#8 |
need README, LICENSE files
|
feamster@cc.gatech.edu
|
major
|
BGPMux: BGP Mux 0.1 sw release
|
BGPMUX
|
SPIRAL1
|
#21 |
DTUNNEL repository is not publicly readable
|
feamster@cc.gatech.edu
|
major
|
BGPMux: BGP Mux 0.1 sw release
|
BGPMUX
|
SPIRAL1
|
#22 |
User README is missing needed context
|
feamster@cc.gatech.edu
|
minor
|
BGPMux: BGP Mux 0.1 sw release
|
BGPMUX
|
SPIRAL1
|
#74 |
Extend ProtoGENI clearinghouse to support topology creation
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Define RSpec -
|
BGPMUX
|
SPIRAL1
|
#75 |
Implement component manager that supports the ProtoGENI API
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Integrate with ProtoGENI -
|
BGPMUX
|
SPIRAL1
|
#155 |
DTUNNELS GEC5 demo
|
feamster@cc.gatech.edu
|
major
|
|
BGPMUX
|
SPIRAL1
|
#181 |
Define ProtoGENI RSpec for BGP Mux and tunnels
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Define RSpec -
|
BGPMUX
|
SPIRAL1
|
#201 |
Extend BGP-Mux software release to include ProtoGENI compatible Aggregate Manager
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Make BGP mux and tunnel software available -
|
GPO
|
SPIRAL1
|
#302 |
OFGT: S2.a1 Select vendors
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a1 Select vendors
|
OFGT
|
SPIRAL2
|
#380 |
OFGT: S2.a2 Purchase equipment
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a2 Purchase equipment
|
OFGT
|
SPIRAL2
|
#383 |
OFGT: S2.b Campus small deployments
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.b Campus small deployments
|
OFGT
|
SPIRAL2
|
#589 |
OFGT: S2.c Install GENI software with AM API implementation
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.c Install GENI software with AM API implementation
|
OFGT
|
SPIRAL2
|
#590 |
OFGT: S2.d Begin integration testing with Stanford and BBN
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.d Begin integration testing with Stanford and BBN
|
OFGT
|
SPIRAL2
|
#591 |
OFGT: S2.e Plan and engineer GEC 9 demo
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.e Plan and engineer GEC 9 demo
|
OFGT
|
SPIRAL2
|
#7 |
PlanetLab: component and clearinghouse release v0.1
|
Aaron Falk
|
major
|
PlanetLab: component and clearinghouse release v0.1
|
GPO
|
SPIRAL1
|
#115 |
Develop alternate spiral-1 outreach milestone
|
Aaron Falk
|
major
|
BGPMux: Virtual Network with BGPMux How-To --
|
GPO
|
SPIRAL1
|
#180 |
Milestone revision for clarity, due date change
|
Aaron Falk
|
major
|
BGPMux: Define RSpec -
|
BGPMUX
|
SPIRAL1
|
#182 |
Milestone revision for clarity, due date change
|
Aaron Falk
|
major
|
BGPMux: Integrate with ProtoGENI -
|
BGPMUX
|
SPIRAL1
|
#183 |
Milestone date change
|
Aaron Falk
|
major
|
BGPMux: Make BGP mux and tunnel software available -
|
BGPMUX
|
SPIRAL1
|
#184 |
initial how-to draft available
|
Aaron Falk
|
major
|
BGPMux: Virtual Network with BGPMux How-To --
|
BGPMUX
|
SPIRAL1
|
#512 |
Software release completed (30 Jun 20910)
|
faber@isi.edu
|
major
|
TIED: S2.c Fedd release with ProtGeni plug-in
|
GPO
|
