MAX: S2.b NetFPGA as a GENI Resource Plan - completed
Develop a plan to enable the NetFPGA systems to be generally available …
17:27 WiMAXInteg edited by hmussman@bbn.com
(diff)
17:24 WiMAXInteg/SiteFederation created by hmussman@bbn.com
17:20 Gec7ClusterEAgenda edited by hmussman@bbn.com
(diff)
17:13 WiMAXInteg/ClientPlatforms edited by hmussman@bbn.com
(diff)
17:07 IU_Openflow_connections.pdf attached to GEC7Demos by NIDHI
Indiana University OpenFlow Campus Trials
16:59 WiMAXInteg/ClientPlatforms edited by hmussman@bbn.com
(diff)
16:47 Ticket #307 (Develop slice view prototype with shared data from at least one GENI ...) closed by cviecco@grnoc.iu.edu
fixed: An available demo, with data coming primarily from PlanetLab is …
16:42 Milestone MAX: S2.k Common Control Framework Documentation completed
Generate a document summarizing the results of interoperability …
16:40 Milestone MAX: S2.j Common Control Framework Implementation completed
Develop an initial common framework implementation sufficient for …
16:40 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
16:37 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:35 Milestone MAX: S2.h DRAGON Aggregate Manager Enhancement Initial Implementation completed
Complete initial implementation of enhanced DRAGON Aggregate Manager. …
16:35 WiMAXInteg edited by hmussman@bbn.com
(diff)
16:23 WiMAXInteg edited by hmussman@bbn.com
(diff)
15:54 Milestone SPP: S2.n openflow completed
We also plan to implement OpenFlow-in-a-slice by 3/31/10 Status: …
15:53 OFNOX edited by Josh Smift
(diff)
15:49 Ticket #393 (OFSTAN: S2.a Release OpenFlow 1.0) closed by Josh Smift
fixed: OpenFlow 1.0 was released on Dec 31st 2009, so I'll close out this …
15:49 Ticket #393 (OFSTAN: S2.a Release OpenFlow 1.0) created by Josh Smift
Release OpenFlow 1.0.
15:48 OFSTAN edited by Josh Smift
(diff)
15:48 OFSTAN edited by Josh Smift
(diff)
15:31 Ticket #392 (OFUWI: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
15:31 Ticket #391 (OFUWI: S2.a2 Purchase equipment) created by Josh Smift
Purchase all the equipment needed for deployment in the Spiral 2 …
15:28 OFUWI edited by Josh Smift
(diff)
15:24 Ticket #390 (OFWA: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
15:23 Ticket #389 (OFUWA: S2.a2 Purchase equipment) created by Josh Smift
Purchase all the equipment needed for deployment in the Spiral 2 …
15:23 OFUWA edited by Josh Smift
(diff)
15:11 Milestone OFRG: S2.b Campus small deployments completed
Finish all campus small deployments.
