#194 |
Complete OpenFlow workshop
|
nickm@stanford.edu
|
major
|
ENTGENI: Host OpenFlow workshop at Stanford
|
GPO
|
SPIRAL1
|
#196 |
MAX outreach
|
chris@maxgigapop.net
|
major
|
MAX: Specific contribution to GENI outreach
|
GPO
|
SPIRAL1
|
#198 |
Complete control plane integration of three Spiral 1 backbone nodes
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: Control Plane integration of backbone nodes
|
GPO
|
SPIRAL1
|
#199 |
Complete L2 control of I2 nodes.
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: L2 control in backbone nodes
|
GPO
|
SPIRAL1
|
#200 |
Verify cluster mates have needed CF support
|
ricci@flux.utah.edu
|
major
|
ProtoGENI: control plane integration of cluster-mates
|
GPO
|
SPIRAL1
|
#201 |
Extend BGP-Mux software release to include ProtoGENI compatible Aggregate Manager
|
feamster@cc.gatech.edu
|
major
|
BGPMux: Make BGP mux and tunnel software available -
|
GPO
|
SPIRAL1
|
#204 |
need documentation of milestone completion
|
prs@cs.cmu.edu
|
major
|
CMU Lab: student testbed use
|
GPO
|
SPIRAL1
|
#206 |
Completion of initial GMOC framework demostration milestone.
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b Demonstrate initial GMOC Framework Implementation at a GEC
|
GPO
|
SPIRAL1
|
#207 |
Completion of initial GMOC Dataset Translater Implementation
|
hdempsey@bbn.com
|
major
|
GMOC: S1.a.a Complete initial GMOC Operational Dataset Translater Implementation
|
GPO
|
SPIRAL1
|
#208 |
Competion of milestone initial GMOC Data Exchanger Implementation
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.b Complete initial GMOC Data Exchanger Implementation
|
GPO
|
SPIRAL1
|
#209 |
Milestone completion: Complete initial implementation of prototype GMOC
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.c Complete initial implementation of prototype GMOC
|
GPO
|
SPIRAL1
|
#210 |
Completion of Milestone Emergency Stop and Notifications.
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.d Complete initial implementation of Emergency Stop and notifications
|
GPO
|
SPIRAL1
|
#211 |
Competion of task: Draft GENI Concept of Operations
|
hdempsey@bbn.com
|
major
|
GMOC: S1.a Draft GENI Concept of Operations
|
GPO
|
SPIRAL1
|
#212 |
Milestone MAX: Delivery of preliminary design doc
|
chris@maxgigapop.net
|
major
|
MAX: Delivery of preliminary design doc
|
GPO
|
SPIRAL1
|
#213 |
Integration and Documentation proceeding
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.c Integrate and Document Instrumentation Toolset
|
GPO
|
SPIRAL1
|
#214 |
Provide pointer to AM and tools software and information on how GENI community may request access UKY aggregate.
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.d Deploy AM and open UKY Edulab for GENI
|
GPO
|
SPIRAL1
|
#215 |
Document integrated experimentation
|
somebody
|
major
|
CMU Lab: Integrated experimentation between CMU testbeds
|
GPO
|
SPIRAL1
|
#216 |
Plan for GEC6 demonstrations
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#217 |
SPP arch doc
|
somebody
|
major
|
SPP: Architecture and Design Documentation (Draft)
|
GPO
|
SPIRAL1
|
#218 |
Deploy three SPP nodes
|
somebody
|
major
|
SPP: Deploy three SPP nodes -
|
GPO
|
SPIRAL1
|
#220 |
Plan for GEC6 demos
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#245 |
contribute to GpENI outreach
|
somebody
|
major
|
GpENI: Testbed available for limited external research
|
GPO
|
SPIRAL1
|
#246 |
GpENI: S2.d access
|
somebody
|
major
|
GpENI: S2.d access
|
GPO
|
SPIRAL2
|
#247 |
update gpeni to latest geniwrapper
|
somebody
|
major
|
GpENI: S2.a new geniwrapper
|
GPO
|
SPIRAL2
|
#249 |
GpENI: S2.b study DCN in GpENI
|
somebody
