Opened 14 years ago

Closed 9 years ago

#250 closed (wontfix)

SPP GPE Board failure at Salt Lake City Pop

Reported by: jdd@arl.wustl.edu Owned by: chsmall@grnoc.iu.edu
Priority: major Milestone:
Component: SPP Version: SPIRAL1
Keywords: Cc:
Dependencies:

Description

One of the two GPEs in the SPP Chassis at the Salt Lake City Pop has failed. It will need to be replaced. There are two possible avenues to replacing it as we see it.

  1. We could send a replacement to I2 and have them replace it next time they have a scheduled trip to that Pop.
  1. We could bring a replacement (or ship it to Utah) to GEC6 and have someone there give us access to the I2 Pop. Of course, this is assuming that there is someone at GEC6 that would have time and access to the Pop.

We have a work around in place that allows us to operate the SPP node with just one GPE. There is no pressing need to replace the failed GPE before the GEC6 demonstration. In fact, we would probably prefer not to perturb things by replacing it before the demonstration.

This failure appears to be similar to the failure we had with the LC at Kansas City which has already been fixed. That failed LC board is now in the hands our the manufacturer for diagnosis and repair.

Change History (2)

comment:1 Changed 14 years ago by chaos@bbn.com

Owner: changed from somebody to chsmall@grnoc.iu.edu

Chris:

I'm sorry this fell through the cracks in our system --- we don't really have a policy for time-sensitive ops tickets on the GENI wiki yet. I assume JD is planning to bring the board to GEC anyway, but wanted to give you what heads-up i could.

Thanks.

comment:2 Changed 9 years ago by hdempsey@bbn.com

Resolution: wontfix
Status: newclosed
Note: See TracTickets for help on using tickets.