SPIRAL2
|
#901 |
CENICREGIONAL: S4.b Deploy switches and bring up test connections
|
erick@cenic.org
|
major
|
CENICREGIONAL: S4.b Deploy switches and bring up test connections
|
CENICREGIONAL
|
SPIRAL4
|
#514 |
Milestone IMF S2.b completion
|
Rudra Dutta
|
major
|
IMF: S2.b Initial ontology for measurement
|
IMF
|
SPIRAL2
|
#515 |
Milestone IMF: S2.g completion
|
Rudra Dutta
|
major
|
IMF: S2.g Protocol between SILO and IMF
|
IMF
|
SPIRAL2
|
#516 |
Milestone S2.c completion
|
Rudra Dutta
|
major
|
IMF: S2.c First GENI instrumentation and measurement architecture
|
IMF
|
SPIRAL2
|
#517 |
Milestone IMF: S2.h completion
|
Rudra Dutta
|
major
|
IMF: S2.h Update the IMF software
|
IMF
|
SPIRAL2
|
#1085 |
Stitching slivers /etc/hosts entries incorrect for remote nodes
|
duerig@flux.utah.edu
|
major
|
|
STITCHING
|
SPIRAL5
|
#1086 |
Unable to exchange Iperf tcp data traffic between PG and IG nodes
|
duerig@flux.utah.edu
|
major
|
|
STITCHING
|
SPIRAL5
|
#1097 |
Stitching request for two links between InstaGENI nodes fails while VLANs are available
|
duerig@flux.utah.edu
|
major
|
|
STITCHING
|
SPIRAL5
|
#24 |
need to make draft RSpec proposals public
|
duerig@cs.utah.edu
|
major
|
CMU Lab: Formulate initial RSpecs for wireless nodes
|
CMULAB
|
SPIRAL1
|
#281 |
RSpec extension spec
|
duerig@bas.flux.utah.edu
|
major
|
PGINTEGRN: S2.b RSpec extension spec
|
GPO
|
SPIRAL2
|
#365 |
Milestone completion for LEARN: S2-i
|
dgurkan@uh.edu
|
major
|
LEARN: S2.i Implement and integrate Measurement Handler
|
LEARN
|
SPIRAL2
|
#429 |
Milestone completion for LEARN: S2-c Establish ORCA control framework
|
dgurkan@uh.edu
|
major
|
LEARN: S2.c Establish ORCA framework
|
LEARN
|
SPIRAL2
|
#430 |
Milestone completion for LEARN: S2-j Release of Measurement Handler Software
|
dgurkan@uh.edu
|
major
|
LEARN: S2.j Deliver release of Measurement Handler
|
GPO
|
SPIRAL2
|
#3 |
Bring up OpenVPN tunnels between CMU Lab and ProtoGENI
|
dga@cs.cmu.edu
|
major
|
CMU Lab: Tunneling packets from Utah to CMU
|
CMULAB
|
SPIRAL1
|
#25 |
make initial two nodes 'operational'
|
dga@cs.cmu.edu
|
major
|
CMU Lab: deploy and operate 2 HomeNet nodes in CMU lab
|
GPO
|
SPIRAL1
|
#34 |
Initial CMULab code merged with ProtoGENI
|
dga@cs.cmu.edu
|
major
|
CMU Lab: Merge patches into ProtoGENI distribution
|
CMULAB
|
SPIRAL1
|
#58 |
Need additional configuration documentation
|
dga@cs.cmu.edu
|
major
|
CMU Lab: desired node config & boot mgmt functionality
|
GPO
|
SPIRAL1
|
#62 |
Complete bringing 5 HomeNet nodes up
|
dga@cs.cmu.edu
|
major
|
CMU Lab: Deploy and commence operations of 5 residential HomeNet nodes
|
GPO
|
SPIRAL1
|
#174 |
confirm CMUlab control plane integration
|
dga@cs.cmu.edu
|
major
|
CMU Lab: integrate with ProtoGENI control plane
|
GPO
|
SPIRAL1
|
#1246 |
request for GENI-VIRO demo at GEC20
|
Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.)
|
major
|
|
GPO
|
SPIRAL6
|
#1247 |
request for GENI-VIRO demo at GEC20
|
Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.)
