{6} All Tickets By Milestone (Including closed) (1502 matches)

A more complex example to show how to make advanced reports.

Results (901 - 1000 of 1502)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

(empty) (26 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1139 OESS notifications should include id user for provisioned and decommissioned operations STITCHING new SPIRAL6 defect major luke@grnoc.iu.edu 06/26/14
#1272 Advertisement Rspec does not pass rspeclint due to routable_addresses error PROTOGENI new SPIRAL6 major somebody 06/26/14
#1259 SCS should detect bad Ads and skip them MAXSCS new SPIRAL6 major xyang@maxgigapop.net 06/05/14
#1258 Limit reservations to slice expiration I2AM new SPIRAL6 major xyang@maxgigapop.net 06/05/14
#1207 Repeated AddPersonToSite errors I2AM new SPIRAL6 defect major xyang@maxgigapop.net 05/21/14
#1200 Preserve schemas in Manifest I2AM new SPIRAL6 task major xyang@maxgigapop.net 03/05/14
#1197 MAX and ION aggregates report Internal API error for out-of-sync credentials sometimes STITCHING new SPIRAL6 defect major xyang@maxgigapop.net 02/11/14
#1163 SCS exception for lines topology STITCHING new SPIRAL6 defect major xyang@maxgigapop.net 01/31/14
#1157 dragon.maxgigapop.net stitching aggregate url has myplc aggregate_url STITCHING new SPIRAL6 enhancement major xyang@maxgigapop.net 12/03/13
#1101 stitching raw-pc at PG or IG requires capacity to be defined unlike xen and openvz, which do not STITCHING new SPIRAL5 defect major duerig@flux.utah.edu 09/06/13
#1044 Duplicate IP addresses configured in Utah PG to InstaGENI Utah sliver with multiple links STITCHING new SPIRAL5 defect major duerig@flux.utah.edu 08/01/13
#1039 Stitching slivers with Utah InstaGENI end point requires that capacity must be specified for link STITCHING new SPIRAL5 defect major duerig@flux.utah.edu 08/01/13
#1012 Expand the SCS wiki with basic design details MAXSCS new SPIRAL5 task major tlehman@maxgigapop.net 06/25/13
#1048 Requesting link below minimumReservableCapacity does not generate error and allocates default STITCHING new SPIRAL5 defect major duerig@flux.utah.edu 06/10/13
#1024 Support AM API v3 and negotiation MAXSCS new SPIRAL5 enhancement major tlehman@maxgigapop.net 05/01/13
#1023 Add a call to query the SCS for interconnected AMs MAXSCS new SPIRAL5 enhancement major tlehman@maxgigapop.net 05/01/13
#1022 Support openflow controlled VLANs MAXSCS new SPIRAL5 enhancement major tlehman@maxgigapop.net 05/01/13
#845 improve the GMOC SNAPP, Portal, and protected UI interfaces to meet current experimenter needs GMOC new SPIRAL4 task major mrmccrac@grnoc.iu.edu 03/20/12
#673 Move SPP node in Washington D.C. from current rack to new rack SPP new SPIRAL2 task major matt@internet2.edu 10/20/10
#519 Milestone 1 completed ATTRIB new SPIRAL2 task major Vic Thomas 10/05/10
#490 LEARN S2.k Recommendations for Measurement Handlers on GENI LEARN new SPIRAL2 task major hmussman@bbn.com 07/19/10
#427 milestone S2.d completion CRON new SPIRAL2 task major pkondi1@lsu.edu 04/21/10
#426 milestone S2.c completion CRON new SPIRAL2 task major pkondi1@lsu.edu 04/21/10
#425 Milestone S2.b completion CRON new SPIRAL2 task major pkondi1@lsu.edu 04/21/10
#1405 SCS is ignoring link type egre STITCHING reopened SPIRAL7 critical xyang@maxgigapop.net 12/10/15
#1278 AL2S OESS getversion does not return geni_am_type, geni_am_urn, and supported extensions STITCHING reopened SPIRAL6 major luke@grnoc.iu.edu 06/03/15

ABAC: S2.c (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#322 PrimoGENI demo PRIMOGENI closed fixed SPIRAL2 task major NIDHI 03/24/10

