{6} All Tickets By Milestone (Including closed) (1502 matches)
A more complex example to show how to make advanced reports.
Results (601 - 700 of 1502)
(empty) (100 matches)
Ticket | Summary | Component | Status | Resolution | Version | Type | Priority | Owner | Modified |
---|---|---|---|---|---|---|---|---|---|
#1242 | Virtual Computer Networking Lab | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1228 | FIRE-GENI SDX 1.0 and performance on stitched links | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1229 | GEC20 Demo Request: GENI Science Shakedown | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1230 | GENI for the masses: demo of GENI MOOC project | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1231 | Simulation, Detection, and Denial of Ping Attack | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1233 | End-to-end flow manipulations using a network debugging tool | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1235 | Poster: Measurements of netmap-based Data Plane Acceleration on xDPd | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1236 | Poster on Integrating Dell SDP on GENI: Considerations on the Aggregate | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1222 | VNode and FLARE | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1232 | Measurements of Forwarding Performance of the LINCx Software Switch | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1238 | Network Resiliance with OpenFlow | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1239 | OpenBIDS - Using Bloom Filter and Aho-corasick algorithm compared with SNORT | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1243 | GENI/FIRE Federation Demo | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1244 | Jacks demo at GEC20 | PROTOGENI | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1245 | Demonstration of Course Modules for Teaching Networking Concepts, and the Tmix Traffic Generation System. (UNC - Chapel Hill) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1252 | ARCCN Network Prototype Simulator | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1253 | ARCCN VERifying MONiTor for SDN (VERMONT) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1254 | ARCCN Demorpheus: Shellcode Detection in High-Speed Network Channels | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1256 | ARCCN Simplifying and automating enterprise networks administration with SDN/OpenFlow. | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1257 | ARCCN NFV Platform | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1218 | InstaGENI poster and demo at GEC 20 | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1226 | Poster presentation for "End-to-End Cloud Security" | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1234 | Intelligent Data Movement System (IDMS) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1260 | ExoGENI Demo | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1237 | Reliable Communications Protocol for Advanced Manufacturing | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1261 | SciWiNet demo | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1267 | GENI Cinema (colocate with QoS SDN #1217) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1217 | QoS SDN (Colocate with GENI Cinema) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1255 | ARCCN Chandelle: Universal Wireless Controller | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1248 | request for GENI-VIRO demo at GEC20 | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1249 | Application Aware Big Data | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1214 | SDX on GENI | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1264 | Internet2 Integration with GENI | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1271 | Virtualized services via SDN | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1136 | Links are listed twice in OESS Advertisement Rspecs | STITCHING | closed | fixed | SPIRAL6 | defect | major | luke@grnoc.iu.edu | 06/26/14 |
#1137 | OESS request Rspecs do not pass rspeclint due to schema location mismatch and schema syntax | STITCHING | closed | fixed | SPIRAL6 | defect | major | luke@grnoc.iu.edu | 06/26/14 |
#1209 | Mismatch in getversion code_tag and for ION and MAX aggregates | STITCHING | closed | fixed | SPIRAL6 | major | ckotil@grnoc.iu.edu | 06/26/14 | |
#1227 | On-Demand Emergency Streaming CANCELLED | GPO | closed | wontfix | SPIRAL6 | major | peter.stickney@bbn.com | 06/21/14 | |
#1269 | Sign CSR for GENI ION AM Ops-Monitoring at ION AM/GMOC | GPO | closed | fixed | SPIRAL6 | minor | tmitchel@bbn.com | 06/17/14 | |
#1268 | Move University of Illinois at Urbana-Champaign (UIUC) InstaGENI rack to production status | GPO | closed | fixed | SPIRAL6 | major | hdempsey@bbn.com | 06/17/14 | |
#1265 | University of Kentucky Operations Monitoring | GPO | closed | wontfix | SPIRAL6 | major | hdempsey@bbn.com | 06/17/14 | |
#1155 | Move University of Wisconsin-Madison rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 06/16/14 |
#1147 | Move NYU GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 06/11/14 |
#1240 | poster request for GEC'20 | GPO | closed | fixed | SPIRAL6 | minor | peter.stickney@bbn.com | 06/06/14 | |
#1145 | Move University of Missouri-Columbia GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/28/14 |
#1143 | Move MAX GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/28/14 |
#1251 | pyOpenSSL requirement? | GPO | closed | invalid | SPIRAL6 | major | somebody | 05/21/14 | |
#1250 | Sign CSR for ExoGENI generic collector cert | GPO | closed | fixed | SPIRAL6 | blocker | tmitchel@bbn.com | 05/21/14 | |