|
major
|
GpENI: S2.b study DCN in GpENI
|
GPO
|
SPIRAL2
|
#252 |
wiki login for Michael Freedman @ Princeton, password help
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#254 |
SECUREUPDATES: S2.a overview
|
somebody
|
major
|
SECUREUPDATES: S2.a overview
|
GPO
|
SPIRAL2
|
#257 |
VMI-FED S2.a demo VIX at GEC6
|
somebody
|
major
|
VMI-FED: S2.a VIX demo
|
GPO
|
SPIRAL2
|
#272 |
ProtoGENI security POC identified
|
ricci@cs.utah.edu
|
major
|
ProtoGENI.S2.a: Security POC
|
GPO
|
SPIRAL1
|
#273 |
ProtoGENI Component/Aggregate Manager API V2 Document
|
ricci@cs.utah.edu
|
major
|
PGINTEGRN: S2.a API document
|
GPO
|
SPIRAL1
|
#276 |
Providing CM for VLAN creation on backbone switches to other projects
|
Leigh Stoller
|
major
|
ProtoGENI.S2.e: ProtoGENI backbone resources available to other clusters
|
GPO
|
SPIRAL1
|
#277 |
SNMP counters on ProtoGENI switches to other projects
|
ricci@cs.utah.edu
|
major
|
ProtoGENI.S2.f: Improved interfaces
|
GPO
|
SPIRAL1
|
#279 |
milestone S2.a completion
|
hmussman@bbn.com
|
major
|
ERM: S2.a Prototype UMF software
|
GPO
|
SPIRAL2
|
#281 |
RSpec extension spec
|
duerig@bas.flux.utah.edu
|
major
|
PGINTEGRN: S2.b RSpec extension spec
|
GPO
|
SPIRAL2
|
#286 |
Milestone S2.g completion
|
hmussman@bbn.com
|
major
|
ORCABEN: S2.g Cluster plan for VLANs between testbeds
|
GPO
|
SPIRAL1
|
#288 |
Spiral 2: Prototyping plans milestone completed
|
somebody
|
major
|
GMOC: S2.a Spiral 2 prototyping plans
|
GPO
|
SPIRAL2
|
#289 |
NetKarma Dec 2009 Milestones
|
chris@bbn.com
|
major
|
NETKARMA: S2.c identify tools
|
GPO
|
SPIRAL2
|
#301 |
MetaVPN software is usable
|
Vic Thomas
|
major
|
|
GPO
|
SPIRAL2
|
#303 |
Seung-Jong Park needs wiki password reset.
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#304 |
Plan for GEC7 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#321 |
ProtoGENI Demo at GEC#7
|
NIDHI
|
major
|
PGTools: S2.d Demonstration
|
GPO
|
SPIRAL2
|
#325 |
TIED demo for GEC7
|
NIDHI
|
major
|
|
GPO
|
SPIRAL1
|
#335 |
GEC7 demo LEARN project
|
NIDHI
|
major
|
LEARN: S2.c Establish ORCA framework
|
GPO
|
SPIRAL2
|
#340 |
GEC7 Demo Request of UMLPEN
|
NIDHI
|
major
|
|
GPO
|
SPIRAL1
|
#341 |
GENICloud Demo Request for GEC7
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#344 |
Collaboration between GMOC and CMUlab
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#346 |
Collaboration between GMOC and ProtoGENI
|
hdempsey@bbn.com
|
major
|
GMOC: S1.b.d Complete initial implementation of Emergency Stop and notifications
|
GPO
|
SPIRAL1
|
#354 |
GEC7 Demo Request for OFGPO
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#358 |
Demo requirements for GpENI
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#369 |
siXis 10GE GEC7 Demonstration
|
NIDHI
|
major
|
|
GPO
|
SPIRAL1
|
#405 |
Porting VMI library to vServer-based cluster nodes.
|
jquan2@alaska.edu
|
major
|
|
GPO
|
SPIRAL2
|
#406 |
Demonstration of initial VMI library on cluster nodes at UA (Demo at GEC8)
|
jquan2@alaska.edu
|
major
|
|
GPO
|
SPIRAL2
|
#418 |
Milestone S2.i completion
|
Ivan Seskar
|
major
|
ORBIT: S2.i GMOC access to operating data
|
GPO
|
SPIRAL1
|
#428 |
CMU: GEC7 poster
|
hdempsey@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#430 |
Milestone completion for LEARN: S2-j Release of Measurement Handler Software
|
dgurkan@uh.edu
|
major
|
LEARN: S2.j Deliver release of Measurement Handler
|
GPO
|
SPIRAL2
|
#431 |
Need process for providing software to GENI software releases.
|
hdempsey@bbn.com
|
major
|
INSTOOLS: S2.b Contribute Instrumentation Tools project software
|
GPO
|
SPIRAL2
|
#436 |
please revert kell.gpolab vm to snapshot-1.
