#1000 |
Performance Analysis of DDoS Detection Methods on GENI
|
peter.stickney@bbn.com
|
major
|
|
EXPERIMENTS
|
SPIRAL5
|
#1088 |
Performance Analysis of VM Migration between Openflow enabled Datacenters
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1427 |
Physical Therapy As a Service
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#7 |
PlanetLab: component and clearinghouse release v0.1
|
Aaron Falk
|
major
|
PlanetLab: component and clearinghouse release v0.1
|
GPO
|
SPIRAL1
|
#238 |
PlanetLab Demo
|
NIDHI
|
major
|
|
PLANETLAB
|
SPIRAL2
|
#60 |
PlanetLab Demo for GEC4
|
llp@cs.princeton.edu
|
major
|
|
PLANETLAB
|
SPIRAL1
|
#131 |
PlanetLab/Geniwrapper Demo
|
hdempsey@geni.net
|
major
|
|
PLANETLAB
|
SPIRAL1
|
#689 |
Plan for GEC10 demos
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#786 |
Plan for GEC12 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#847 |
Plan for GEC13 demos
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#903 |
Plan for GEC 14 demos
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#942 |
Plan for GEC15 Demos
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#956 |
Plan for GEC15 Demos: OpenFlow at Clemson: Data Analysis Network
|
peter.stickney@bbn.com
|
major
|
|
OFCLEM
|
SPIRAL4
|
#982 |
Plan for GEC16 Demos: OpenFlow at Clemson: Data Analysis Network and IPv6
|
peter.stickney@bbn.com
|
major
|
|
OFCLEM
|
SPIRAL5
|
#36 |
Plan for GEC4 demonstrations.
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#122 |
Plan for GEC5 demonstrations
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#216 |
Plan for GEC6 demonstrations
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#220 |
Plan for GEC6 demos
|
NIDHI
|
major
|
|
GPO
|
SPIRAL2
|
#304 |
Plan for GEC7 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#438 |
Plan for GEC8 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#560 |
Plan for GEC9 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#680 |
Plan install and upgrade work in Atlanta
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#681 |
Plan intall work in Houston
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#1423 |
PlanIT Impact
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#66 |
Please add link(s) to this documentation or the documenttion itself to TIED wiki page.
|
jtw@ISI.EDU
|
major
|
TIED: S1.b Initial component and clearinghouse documentation.
|
TIED
|
SPIRAL1
|
#436 |
please revert kell.gpolab vm to snapshot-1.
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#804 |
Plenary demo: Advanced Programmable Networks (Northwestern / ICAIR)
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#803 |
Plenary demo: FlowScale (Indiana University)
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#805 |
Plenary demo: Improving WAN Performance with the eXtensible Session Protocol (Indiana, Delaware)
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#807 |
Plenary demo: Infinity: an energy-efficient data delivery infrastructure for mobile devices (University of Michigan)
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#809 |
Plenary demo: Mobility First
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#806 |
Plenary demo: Steroid OpenFlow Service (SOS) (Clemson)
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#837 |
Plenary demo: uCap
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#1402 |
Pollution Visualizer
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#405 |
Porting VMI library to vServer-based cluster nodes.
|
jquan2@alaska.edu
|
major
|
|
GPO
|
SPIRAL2
|
#31 |
Possible change to milestone date
|
Vic Thomas
|
major
|
MeasurementSys: S1.c Repository system design specification -
|
GPO
|
SPIRAL1
|
#32 |
Possible change to milestone date.
|
Vic Thomas
|
major
|
MeasurementSys: S1.a System interface design specification -
|
GPO
|
SPIRAL1
|
#944 |
Poster and Demo of OKGems Project
|
peter.stickney@bbn.com
|
major
|
OKGEMS: S4.e Demonstration at GEC14 and Experimenter Outreach
|
GPO
|
SPIRAL4
|
#715 |
Poster/Demo request ticket for "GENI Experiments on P2P, MANET, WSN and Federated Networks"
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#1235 |
Poster: Measurements of netmap-based Data Plane Acceleration on xDPd
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1236 |
Poster on Integrating Dell SDP on GENI: Considerations on the Aggregate
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#729 |
Poster on Sustainability of Open Source Software - Kansei
|
chaos@bbn.com
|
major
|
|
KANSEI
|
SPIRAL3
|
#831 |
Poster on vehicle multi homing
|
Josh Smift
|
major
|
|
WIMXUCLA
|
SPIRAL4
|
#1226 |
Poster presentation for "End-to-End Cloud Security"
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1393 |
Poster request: A High Level Rule-based Language for Openflow
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#888 |
Poster request for aalborg FIA project
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#1240 |
poster request for GEC'20
|
peter.stickney@bbn.com
|
minor
|
|
GPO
|
SPIRAL6
|
#779 |
Post GEC11 Status Report and Milestone
|
Vic Thomas
|
major
|
NETKARMA: S3.e GEC11 demonstration and outreach
|
GPO
|
SPIRAL3
|
#759 |
post operations ecosystem table
|
hdempsey@bbn.com
|
major
|
GMOC: S3.b Build an initial "Operations Eco-System" table
|
GMOC
|
SPIRAL3
|
#68 |
Post Opt-in requirements document
|
somebody
|
major
|
REGOPT: S1.a Produce opt-in requirements document
|
GPO
|
SPIRAL1
|
#79 |
Post updated draft of Measurement Document
|
pb@cs.wisc.edu
|
major
|
MeasurementSys: S1.b Measurement system design specification -
|
MeasurementSys
|
SPIRAL1
|
#170 |
Presented Opt-In requrements at GEC4 Opt-in Working Group meeting.
