#457 |
OnTimeMeasure GEC8 Demo Request
|
hdempsey@bbn.com
|
major
|
OnTime: S2.e: OnTimeMeasure-GENI available to early experimenters
|
ONTIME
|
SPIRAL2
|
#610 |
OFUWI: S2.d Begin integration testing with Stanford and BBN
|
akella@cs.wisc.edu
|
major
|
OFUWI: S2.d Begin integration testing with Stanford and BBN
|
OFUWI
|
SPIRAL2
|
#605 |
OFUWA: S2.d Begin integration testing with Stanford and BBN
|
arvind@cs.washington.edu
|
major
|
OFUWA: S2.d Begin integration testing with Stanford and BBN
|
OFUWA
|
SPIRAL2
|
#601 |
OFRG: S2.d Begin integration testing with Stanford and BBN
|
Ivan Seskar
|
major
|
OFRG: S2.d Begin integration testing with Stanford and BBN
|
OFRG
|
SPIRAL2
|
#597 |
OFPR: S2.d Begin integration testing with Stanford and BBN
|
scott@cs.princeton.edu
|
major
|
OFPR: S2.d Begin integration testing with Stanford and BBN
|
OFPR
|
SPIRAL2
|
#593 |
OFIU: S2.d Begin integration testing with Stanford and BBN
|
chsmall@indiana.edu
|
major
|
OFIU: S2.d Begin integration testing with Stanford and BBN
|
OFIU
|
SPIRAL2
|
#590 |
OFGT: S2.d Begin integration testing with Stanford and BBN
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.d Begin integration testing with Stanford and BBN
|
OFGT
|
SPIRAL2
|
#586 |
OFCLEM: S2.d Begin integration testing with Stanford and BBN
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.d Begin integration testing with Stanford and BBN
|
OFCLEM
|
SPIRAL2
|
#277 |
SNMP counters on ProtoGENI switches to other projects
|
ricci@cs.utah.edu
|
major
|
ProtoGENI.S2.f: Improved interfaces
|
GPO
|
SPIRAL1
|
#479 |
milestone completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.n POC to GENI security team
|
GPO
|
SPIRAL2
|
#478 |
milestone completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.m POC to GENI response team
|
ORCABEN
|
SPIRAL2
|
#431 |
Need process for providing software to GENI software releases.
|
hdempsey@bbn.com
|
major
|
INSTOOLS: S2.b Contribute Instrumentation Tools project software
|
GPO
|
SPIRAL2
|
#435 |
Milestone S2.f completion
|
cecchet@cs.umass.edu
|
major
|
DICLOUD: S2.f Use CloudWatch to monitor usage
|
DICLOUD
|
SPIRAL2
|
#434 |
Confirm Sparta has all inputs needed from BGP-MUX for Spriral 2 security review.