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#437 |
ERM Milestone S2c: Demo UMF in an experimental use-case
|
hmussman@bbn.com
|
major
|
ERM: S2.c Demo UMF in an experimental use-case
|
GPO
|
SPIRAL2
|
#438 |
Plan for GEC8 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#446 |
Processing Weather Radar Data on Amazon EC2
|
hdempsey@bbn.com
|
major
|
DICLOUD: S2.g Demo initial proxy aggregate manager
|
GPO
|
SPIRAL2
|
#460 |
GEC8 Demo Request: GENI Cloud Project
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#465 |
GENI-VIOLIN: Distributed Suspend and Resume for GENI Experiments
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#470 |
NetServ demo resource request for GEC8
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#471 |
Pathlet routing demo resource request for GEC8
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#479 |
milestone completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.n POC to GENI security team
|
GPO
|
SPIRAL2
|
#488 |
Milestone S2.i completed
|
blynn@cs.umass.edu
|
major
|
DOME: S2.i Plan for VLANs to endpoints
|
GPO
|
SPIRAL2
|
#495 |
S2.n POC to GENI response team
|
hmussman@bbn.com
|
minor
|
ViSE: S2.n POC to GENI response team
|
GPO
|
SPIRAL2
|
#496 |
S2.o POC to GENI Security Team
|
hmussman@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#501 |
milestone S2.f completion
|
hmussman@bbn.com
|
major
|
KANSEI: S2.f Connections from Kansei and NetEye to Internet2
|
GPO
|
SPIRAL2
|
#502 |
milestone S2.g completion
|
hmussman@bbn.com
|
major
|
KANSEI: S2.g Import extended ORCA v2.1
|
GPO
|
SPIRAL2
|
#507 |
Demo VLAN connections including other research communities
|
somebody
|
major
|
IGENI: S2.e Demo VLAN connections including other research communities
|
GPO
|
SPIRAL2
|
#508 |
Control of iGENI via ORCA to GENI users
|
somebody
|
major
|
IGENI: S2.f Control of iGENI via ORCA to GENI users
|
GPO
|
SPIRAL2
|
#509 |
Explore dynamic L1 connections
|
hmussman@bbn.com
|
major
|
IGENI: S2.j Explore dynamic L1 connections
|
GPO
|
SPIRAL2
|
#510 |
Completed design spec
|
somebody
|
major
|
TIED: S2.a Design specification for plugin
|
GPO
|
SPIRAL2
|
#511 |
Demo given
|
hdempsey@bbn.com
|
major
|
TIED: S2.b TIED GEC demo
|
GPO
|
SPIRAL2
|
#512 |
Software release completed (30 Jun 20910)
|
faber@isi.edu
|
major
|
TIED: S2.c Fedd release with ProtGeni plug-in
|
GPO
|
SPIRAL2
|
#513 |
Design Document released (13 Aug 2010)
|
hdempsey@bbn.com
|
major
|
TIED: S2.d Preliminary design document for Unified/SFA (GENIAPI) plugin
|
GPO
|
SPIRAL2
|
#518 |
Milestone review completed
|
hdempsey@bbn.com
|
major
|
TIED: S2.e review S2.f milestone and revise if necessary
|
GPO
|
SPIRAL2
|
#520 |
Specify and purchase 4 Juniper routers.
|
griff@netlab.uky.edu
|
major
|
Shadow: S2.a Purchase four Juniper M7i routers and install three of them at ProtoGENI sites on Internet 2
|
GPO
|
SPIRAL2
|
#521 |
Design GENI Aggregate Manager software components for Shadownet.
|
griff@netlab.uky.edu
|
major
|
Shadow: S2.b Develop standalone control software to virtualize the Juniper platform
|
GPO
|
SPIRAL2
|
#536 |
Milestone S2.f completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.f GMOC access to clearinghouse
|
GPO
|
SPIRAL2
|
#541 |
ERM S2.d milestone report
|
hmussman@bbn.com
|
major
|
ERM: S2.d Integrate UMF with BEN
|
GPO
|
SPIRAL2
|
#542 |
ERM S2.e milestone report
|
hmussman@bbn.com
|
major
|
ERM: S2.e Design and demo XML data exchange software modules
|
GPO
|
SPIRAL2
|
#544 |
Milestone ERM S2.f
|
hmussman@bbn.com
|
major
|
ERM: S2.f Plan to integrate UMF within anpther infrastructures
|
GPO
|
SPIRAL2
|
#552 |
milestone S2.d
|
hmussman@bbn.com
|
major
|
ERM: S2.d Integrate UMF with BEN
|
GPO
|
SPIRAL2
|
#553 |
Milestone S2.e
|
hmussman@bbn.com
|
major
|
ERM: S2.e Design and demo XML data exchange software modules
|
GPO
|
SPIRAL2
|
#554 |
milestone S2.f
|
hmussman@bbn.com
|
major
|
ERM: S2.f Plan to integrate UMF within anpther infrastructures
|
GPO
|
SPIRAL2
|
#560 |
Plan for GEC9 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#566 |
GEINIVIOLIN: In-Network Suspend and Resume for GENI Experiments
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#571 |
GENICloud GEC 9 Demo Request- Floor Demo
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#644 |
Redundancy Elimination on Network Elements
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#649 |
Multiflow TCP Demo Request.
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#661 |
VMI-FED: S2.g analysis doc
|
klnance@alaska.edu
|
major
|
VMI-FED: S2.g analysis doc
|
GPO
|
SPIRAL2
|
#666 |
Functional Demonstration
|
hdempsey@bbn.com
|
major
|
TIED: S2.f Demo TIED/GENIAPI Experiment
|
GPO
|
SPIRAL2
|
#667 |
ViSE/DiCloud Demo
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#670 |
Milestone 3 completed
|
Vic Thomas
|
major
|
Attrib: S2.c
|
GPO
|
SPIRAL2
|
#674 |
Stanford-Atlanta and BBN/GPO-Atlanta VLAN request
|
benninger@psc.edu
|
major
|
|
GPO
|
SPIRAL2
|
#680 |
Plan install and upgrade work in Atlanta
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#681 |
Plan intall work in Houston
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#684 |
Scheduled reboot of I2 of.atla OpenFlow core switch
|
jwilliams@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|