|
somebody
|
major
|
REGOPT: S1.a Produce opt-in requirements document
|
GPO
|
SPIRAL1
|
#1372 |
PrimoGENI and MyExperiment
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1319 |
PrimoGENI Constellation for Hybrid Network Experimentation
|
peter.stickney@bbn.com
|
major
|
ProtoGENI: S4.a Support GENI CF related initiatives
|
GPO
|
SPIRAL7
|
#322 |
PrimoGENI demo
|
NIDHI
|
major
|
ABAC: S2.c
|
PRIMOGENI
|
SPIRAL2
|
#914 |
PrimoGENI demo
|
agosain@bbn.com
|
major
|
|
PRIMOGENI
|
SPIRAL4
|
#448 |
PrimoGENI Demonstration: we will show our new IDE and platform that includes OpenVZ virtualization.
|
hdempsey@bbn.com
|
major
|
PrimoGENI: S2.e: Demonstration
|
PRIMOGENI
|
SPIRAL2
|
#366 |
Princeton initial switch purchases
|
scott@CS.Princeton.EDU
|
major
|
OFPR: S2.a2 Purchase equipment
|
OFPR
|
SPIRAL2
|
#446 |
Processing Weather Radar Data on Amazon EC2
|
hdempsey@bbn.com
|
major
|
DICLOUD: S2.g Demo initial proxy aggregate manager
|
GPO
|
SPIRAL2
|
#71 |
Produce first implementation of UKY Aggregate Manager
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.b Develop Reference implementation of Aggregate Manager (AM v1.0)
|
INSTOOLS
|
SPIRAL1
|
#67 |
Progress on software release milestone
|
somebody
|
major
|
TIED: S1.c Release v 0.1 of component manager and clearinghouse.
|
TIED
|
SPIRAL1
|
#940 |
Project 1868 has updated status reports, please update project page to show milestons have been met
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#1079 |
Project OpenBIDS is an efficient Network Intrusion Detection System (NIDS) using OpenFlow framework and Bloom Filter data structure.
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#80 |
Propose date for 2nd draft of measurement system design document
|
pb@cs.wisc.edu
|
major
|
MeasurementSys: S1.b Measurement system design specification -
|
MeasurementSys
|
SPIRAL1
|
#273 |
ProtoGENI Component/Aggregate Manager API V2 Document
|
ricci@cs.utah.edu
|
major
|
PGINTEGRN: S2.a API document
|
GPO
|
SPIRAL1
|
#124 |
ProtoGENI control plane integration status
|
pgunn@cs.cmu.edu
|
major
|
CMU Lab: integrate with ProtoGENI control plane
|
GPO
|
SPIRAL1
|
#816 |
ProtoGENI Demo at GEC12
|
Josh Smift
|
major
|
|
PROTOGENI
|
SPIRAL4
|
#50 |
ProtoGENI demo at GEC#4
|
ricci@cs.utah.edu
|
minor
|
|
PROTOGENI
|
SPIRAL1
|
#129 |
ProtoGENI demo at GEC#5
|
hdempsey@geni.net
|
minor
|
|
PROTOGENI
|
SPIRAL1
|
#233 |
ProtoGENI demo at GEC#6
|
NIDHI
|
major
|
|
PROTOGENI
|
SPIRAL1
|
#321 |
ProtoGENI Demo at GEC#7
|
NIDHI
|
major
|
PGTools: S2.d Demonstration
|
GPO
|
SPIRAL2
|
#704 |
ProtoGENI GEC10 Demo
|
chaos@bbn.com
|
major
|
|
PROTOGENI
|
SPIRAL3
|
#614 |
ProtoGENI GEC9 Demo
|
hdempsey@bbn.com
|
major
|
|
PROTOGENI
|
SPIRAL2
|
#984 |
ProtoGENI/InstaGENI demo at GEC16
|
peter.stickney@bbn.com
|
major
|
|
INSTAGENI
|
SPIRAL5
|
#272 |
ProtoGENI security POC identified
|
ricci@cs.utah.edu
|
major
|
ProtoGENI.S2.a: Security POC
|
GPO
|
SPIRAL1
|
#1151 |
ProtoRINA over ProtoGENI Poster
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1460 |
Prototype of a ChoiceNet Economy Plane for the Future Internet Architecture
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#143 |
Provide description of Enterprise GENI network at Stanford
|
appenz@cs.stanford.edu
|
major
|
ENTGENI: S1.a Deploy Phase 0 Enterprise GENI network at Stanford
|
GPO
|
SPIRAL1
|
#108 |
Provide information on prototype clearinghouse and where/how it will operate.