|
Stephen.Schwab@cobham.com
|
major
|
BGPMux: S2.f Security review 2
|
SECARCH
|
SPIRAL2
|
#440 |
BGP-Mux
|
hdempsey@bbn.com
|
major
|
BGPMux: S2.f Security review 2
|
BGPMUX
|
SPIRAL2
|
#333 |
Digital Object Registry GEC7 Demonstration
|
NIDHI
|
major
|
DIGOBREG: S2.c Complete Clearinghouse impl. & federate w/ ProtoGENI
|
DIGOBREG
|
SPIRAL2
|
#430 |
Milestone completion for LEARN: S2-j Release of Measurement Handler Software
|
dgurkan@uh.edu
|
major
|
LEARN: S2.j Deliver release of Measurement Handler
|
GPO
|
SPIRAL2
|
#615 |
OFNOX: S2.e Support campus installations of GENI software with AM API
|
Josh Smift
|
major
|
OFNOX: S2.e Support campus installations of GENI software with AM API
|
OFNOX
|
SPIRAL2
|
#275 |
Due date change for milestone BGP-Mux: S2.c ops transition
|
somebody
|
major
|
BGPMux: S2.c BGP-Mux ops transition -
|
BGPMUX
|
SPIRAL1
|
#335 |
GEC7 demo LEARN project
|
NIDHI
|
major
|
LEARN: S2.c Establish ORCA framework
|
GPO
|
SPIRAL2
|
#429 |
Milestone completion for LEARN: S2-c Establish ORCA control framework
|
dgurkan@uh.edu
|
major
|
LEARN: S2.c Establish ORCA framework
|
LEARN
|
SPIRAL2
|
#387 |
OFRG: S2.a2 Purchase equipment
|
Ivan Seskar
|
major
|
OFRG: S2.a2 Purchase equipment
|
OFRG
|
SPIRAL2
|
#391 |
OFUWI: S2.a2 Purchase equipment
|
akella@cs.wisc.edu
|
major
|
OFUWI: S2.a2 Purchase equipment
|
OFUWI
|
SPIRAL2
|
#526 |
Publish and review agenda
|
somebody
|
major
|
Quilt: S2.c Complete Workshop Program
|
QUILT
|
SPIRAL2
|
#403 |
OFNLR: S2.a Complete initial deployment plan
|
benninger@psc.edu
|
major
|
OFNLR: S2.a Complete initial deployment plan
|
OFNLR
|
SPIRAL2
|
#396 |
Milestone DOME: S2.d completion
|
somebody
|
major
|
DOME: S2.d Import extended ORCA v2.1
|
DOME
|
SPIRAL1
|
#296 |
MIlestone S2.g completion
|
hmussman@bbn.com
|
major
|
DOME: S2.g Include 900MHz radios
|
DOME
|
SPIRAL1
|
#397 |
Milestone DOME: S2.g completion
|
somebody
|
major
|
DOME: S2.g Include 900MHz radios
|
DOME
|
SPIRAL1
|
#395 |
Milestone DOME: S2.e completion
|
somebody
|
major
|
DOME: S2.e Improve virtualization and experiment control
|
DOME
|
SPIRAL1
|
#352 |
Mid-Atlantic Crossroads (MAX) Demo at GEC#7
|
NIDHI
|
major
|
MAX: S2.h DRAGON Aggregate Manager Enhancement Initial Implementation
|
MAX
|
SPIRAL2
|
#388 |
OFRG: S2.b Campus small deployments
|
Ivan Seskar
|
major
|
OFRG: S2.b Campus small deployments
|
OFRG
|
SPIRAL2
|
#382 |
OFIU: S2.b Campus small deployments
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.b Campus small deployments
|
OFIU
|
SPIRAL2
|
#314 |
ETRI Virtualized Programmable Plaftorm Demo (GEC7)
|
NIDHI
|
major
|
KGENI: S2.b Network Selected
|
KGENI
|
SPIRAL2
|
#392 |
OFUWI: S2.b Campus small deployments
|
akella@cs.wisc.edu
|
major
|
OFUWI: S2.b Campus small deployments
|
OFUWI
|
SPIRAL2
|
#390 |
OFWA: S2.b Campus small deployments
|
arvind@cs.washington.edu
|
major
|
OFUWA: S2.b Campus small deployments