Attrib: S2.c (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#670 Milestone 3 completed GPO closed fixed SPIRAL2 task major Vic Thomas 10/19/10

BGPMux: BGP Mux 0.1 sw release (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#22 User README is missing needed context BGPMUX closed fixed SPIRAL1 task minor feamster@cc.gatech.edu 01/16/09
#8 need README, LICENSE files BGPMUX closed fixed SPIRAL1 task major feamster@cc.gatech.edu 01/16/09
#21 DTUNNEL repository is not publicly readable BGPMUX closed fixed SPIRAL1 task major feamster@cc.gatech.edu 01/16/09

BGPMux: Define RSpec - (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#181 Define ProtoGENI RSpec for BGP Mux and tunnels BGPMUX closed fixed SPIRAL1 task major feamster@cc.gatech.edu 09/16/09
#74 Extend ProtoGENI clearinghouse to support topology creation BGPMUX closed fixed SPIRAL1 task major feamster@cc.gatech.edu 08/12/09
#180 Milestone revision for clarity, due date change BGPMUX closed fixed SPIRAL1 task major Aaron Falk 08/12/09

BGPMux: Integrate with ProtoGENI - (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#75 Implement component manager that supports the ProtoGENI API BGPMUX closed fixed SPIRAL1 task major feamster@cc.gatech.edu 11/20/09
#182 Milestone revision for clarity, due date change BGPMUX closed fixed SPIRAL1 task major Aaron Falk 08/12/09

BGPMux: Make BGP mux and tunnel software available - (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#201 Extend BGP-Mux software release to include ProtoGENI compatible Aggregate Manager GPO closed fixed SPIRAL1 task major feamster@cc.gatech.edu 06/18/12
#183 Milestone date change BGPMUX closed fixed SPIRAL1 task major Aaron Falk 08/12/09

BGPMux: S2.c BGP-Mux ops transition - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#275 Due date change for milestone BGP-Mux: S2.c ops transition BGPMUX closed fixed SPIRAL1 task major somebody 12/09/09

BGPMux: S2.f Security review 2 (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#440 BGP-Mux BGPMUX closed fixed SPIRAL2 task major hdempsey@bbn.com 07/30/10
#434 Confirm Sparta has all inputs needed from BGP-MUX for Spriral 2 security review. SECARCH closed fixed SPIRAL2 task major Stephen.Schwab@cobham.com 05/13/10

BGPMux: Virtual Network with BGPMux How-To -- (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#184 initial how-to draft available BGPMUX closed fixed SPIRAL1 task major Aaron Falk 09/10/09
#115 Develop alternate spiral-1 outreach milestone GPO closed fixed SPIRAL1 task major Aaron Falk 06/09/09

CENICREGIONAL: S4.b Deploy switches and bring up test connections (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#901 CENICREGIONAL: S4.b Deploy switches and bring up test connections CENICREGIONAL closed fixed SPIRAL4 task major erick@cenic.org 09/10/14

CMU Lab: bare bones node configuration (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1 CMU Lab: bare bones node configuration complete CMULAB closed fixed SPIRAL1 task major somebody 12/03/08

CMU Lab: Deploy and commence operations of 5 residential HomeNet nodes (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#62 Complete bringing 5 HomeNet nodes up GPO closed fixed SPIRAL1 task major dga@cs.cmu.edu 04/23/09

CMU Lab: deploy and operate 2 HomeNet nodes in CMU lab (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#25 make initial two nodes 'operational' GPO closed fixed SPIRAL1 task major dga@cs.cmu.edu 02/03/09

CMU Lab: desired node config & boot mgmt functionality (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#123 Close "Milestone CMU Lab: desired node config & boot mgmt functionality" ticket GPO closed fixed SPIRAL1 task minor hdempsey@bbn.com 07/09/09
#58 Need additional configuration documentation GPO closed fixed SPIRAL1 task major dga@cs.cmu.edu 04/24/09
#81 Update CMU Milestone #1 GPO closed invalid SPIRAL1 task major hdempsey@bbn.com 04/22/09