|
major
|
|
GPO
|
SPIRAL6
|
#130 |
Requirements for GMOC demo at GEC5
|
cviecco@grnoc.iu.edu
|
major
|
GMOC: S1.b Demonstrate initial GMOC Framework Implementation at a GEC
|
GMOC
|
SPIRAL1
|
#164 |
Get feedback on specialized operational dataset definitions
|
cviecco@grnoc.iu.edu
|
major
|
GMOC: S1.a.a Complete initial GMOC Operational Dataset Translater Implementation
|
GMOC
|
SPIRAL1
|
#306 |
Document Emergency Stop mechanisms proposed for Spiral 2, and prototype with GENI projects
|
cviecco@grnoc.iu.edu
|
major
|
GMOC: S2.b Prototype manual emergency shutdown
|
GMOC
|
SPIRAL2
|
#1019 |
ION AM Ad lists wrong AM URL
|
ckotil@grnoc.iu.edu
|
major
|
|
I2AM
|
SPIRAL5
|
#1020 |
ION AM Ad does not use stitching namespace
|
ckotil@grnoc.iu.edu
|
critical
|
|
I2AM
|
SPIRAL5
|
#1032 |
The ION aggregate should trust ch.geni.net
|
ckotil@grnoc.iu.edu
|
major
|
|
I2AM
|
SPIRAL5
|
#1035 |
Circuit status falls back from 'ready' into 'changing' in sliverstatus query
|
ckotil@grnoc.iu.edu
|
major
|
|
GPO
|
SPIRAL5
|
#1036 |
Advertisement rspec for internet2 aggregate does not pass rspeclint
|
ckotil@grnoc.iu.edu
|
minor
|
|
I2AM
|
SPIRAL5
|
#1045 |
ION/I2 Aggregate fails to create circuit 51 times for one create sliver
|
ckotil@grnoc.iu.edu
|
blocker
|
|
I2AM
|
SPIRAL5
|
#1047 |
ION/I2 Aggregate fails reports error for link that does not go through ION
|
ckotil@grnoc.iu.edu
|
major
|
|
I2AM
|
SPIRAL5
|
#1094 |
'Path Setup failed with error from PSSSetup' reported for I2/ION aggregate
|
ckotil@grnoc.iu.edu
|
major
|
|
I2AM
|
SPIRAL5
|
#1205 |
Unknown internal failure reported by ION aggregate for complex topology
|
ckotil@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1209 |
Mismatch in getversion code_tag and for ION and MAX aggregates
|
ckotil@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#202 |
No carrier on ProtoGENI HP switch port A19 at I2 SALT
|
chsmall@indiana.edu
|
major
|
|
PROTOGENI
|
SPIRAL1
|
#593 |
OFIU: S2.d Begin integration testing with Stanford and BBN
|
chsmall@indiana.edu
|
major
|
OFIU: S2.d Begin integration testing with Stanford and BBN
|
OFIU
|
SPIRAL2
|
#594 |
OFIU: S2.e Plan and engineer GEC 9 demo
|
chsmall@indiana.edu
|
major
|
OFIU: S2.e Plan and engineer GEC 9 demo
|
OFIU
|
SPIRAL2
|
#595 |
OFIU: S2.f Upgrade small deployments to use OF 1.0
|
chsmall@indiana.edu
|
major
|
OFIU: S2.f Upgrade small deployments to use OF 1.0
|
OFIU
|
SPIRAL2
|
#157 |
schedule node installations
|
chsmall@grnoc.iu.edu
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
PROTOGENI
|
SPIRAL1
|
#162 |
First SPP node shipped
|
chsmall@grnoc.iu.edu
|
major
|
SPP: Deploy three SPP nodes -
|
SPP
|
SPIRAL1
|
#250 |
SPP GPE Board failure at Salt Lake City Pop
|
chsmall@grnoc.iu.edu
|
major
|
|
SPP
|
SPIRAL1
|
#305 |
OFIU: S2.a1 Select vendors
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.a1 Select vendors
|
OFIU
|
SPIRAL2
|
#381 |
OFIU: S2.a2 Purchase equipment
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.a2 Purchase equipment
|
OFIU
|
SPIRAL2
|
#382 |
OFIU: S2.b Campus small deployments
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.b Campus small deployments
|
OFIU
|
SPIRAL2
|
#592 |
OFIU: S2.c Install GENI software with AM API implementation
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.c Install GENI software with AM API implementation
|
OFIU
|
SPIRAL2
|
#185 |
Make prototype available to GENI researchers
|
chris@maxgigapop.net
|
major