|
OFUWA
|
SPIRAL2
|
#389 |
OFUWA: S2.a2 Purchase equipment
|
arvind@cs.washington.edu
|
major
|
OFUWA: S2.a2 Purchase equipment
|
OFUWA
|
SPIRAL2
|
#385 |
OFPR: S2.b Campus small deployments
|
scott@cs.princeton.edu
|
major
|
OFPR: S2.b Campus small deployments
|
OFPR
|
SPIRAL2
|
#366 |
Princeton initial switch purchases
|
scott@CS.Princeton.EDU
|
major
|
OFPR: S2.a2 Purchase equipment
|
OFPR
|
SPIRAL2
|
#384 |
OFPR: S2.a2 Purchase equipment
|
mfreed@cs.princeton.edu
|
major
|
OFPR: S2.a2 Purchase equipment
|
OFPR
|
SPIRAL2
|
#381 |
OFIU: S2.a2 Purchase equipment
|
chsmall@grnoc.iu.edu
|
major
|
OFIU: S2.a2 Purchase equipment
|
OFIU
|
SPIRAL2
|
#383 |
OFGT: S2.b Campus small deployments
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.b Campus small deployments
|
OFGT
|
SPIRAL2
|
#380 |
OFGT: S2.a2 Purchase equipment
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a2 Purchase equipment
|
OFGT
|
SPIRAL2
|
#378 |
Milestone OFCLEM: S2.a2 Purchase equipment
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.a2 Purchase equipment
|
OFCLEM
|
SPIRAL2
|
#379 |
OFCLEM: S2.b Campus small deployments
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.b Campus small deployments
|
OFCLEM
|
SPIRAL2
|
#353 |
NetKarma GEC7 Demo request
|
NIDHI
|
major
|
NETKARMA: S2.d demo
|
NETKARMA
|
SPIRAL2
|
#321 |
ProtoGENI Demo at GEC#7
|
NIDHI
|
major
|
PGTools: S2.d Demonstration
|
GPO
|
SPIRAL2
|
#313 |
OnTimeMeasure GEC7 Demo Request
|
NIDHI
|
major
|
OnTime: S2.d: Demo at GEC
|
ONTIME
|
SPIRAL2
|
#331 |
S3Monitor Demo at GEC7
|
NIDHI
|
major
|
S3MONITOR: S2.c Demonstration
|
S3MONITOR
|
SPIRAL2
|
#411 |
Milestone S2.k completion
|
Ilia Baldine
|
major
|
ORCAAUG: S2.k Second ontology workshop
|
ORCAAUG
|
SPIRAL1
|
#409 |
Milestone S2.h completion
|
Ilia Baldine
|
major
|
ORCAAUG: S2.h Eucalyptus VM provisioning
|
ORCAAUG
|
SPIRAL1
|
#408 |
Milestone S2.j completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.j VLANs from BEN to backbone
|
ORCABEN
|
SPIRAL1
|
#407 |
Milestone S2.e completion
|
Ilia Baldine
|
major
|
ORCABEN: S2.e Operate, extend clearinghouse
|
ORCABEN
|
SPIRAL1
|
#339 |
GENI IMF Demo at GEC7
|
NIDHI
|
major
|
IMF: S2.e Initial IMF software
|
IMF
|
SPIRAL2
|
#371 |
Milestone S2.e completion
|
hzhang@cs.wayne.edu
|
major
|
KANSEI: S2.e Bring up NetEye testbed at WSU
|
KANSEI
|
SPIRAL2
|
#370 |
Milestone S2.d completion
|
hzhang@cs.wayne.edu
|
major
|
KANSEI: S2.d Extend researcher portal for use with Kansei and Neteye
|
KANSEI
|
SPIRAL2
|
#328 |
DiCloud GEC7 Demo
|
NIDHI
|
minor
|
DICLOUD: S2.e Demo archiving sensor data
|
DICLOUD
|
SPIRAL2
|
#377 |
Milestone DICLOUD: S2.e Demo archiving sensor data
|
David Irwin
|
minor
|
DICLOUD: S2.e Demo archiving sensor data
|
DICLOUD
|
SPIRAL2
|
#386 |
S2.e completion
|
cecchet@cs.umass.edu
|
major
|
DICLOUD: S2.e Demo archiving sensor data
|
DICLOUD
|
SPIRAL2
|
#327 |
ViSE GEC7 Demo.