|
jtw@ISI.EDU
|
major
|
|
TIED
|
SPIRAL1
|
#26 |
Provide new completion date for report.
|
Stephen.Schwab@sparta.com
|
major
|
SECARCH: S1.a Draft Security Design Report
|
SECARCH
|
SPIRAL1
|
#179 |
Provide plan for making Aggregate Manager externally accessible in Phase 0 deployment
|
Srini Seetharaman
|
major
|
ENTGENI: S1.a Deploy Phase 0 Enterprise GENI network at Stanford
|
GPO
|
SPIRAL1
|
#214 |
Provide pointer to AM and tools software and information on how GENI community may request access UKY aggregate.
|
griff@netlab.uky.edu
|
major
|
INSTOOLS: S1.d Deploy AM and open UKY Edulab for GENI
|
GPO
|
SPIRAL1
|
#37 |
Provide source code for Xen operating system and its virtualization features for mobile nodes (bricks).
|
hmussman@bbn.com
|
major
|
DOME: 1b Implement, integrate and document the Xen operating system and its virtualization features
|
DOME
|
SPIRAL1
|
#276 |
Providing CM for VLAN creation on backbone switches to other projects
|
Leigh Stoller
|
major
|
ProtoGENI.S2.e: ProtoGENI backbone resources available to other clusters
|
GPO
|
SPIRAL1
|
#526 |
Publish and review agenda
|
somebody
|
major
|
Quilt: S2.c Complete Workshop Program
|
QUILT
|
SPIRAL2
|
#111 |
Publish version of Common Operational Dataset that incorporates feedback from control framework projects
|
somebody
|
major
|
GMOC:Define Common Operational Dataset
|
GMOC
|
SPIRAL1
|
#73 |
Purchase virtualization servers and complete end-to-end VLAN connections with backbone
|
Peter O'Neil
|
major
|
MAX: Purchase virtualization servers and connections
|
MAX
|
SPIRAL1
|
#1217 |
QoS SDN (Colocate with GENI Cinema)
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#482 |
QSR for LEARN
|
hmussman@bbn.com
|
major
|
|
LEARN
|
SPIRAL2
|
#332 |
Raven demo
|
NIDHI
|
major
|
|
RAVEN
|
SPIRAL1
|
#42 |
Raven demo at GEC4
|
hdempsey@bbn.com
|
major
|
|
RAVEN
|
SPIRAL1
|
#156 |
Raven GEC5 demo requirements
|
hdempsey@bbn.com
|
major
|
|
RAVEN
|
SPIRAL1
|
#225 |
Raven GEC6 demo
|
NIDHI
|
major
|
|
RAVEN
|
SPIRAL1
|
#577 |
Raven GEC9 demo
|
hdempsey@bbn.com
|
major
|
|
RAVEN
|
SPIRAL2
|
#644 |
Redundancy Elimination on Network Elements
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#1237 |
Reliable Communications Protocol for Advanced Manufacturing
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#747 |
Reminder: already submitted on 6 Jan
|
hdempsey@bbn.com
|
major
|
TIED: S3.a "API modifications design document, patches or modified GENI API reference code"
|
GPO
|
SPIRAL3
|
#1078 |
Remote Training of Surgeons using Virtual Reality
|
peter.stickney@bbn.com
|
major
|
|
GENICLOUD
|
SPIRAL5
|
#1159 |
Renewing stitched sliver with ION in path may result in OSCARS path modificaiton failure
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL6
|
#29 |
Request feedback on strawman operational dataset from ORBIT control framework group
|
hmussman@bbn.com
|
blocker
|
GMOC:Define Common Operational Dataset
|
GMOC
|
SPIRAL1
|