CMU Lab: emulator nodes integrated (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#4 CMU Lab: integrate emulator nodes CMULAB closed fixed SPIRAL1 task major somebody 12/03/08

CMU Lab: Emulator user interface integration (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#86 Status update for task 6: Emulator user interface integration CMULAB closed wontfix SPIRAL1 task major pgunn@cs.cmu.edu 10/06/09

CMU Lab: Formulate initial RSpecs for wireless nodes (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#24 need to make draft RSpec proposals public CMULAB closed fixed SPIRAL1 task major duerig@cs.utah.edu 03/10/09

CMU Lab: Get CMU ProtoGENI node on I2 VLAN (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#78 Temporary tunnels in use for CMU lab GPO closed invalid SPIRAL1 task major hdempsey@bbn.com 04/21/09

CMU Lab: Integrated experimentation between CMU testbeds (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#215 Document integrated experimentation GPO closed fixed SPIRAL1 task major somebody 10/06/09

CMU Lab: integrate with ProtoGENI control plane (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#124 ProtoGENI control plane integration status GPO closed fixed SPIRAL1 task major pgunn@cs.cmu.edu 08/12/09
#174 confirm CMUlab control plane integration GPO closed fixed SPIRAL1 task major dga@cs.cmu.edu 08/12/09

CMU Lab: integration of node-CMU and CMU-Utah tunnels (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#127 Dataplane tunnelling 4c GPO closed fixed SPIRAL1 task major pgunn@cs.cmu.edu 08/12/09
#126 Dataplane tunnelling 4b GPO closed fixed SPIRAL1 task major somebody 07/09/09
#125 Dataplane tunnelling 4a GPO closed fixed SPIRAL1 task major somebody 07/09/09

CMU Lab: IP-in-IP encap from CMU-Control to Homenet nodes (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#82 Update CMU Milestone #1 GPO closed fixed SPIRAL1 task major hdempsey@bbn.com 04/24/09
#84 Duplicate task? GPO closed invalid SPIRAL1 task major hdempsey@bbn.com 04/22/09

CMU Lab: Merge patches into ProtoGENI distribution (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#34 Initial CMULab code merged with ProtoGENI CMULAB closed fixed SPIRAL1 task major dga@cs.cmu.edu 08/12/09

CMU Lab:S2.b Define RSpecs for wireless channels (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#765 Defined Wireless XML communication GPO closed fixed SPIRAL2 task major Vic Thomas 05/24/12

CMU Lab: student testbed use (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#128 Ticket for Miletone: student testbed use GPO closed fixed SPIRAL1 task major prs@cs.cmu.edu 10/06/09
#204 need documentation of milestone completion GPO closed fixed SPIRAL1 task major prs@cs.cmu.edu 10/06/09

CMU Lab: Tunneling packets from Utah to CMU (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#3 Bring up OpenVPN tunnels between CMU Lab and ProtoGENI CMULAB closed fixed SPIRAL1 task major dga@cs.cmu.edu 04/24/09
#83 Status of ticket GPO closed invalid SPIRAL1 task major hdempsey@bbn.com 04/22/09

COGRADIO: S2.a Roadmap for stand-alone and infrastructure-class platforms (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#423 Milestone S2.a completion COGRADIO closed fixed SPIRAL1 task major grunwald@cs.colorado.edu 04/15/10

COGRADIO: S2.b Phase 1 radio card for stand-alone system (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#424 Milestone S2.b completion COGRADIO closed fixed SPIRAL2 task major grunwald@cs.colorado.edu 04/15/10

COGRADIO: S2.c Integrate stand-alone platform (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#532 Milestone S2.c completion COGRADIO closed fixed SPIRAL2 task major Ivan Seskar 08/31/10

COGRADIO: S2.d Initial integration stand-alone system and with OMF (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#474 COGRADIO demo at GEC8 COGRADIO closed fixed SPIRAL2 task major hdempsey@bbn.com 08/31/10

COGRADIO: S2.e Stand-alone system available to GENI users (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#737 GEC 10 demo request - Cognitive Radio COGRADIO closed fixed SPIRAL3 task major chaos@bbn.com 09/26/11
#533 Milestone S2.e completion COGRADIO new SPIRAL2 task major Ivan Seskar 08/31/10