|
NIDHI
|
major
|
ViSE: S2.i Demo control of VLAN connections
|
VISE
|
SPIRAL2
|
#375 |
Milestone ViSE: S2.i Demo control of VLAN connections
|
David Irwin
|
minor
|
ViSE: S2.i Demo control of VLAN connections
|
VISE
|
SPIRAL2
|
#374 |
Milestone ViSE: S2.h Import extended ORCA v2.1
|
David Irwin
|
minor
|
ViSE: S2.h Import extended ORCA v2.1
|
VISE
|
SPIRAL2
|
#376 |
Milestone ViSE: S2.g Integration of virtualization
|
David Irwin
|
minor
|
ViSE: S2.g Integration of virtualization
|
VISE
|
SPIRAL2
|
#373 |
Milestone ViSE: S2.f Installation of cameras
|
David Irwin
|
minor
|
ViSE: S2.f Installation of cameras
|
VISE
|
SPIRAL2
|
#404 |
Milestone S2.c completion
|
j-mambretti@northwestern.edu
|
major
|
IGENI: S2.c Integrate iGENI with ORCA
|
IGENI
|
SPIRAL1
|
#334 |
GEC7 demo LEARN project
|
NIDHI
|
major
|
LEARN: S2.i Implement and integrate Measurement Handler
|
ORCABEN
|
SPIRAL2
|
#365 |
Milestone completion for LEARN: S2-i
|
dgurkan@uh.edu
|
major
|
LEARN: S2.i Implement and integrate Measurement Handler
|
LEARN
|
SPIRAL2
|
#511 |
Demo given
|
hdempsey@bbn.com
|
major
|
TIED: S2.b TIED GEC demo
|
GPO
|
SPIRAL2
|
#481 |
Milestone S2.c Completion
|
andyli
|
major
|
OKGEMS: S2.c Integrate lab sensor nodes
|
OKGEMS
|
SPIRAL2
|
#307 |
Develop slice view prototype with shared data from at least one GENI project
|
jph@grnoc.iu.edu
|
major
|
GMOC: S2.c Prototype slice view of operational data sharing
|
GMOC
|
SPIRAL2
|
#433 |
Demonstrate slice view prototype
|
somebody
|
major
|
GMOC: S2.c Prototype slice view of operational data sharing
|
GMOC
|
SPIRAL2
|
#424 |
Milestone S2.b completion
|
grunwald@cs.colorado.edu
|
major
|
COGRADIO: S2.b Phase 1 radio card for stand-alone system
|
COGRADIO
|
SPIRAL2
|
#423 |
Milestone S2.a completion
|
grunwald@cs.colorado.edu
|
major
|
COGRADIO: S2.a Roadmap for stand-alone and infrastructure-class platforms
|
COGRADIO
|
SPIRAL1
|
#422 |
Milestone S2.f completion
|
Ivan Seskar
|
major
|
WiMAX: S2.f WiMAX client platforms study
|
WIMAX
|
SPIRAL2
|
#295 |
Milestone S2.c completion
|
blynn@cs.umass.edu
|
major
|
DOME: S2.c Control VLAN connections
|
DOME
|
SPIRAL1
|
#368 |
Milestone DOME: S2.c completion
|
blynn@cs.umass.edu
|
major
|
DOME: S2.c Control VLAN connections
|
DOME
|
SPIRAL1
|
#532 |
Milestone S2.c completion
|
Ivan Seskar
|
major
|
COGRADIO: S2.c Integrate stand-alone platform
|
COGRADIO
|
SPIRAL2
|
#413 |
Milestone S2.c completion
|
Ivan Seskar
|
major
|
ORBIT: S2.c Extend OMF for experiments driven by context
|
ORBIT
|
SPIRAL1
|
#410 |
Milestone S2.j completion
|
Ilia Baldine
|
major
|
ORCAAUG: S2.j First draft of the ontology schema
|
ORCAAUG
|
SPIRAL1
|
#357 |
ORCA actor registry
|
somebody
|
major
|
ORCAAUG: S2.e Single registry of brokers