15:11 Ticket #388 (OFRG: S2.b Campus small deployments) closed by Josh Smift
fixed: As Ivan presented at GEC 7, the Rutgers small deployment is done, so …
15:10 Ticket #388 (OFRG: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
15:10 Ticket #387 (OFRG: S2.a2 Purchase equipment) created by Josh Smift
Purchase all the equipment needed for deployment in the Spiral 2 …
15:10 OFRG edited by Josh Smift
(diff)
14:50 2010-03-31 GENI DiCloud q2 report.pdf attached to DICLOUD by cecchet@cs.umass.edu
14:45 MPRADIO edited by hmussman@bbn.com
(diff)
14:44 1740-Clemson-Programmable-Radio-Report-10Q1.pdf attached to MPRADIO by hmussman@bbn.com
14:31 Ticket #224 (milestone 1f completion) closed by hmussman@bbn.com
fixed
14:29 Ticket #377 (Milestone DICLOUD: S2.e Demo archiving sensor data) closed by cecchet@cs.umass.edu
fixed
14:28 GEC7 demo.pdf attached to DICLOUD by cecchet@cs.umass.edu
GEC7 demo description (missing the EC2 resource bridged through ViSE)
14:23 Ticket #386 (S2.e completion) closed by cecchet@cs.umass.edu
fixed
14:22 Ticket #386 (S2.e completion) created by cecchet@cs.umass.edu
This demo was presented at GEC7 by David Irwin
14:17 Ticket #91 (milestone 1d completion) closed by hmussman@bbn.com
fixed
14:10 ORBIT edited by hmussman@bbn.com
(diff)
14:10 OFPR edited by Josh Smift
(diff)
14:08 GENI OMF Yearly Project Status Report 3Q09 .pdf attached to ORBIT by hmussman@bbn.com
13:38 Ticket #385 (OFPR: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
13:36 Ticket #384 (OFPR: S2.a2 Purchase equipment) created by Josh Smift
Purchase all the equipment needed for deployment in the Spiral 2 …
13:35 IU_Openflow_connections.pdf attached to OFIU by chsmall@grnoc.iu.edu
IU Openflow Connectivity Diagram
13:34 IU_Openflow_All3.pdf attached to OFIU by chsmall@grnoc.iu.edu
IU Openflow Campus Diagram as of March 2010
13:33 Milestone RAVEN: S2.e rel 3.0 completed
e) Raven release v3.0 including documentation. (Mar. 31, 2010) …
13:29 IU_Openflow-GEC7.pdf attached to OFIU by chsmall@grnoc.iu.edu
Poster for GEC7 Demo
13:27 OFIU edited by Josh Smift
(diff)
13:27 OFCLEM edited by Josh Smift
(diff)
13:27 OFGT edited by Josh Smift
(diff)
12:41 Ticket #383 (OFGT: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
12:39 Milestone OFIU: S2.b Campus small deployments completed
Finish all campus small deployments.
12:39 Ticket #382 (OFIU: S2.b Campus small deployments) closed by Josh Smift
fixed: Based on the slides Chris presented at the OpenFlow meeting at GEC 7, …
12:36 Ticket #382 (OFIU: S2.b Campus small deployments) created by Josh Smift
Finish all campus small deployments.
12:36 Ticket #381 (OFIU: S2.a2 Purchase equipment) created by Josh Smift
Purchase all the equipment needed for deployment in the Spiral 2 …
12:32 OFIU edited by Josh Smift
(diff)
12:30 indiana-connectivity.2.png attached to OFIU by Josh Smift
Indiana connectivity diagram
11:52 Milestone GpENI: S2.i web-portal completed
Create an integrated web-portal for MyPLC and MyVINI within GpENI. …
11:43 GewCfp created by Mark Berman
11:41 Milestone RAVEN: S2.d pubsub completed
c) Plan for using Raven as a provisioning service for one other …
10:34 Milestone KGENI: S2.b Network Selected completed
Network (NLR or I2) selected for connection between ETRI Korea and IU. …
10:33 Milestone KGENI: S2.a PoC for Response and Escalation completed
Identify responsible person who can respond to queries from GENI …
04:31 Ticket #306 (Document Emergency Stop mechanisms proposed for Spiral 2, and ...) closed by cviecco@grnoc.iu.edu
fixed
00:00 Milestone OFUWA: S2.a2 Purchase equipment completed
Purchase equipment.
00:00 Milestone OFPR: S2.a2 Purchase equipment completed
Purchase equipment.
00:00 Milestone OFUWA: S2.b Campus small deployments completed
Finish all campus small deployments.
00:00 Milestone OFGT: S2.a2 Purchase equipment completed
Purchase equipment.
00:00 Milestone OFNOX: S2.d Release software that supports OpenFlow 1.0 configuration protocol, and NOX API V2 completed
Release software that supports OpenFlow 1.0 configuration protocol. …
00:00 Milestone OFGT: S2.b Campus small deployments completed
Finish all campus small deployments.
00:00 Milestone OFIU: S2.a2 Purchase equipment completed
Purchase equipment.
00:00 Milestone OFUWI: S2.b Campus small deployments completed
Finish all campus small deployments.
00:00 Milestone OFPR: S2.b Campus small deployments completed
Finish all campus small deployments.
Note: See TracTimeline for information about the timeline view.