#1247 | request for GENI-VIRO demo at GEC20 | GPO | closed | duplicate | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1246 | request for GENI-VIRO demo at GEC20 | GPO | closed | invalid | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1219 | Sign CSR for vmcount at gpo | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/08/14 | |
#1216 | Sign CSR for genicollector at uky | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/07/14 | |
#1144 | Move Clemson InstatGENI GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/06/14 |
#1213 | Sign CSR for collector at max_ops_mon_localstore | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/05/14 | |
#1212 | Sign CSR for TOOL collector for INSTANCE jfed-iminds | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/01/14 | |
#1152 | Tennesee State University poster | GPO | closed | wontfix | SPIRAL6 | task | major | peter.stickney@bbn.com | 05/01/14 |
#1210 | Sign CSR for collector at gpo | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 04/28/14 | |
#1211 | InstaGENI OpenFlow stops working over stitched link | GPO | closed | fixed | SPIRAL6 | major | somebody | 04/25/14 | |
#1181 | Virtual Topology Service (VTS) demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1161 | Demo on Geni-enabled vehicular sensing and control networking | WIMXWAYNE | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1198 | GENI Experiment Engine (GEE) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1204 | SoNIC Software defined Precise Measurement in GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1178 | GENI Cinema | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1206 | Applied Research Center for Computer Networks (ARCCN) Recent Projects | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1187 | Location-Based Networking | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1171 | Software Defined Internet Exchange (SDX) at Georgia Tech and Magic Window | SOXREGIONAL | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1193 | MOXI Slice Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1182 | Internet2 Openflow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1160 | Mobile Video Streaming | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1203 | Multi-Domain OpenFlow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1177 | Server Redundancy Using OpenFlow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1184 | Tapestry GEC19 - Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1175 | VNODE and FLARE | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1168 | SDX-iGENI: Software Define Network Exchange for international GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1191 | Clemson Vertical Handover | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1196 | ExoGENI demos | EXOGENI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1194 | Request for GIMI demo at GEC | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1192 | GENI MOOC courseware demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1190 | GEC 19 Federation tools, authorities, and APIs | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1189 | Demonstration of Course Modules for Teaching Networking Concepts (UNC - Chapel Hill) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1188 | Network characterization of Hadoop using GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1186 | Virtualized services via OpenFlow based end-to-end networking | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1185 | Optimize a protocol pattern matching mechanism on the LINC switch | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1183 | Simulation, Detection, and Denial of ping attack | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1180 | Submission for GEC19 by University of Kentucky for demo on monitoring prototype | MeasurementSys | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1179 | Content Retrieval in MobilityFirst FIA | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1174 | Dell Split Data Plane on ExoGENI as Network Experiment Resource | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1173 | Fast packet processing performance improvement with NETMAP | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1172 | The GENI Desktop | GEMINI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1170 | GEC19 demo submission (ProtoRINA over GENI) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1169 | IDMS demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1167 | WiMAX Connectivity and Monitoring Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1166 | GEC19 Jacks Demo | PROTOGENI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1164 | Demo request SDN-Video-Orchestrator | SOXREGIONAL | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1176 | GEC 19 Cisco ExoGENI racks demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/09/14 |
#1165 | Move Cornell University InstaGENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 02/18/14 |
#1159 | Renewing stitched sliver with ION in path may result in OSCARS path modificaiton failure | STITCHING | closed | fixed | SPIRAL6 | defect | major | xyang@maxgigapop.net | 02/12/14 |
#1195 | Delete of sliver whose circuit on longer exists in MAX causes subsequent circuits to not complete | STITCHING | closed | fixed | SPIRAL6 | defect | major | xyang@maxgigapop.net | 02/11/14 |
#1158 | test ticket | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 01/24/14 |
#1154 | Missing Site VLAN Delegation information | STITCHING | closed | fixed | SPIRAL6 | defect | major | asydney@bbn.com | 11/22/13 |
Note:
See TracReports for help on using and creating reports.