|
ORCAAUG
|
SPIRAL1
|
#356 |
Bella 2.1
|
somebody
|
major
|
ORCAAUG: S2.a Rel 2.1_2 ORCA code to projects
|
ORCAAUG
|
SPIRAL2
|
#355 |
Bella 2.1
|
somebody
|
major
|
ORCABEN: S2.a Rel 2.1_1 ORCA code to projects
|
ORCABEN
|
SPIRAL2
|
#361 |
Milestone S2.b completion
|
caroline@ee.columbia.edu
|
major
|
ERM: S2.b Demo software interface from UMF to embedded measurement subsystem
|
ERM
|
SPIRAL2
|
#224 |
milestone 1f completion
|
Ivan Seskar
|
major
|
WiMAX: 1f VLAN connections to the GENI backbone network
|
WIMAX
|
SPIRAL1
|
#91 |
milestone 1d completion
|
Ivan Seskar
|
major
|
ORBIT: 1d Provide VLAN connections to the GENI backbone
|
ORBIT
|
SPIRAL1
|
#421 |
Milestone S2.d completion
|
Ivan Seskar
|
major
|
WiMAX: S2.d Demo VLAN connection to backbone
|
WIMAX
|
SPIRAL2
|
#416 |
Milestone S2.e completion
|
Ivan Seskar
|
major
|
ORBIT: S2.e Demo VLAN connection to backbone
|
ORBIT
|
SPIRAL1
|
#276 |
Providing CM for VLAN creation on backbone switches to other projects
|
Leigh Stoller
|
major
|
ProtoGENI.S2.e: ProtoGENI backbone resources available to other clusters
|
GPO
|
SPIRAL1
|
#308 |
OFPR: S2.a1 Select vendors
|
mfreed@cs.princeton.edu
|
major
|
OFPR: S2.a1 Select vendors
|
OFPR
|
SPIRAL2
|
#306 |
Document Emergency Stop mechanisms proposed for Spiral 2, and prototype with GENI projects
|
cviecco@grnoc.iu.edu
|
major
|
GMOC: S2.b Prototype manual emergency shutdown
|
GMOC
|
SPIRAL2
|
#324 |
Submitting milestone S2.d document
|
somebody
|
minor
|
IMF: S2.d First component architecture
|
IMF
|
SPIRAL2
|
#299 |
Milestone S2.a change
|
hmussman@bbn.com
|
major
|
IMF: S2.a Initial architecture-
|
IMF
|
SPIRAL1
|
#323 |
Submitting milestone S2.a document
|
somebody
|
minor
|
IMF: S2.a Initial architecture-
|
IMF
|
SPIRAL2
|
#316 |
Milestone S2.d completion
|
cecchet@cs.umass.edu
|
major
|
DICLOUD: S2.d Policy to track usage
|
DICLOUD
|
SPIRAL1
|
#317 |
NDL ontology call/workshop completed
|
somebody
|
major
|
ORCAAUG: S2.i First ontology workshop
|
ORCAAUG
|
SPIRAL2
|
#510 |
Completed design spec
|
somebody
|
major
|
TIED: S2.a Design specification for plugin
|
GPO
|
SPIRAL2
|
#311 |
OFUWI: S2.a1 Select vendors
|
akella@cs.wisc.edu
|
major
|
OFUWI: S2.a1 Select vendors
|
OFUWI
|
SPIRAL2
|
#310 |
OFUWA: S2.a1 Select vendors
|
arvind@cs.washington.edu
|
major
|
OFUWA: S2.a1 Select vendors
|
OFUWA
|
SPIRAL2
|
#309 |
OFRG: S2.a1 Select vendors
|
Ivan Seskar
|
major
|
OFRG: S2.a1 Select vendors
|
OFPR
|
SPIRAL2
|
#302 |
OFGT: S2.a1 Select vendors
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a1 Select vendors
|
OFGT
|
SPIRAL2
|
#359 |
milestone completion
|
cecchet@cs.umass.edu
|
major
|
DICLOUD: S2.c Handlers to allocate cloud
|
DICLOUD
|
SPIRAL1
|