|
MAX: Make a working prototype
|
MAX
|
SPIRAL1
|
#186 |
Integrate DRAGON with a GENI CF
|
chris@maxgigapop.net
|
major
|
MAX: Integrate DRAGON/GENI control framework
|
MAX
|
SPIRAL1
|
#187 |
Integrate DRAGON/GENI CF with DRAGON testbed
|
chris@maxgigapop.net
|
major
|
MAX: Integrate DRAGON/GRMS
|
GPO
|
SPIRAL1
|
#193 |
MAX connection over I2 to ProtoGENI
|
chris@maxgigapop.net
|
major
|
|
MAX
|
SPIRAL1
|
#196 |
MAX outreach
|
chris@maxgigapop.net
|
major
|
MAX: Specific contribution to GENI outreach
|
GPO
|
SPIRAL1
|
#212 |
Milestone MAX: Delivery of preliminary design doc
|
chris@maxgigapop.net
|
major
|
MAX: Delivery of preliminary design doc
|
GPO
|
SPIRAL1
|
#132 |
MANFRED/MAX GEC5 demo
|
Christopher Small
|
major
|
MAX: Make a working prototype
|
MAX
|
SPIRAL1
|
#255 |
NetKarma White Paper
|
chris@bbn.com
|
major
|
|
NETKARMA
|
SPIRAL2
|
#289 |
NetKarma Dec 2009 Milestones
|
chris@bbn.com
|
major
|
NETKARMA: S2.c identify tools
|
GPO
|
SPIRAL2
|
#14 |
unable to associate milestone with ticket
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#27 |
Open SECARCH ticket doesn't show up under SECARCH milestone in Roadmap.
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL1
|
#222 |
New Milestone macro for trac wiki
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#229 |
Create mailing list for new Instrumentation and Measurement Working Group
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#230 |
difficulty entering text into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#231 |
batch entry of milestones into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#252 |
wiki login for Michael Freedman @ Princeton, password help
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#256 |
PlanetLab cluster mailing list on lists.geni.net
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#303 |
Seung-Jong Park needs wiki password reset.
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#436 |
please revert kell.gpolab vm to snapshot-1.
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#497 |
Need mailing list for gush-users.
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#559 |
Please create GEC9 report link for Ticket Reports section on public geni wiki and remove GEC8 link
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#683 |
Create mailing list: genicloud-users@geni.net
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#689 |
Plan for GEC10 demos
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#692 |
Demo space for MNG / Seattle
|
chaos@bbn.com
|
major
|
|
MILNGENI
|
SPIRAL3
|
#693 |
Demo for Secure Updates...
|
chaos@bbn.com
|
major
|
|
SECUREUPDATES
|
SPIRAL3
|
#694 |
KanseiGenie GEC10 demo
|
chaos@bbn.com
|
major
|
|
KANSEI
|
SPIRAL3
|
#695 |
The Kentucky Portal and Archival System
|
chaos@bbn.com
|
major
|
|
INSTOOLS
|
SPIRAL3
|
#697 |
Wisconsin Mobile Offloading GEC10 Demo
|
chaos@bbn.com
|
major
|
|
OFUWI
|
SPIRAL3
|
#698 |
OpenFlow GEC10 Demo
|
chaos@bbn.com
|
major
|
|
OFIU
|
SPIRAL3
|
#699 |
MPLS-OpenFlow based access/aggregation network
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#700 |
GEC10 Demo for Washington University SPP Project
|
chaos@bbn.com
|
major
|
|
SPP
|
SPIRAL3
|
#701 |
OnTimeMeasure GEC10 Demo
|
chaos@bbn.com
|
major
|
|
ONTIME
|
SPIRAL3
|
#702 |
GPO Wimax Demo
|
chaos@bbn.com
|
major
|
|
WIMAX
|
SPIRAL3
|
#703 |
GEC10 demo request - OFCLEM
|
chaos@bbn.com
|
major
|
|
OFCLEM
|
SPIRAL3
|