COGRADIO: S2.f Release design information for stand-alone system kit (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#534 Milestone S2.f completion COGRADIO new SPIRAL2 task major Ivan Seskar 08/31/10

COGRADIO: S2.g Contribution to GENI outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#535 Milestone S2.g completion COGRADIO new SPIRAL2 task major Ivan Seskar 08/31/10

DICLOUD: S2.a Cluster plan for VLANs between testbeds (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#266 Milestone S2.a completion DICLOUD closed fixed SPIRAL2 task major hmussman@bbn.com 12/02/09

DICLOUD: S2.b Plan to connect to cloud (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#285 Milestone S2.b completion DICLOUD closed fixed SPIRAL1 task major cecchet@cs.umass.edu 12/28/09
#284 Milestone S2.b completion DICLOUD closed fixed SPIRAL1 task major cecchet@cs.umass.edu 12/28/09

DICLOUD: S2.c Handlers to allocate cloud (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#360 milestone completion DICLOUD closed fixed SPIRAL1 task major cecchet@cs.umass.edu 03/03/10
#359 milestone completion DICLOUD closed fixed SPIRAL1 task major cecchet@cs.umass.edu 03/03/10

DICLOUD: S2.d Policy to track usage (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#316 Milestone S2.d completion DICLOUD closed fixed SPIRAL1 task major cecchet@cs.umass.edu 03/03/10

DICLOUD: S2.e Demo archiving sensor data (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#377 Milestone DICLOUD: S2.e Demo archiving sensor data DICLOUD closed fixed SPIRAL2 task minor David Irwin 03/31/10
#386 S2.e completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 03/31/10
#328 DiCloud GEC7 Demo DICLOUD closed fixed SPIRAL2 task minor NIDHI 03/24/10

DICLOUD: S2.f Use CloudWatch to monitor usage (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#435 Milestone S2.f completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 05/14/10

DICLOUD: S2.g Demo initial proxy aggregate manager (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#446 Processing Weather Radar Data on Amazon EC2 GPO closed fixed SPIRAL2 task major hdempsey@bbn.com 07/26/10
#491 Milestone S2.g completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 07/26/10

DICLOUD: S2.h Release initial proxy aggregate manager (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#503 Milestone S2.h completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 08/13/10

DICLOUD: S2.i Extend ViSE web portal to include cloud (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#556 Milestone S2.i completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 09/15/10

DICLOUD: S2.j Make available initial set of resources (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#653 Milestone S2.j completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 09/30/10

DICLOUD: S2.k POC to GENI response team (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#557 Milestone S2.k completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 09/15/10

DICLOUD: S2.l POC to GENI security team (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#558 Milestone S2.l completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 09/15/10

DICLOUD: S2.m Contribution to GENI outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#394 Milestone S2.m completion DICLOUD closed fixed SPIRAL2 task major cecchet@cs.umass.edu 04/07/10

DICLOUD: S3.a Demonstration at GEC9 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#710 Milestone S3.a completion DICLOUD closed fixed SPIRAL3 task major cecchet@cs.umass.edu 02/09/11

DICLOUD: S3.b Documentation and Code Release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#711 Milestone S3.b completion DICLOUD closed fixed SPIRAL3 task major cecchet@cs.umass.edu 02/09/11

DICLOUD: S3.c Intermediate (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#712 Milestone S3.c completion DICLOUD closed fixed SPIRAL3 task major David Irwin 02/09/11

DICLOUD: S3.d Demonstration at GEC10 and Experimenter Outreach (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#743 DiCloud GEC10 Demo DICLOUD closed fixed SPIRAL3 task major chaos@bbn.com 04/15/11
#755 Milestone S3.d completion DICLOUD closed fixed SPIRAL3 task major cecchet@cs.umass.edu 03/16/11

DICLOUD: S3.e Documentation and Code Release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#840 Milestone S3.e completion DICLOUD closed fixed SPIRAL3 task major cecchet@cs.unass.edu 10/18/11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Note: See TracReports for help on using and creating reports.