Opened 14 years ago

Closed 13 years ago

#560 closed (fixed)

Plan for GEC9 demos

Reported by: hdempsey@bbn.com Owned by: hdempsey@bbn.com
Priority: major Milestone:
Component: GPO Version: SPIRAL2
Keywords: GEC9 Cc:
Dependencies:

Description

Determine/coordinate demo needs and plan for supporting demos.

Attachments (1)

Guest_Shipping_Label (NSF GEC9) v1_10-06-10.doc (27.0 KB) - added by hdempsey@bbn.com 13 years ago.
Shipping label for GEC9 hotel delivery

Download all attachments as: .zip

Change History (6)

comment:1 Changed 14 years ago by hdempsey@bbn.com

Status: newassigned

comment:2 Changed 14 years ago by hdempsey@bbn.com

Template of info to include in your demo request ticket:

  1. Brief demo description (A few sentences suitable for a GEC9 attendee information page. See http://groups.geni.net/geni/wiki/GEC8DemoSummary for examples.)
  1. List of equipment that will need AC connections (e.g. laptop, switch hardware prototype, monitor). (Just put in the number of connections needed if your demo description already lists the equipment)
  1. Number of wired network connections (include required bandwidth if significant)
  1. Number of wireless network connections (include required bandwidth if significant)

only

  1. Projector (y/n) Monitor (y/n, specify VGA or DVI. Specify resolution only if your software has resolution restrictions) Bring your own projectors if feasible.
  1. Number of posters (poster boards are 20" x 30")
  1. Number of static addresses needed (if any)
  1. Description of any special requests (There will be no layer 2 I2 or NLR VLANS to the GEC9 demo floor--only production Internet service)

comment:3 Changed 14 years ago by hdempsey@bbn.com

Please create your demo request ticket using this link http://groups.geni.net/geni/newticket?keywords=GEC9 Copy the template from here into your ticket and fill in your answers.

comment:4 Changed 14 years ago by hdempsey@bbn.com

General floorplan from the hotel is available here:

http://www.omnihotels.com/FindAHotel/WashingtonDCShoreham/MeetingFacilities/SpecificationsAndFloorPlans.aspx

We'll provide a map with demo locations filled in as usual after we've collected all the requests and planned the layout.

Changed 13 years ago by hdempsey@bbn.com

Shipping label for GEC9 hotel delivery

comment:5 Changed 13 years ago by hdempsey@bbn.com

Resolution: fixed
Status: assignedclosed
Note: See TracTickets for help on using tickets.