#842 |
Milestone S3.g completion
|
cecchet@cs.unass.edu
|
major
|
DICLOUD: S3.g Demonstration at GEC11 and Experimenter Outreach
|
DICLOUD
|
SPIRAL3
|
#843 |
Milestone S3.h completion
|
cecchet@cs.unass.edu
|
major
|
DICLOUD: S3.h Documentation and code release
|
DICLOUD
|
SPIRAL3
|
#373 |
Milestone ViSE: S2.f Installation of cameras
|
David Irwin
|
minor
|
ViSE: S2.f Installation of cameras
|
VISE
|
SPIRAL2
|
#376 |
Milestone ViSE: S2.g Integration of virtualization
|
David Irwin
|
minor
|
ViSE: S2.g Integration of virtualization
|
VISE
|
SPIRAL2
|
#374 |
Milestone ViSE: S2.h Import extended ORCA v2.1
|
David Irwin
|
minor
|
ViSE: S2.h Import extended ORCA v2.1
|
VISE
|
SPIRAL2
|
#375 |
Milestone ViSE: S2.i Demo control of VLAN connections
|
David Irwin
|
minor
|
ViSE: S2.i Demo control of VLAN connections
|
VISE
|
SPIRAL2
|
#720 |
Milestone ViSE: S3.a Demonstration at GEC9 and Experimenter Outreach
|
hmussman@bbn.com
|
minor
|
ViSE: S3.a Demonstration at GEC9 and Experimenter Outreach
|
GPO
|
SPIRAL3
|
#721 |
Milestone ViSE: S3.b Documentation and Code Release
|
hmussman@bbn.com
|
minor
|
ViSE: S3.b Documentation and Code Release
|
GPO
|
SPIRAL3
|
#43 |
Million Node GENI demo at GEC 4
|
hdempsey@bbn.com
|
trivial
|
|
MILNGENI
|
SPIRAL1
|
#221 |
Million node GENI demo for GEC6
|
NIDHI
|
major
|
|
MILNGENI
|
SPIRAL2
|
#444 |
Million node GENI demo requirements
|
hdempsey@bbn.com
|
major
|
|
MILNGENI
|
SPIRAL2
|
#1129 |
Minimum Loss Resiliency for Fault-Tolerant Distributed OpenFlow-based Switches
|
peter.stickney@bbn.com
|
major
|
LEARN: S2.l Contribution to GENI outreach
|
GPO
|
SPIRAL6
|
#1209 |
Mismatch in getversion code_tag and for ION and MAX aggregates
|
ckotil@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1154 |
Missing Site VLAN Delegation information
|
asydney@bbn.com
|
major
|
|
STITCHING
|
SPIRAL6
|
#572 |
MNG demo for GEC 9...
|
hdempsey@bbn.com
|
major
|
|
MILNGENI
|
SPIRAL2
|
#1160 |
Mobile Video Streaming
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#987 |
Mobility Services Engine Demo
|
peter.stickney@bbn.com
|
major
|
|
WIMXUWI
|
SPIRAL5
|
#85 |
modify milestone to add an extra protoGENI node to I2 in Spiral 1
|
somebody
|
major
|
ProtoGENI: Integrate, install 3 nodes in I2 -
|
GPO
|
SPIRAL1
|
#161 |
modify milestone to add an extra protoGENI node to I2 in Spiral 1
|
somebody
|
major
|
SPP: Deploy three SPP nodes -
|
SPP
|
SPIRAL1
|
#1297 |
Move CENIC OpenFlow aggregate to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1144 |
Move Clemson InstatGENI GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1165 |
Move Cornell University InstaGENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1104 |
Move Georgia Tech GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1409 |
Move Internet2 AL2S aggregate to production
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1143 |
Move MAX GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1304 |
Move Naval Postgraduate School (NPS) InstaGENI rack to production status
|
somebody
|
major
|
|
GPO
|
SPIRAL6
|
#1105 |
Move NYSERNet GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1147 |
Move NYU GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1333 |
Move Rutgers InstaGENI rack to production
|
somebody
|
major
|
|
GPO
|
SPIRAL6
|
#1270 |
Move SOX GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1293 |
Move Starlight OpenFlow aggregate to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1268 |
Move University of Illinois at Urbana-Champaign (UIUC) InstaGENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1145 |
Move University of Missouri-Columbia GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1098 |
Move University of Utah Downtown Data Center GENI rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1155 |
Move University of Wisconsin-Madison rack to production status
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#900 |
MOXIREGIONAL: S4.b Choose vendors and have orders in for OpenFlow switches and related equipment
|
jph@grnoc.iu.edu
|
major
|
MOXIREGIONAL: S4.b Choose vendors and have orders in for OpenFlow switches and related equipment
|
MOXIREGIONAL
|
SPIRAL4
|
#936 |
MOXIREGIONAL: S4.c Acquire and test switches for CIC OmniPoP, IU and MERIT
|
somebody
|
major
|
MOXIREGIONAL: S4.c Acquire and test OpenFlow switches and supporting equipment
|
MOXIREGIONAL
|
SPIRAL4
|
#937 |
MOXIREGIONAL: S4.d Deploy CIC OmniPoP, IU GigaPoP, and MERIT systems and software
|
hdempsey@bbn.com
|
major
|
MOXIREGIONAL: S4.d Deploy systems and software
|
MOXIREGIONAL
|
SPIRAL4
|
#938 |
MOXIREGIONAL: S4.e CIC OmniPoP and IU GigaPoP switches participate in multisite demo
|
somebody
|
major
|
MOXIREGIONAL: S4.e Support multi-campus demo
|
MOXIREGIONAL
|
SPIRAL4
|
#1193 |
MOXI Slice Demo
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#699 |
MPLS-OpenFlow based access/aggregation network
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#1203 |
Multi-Domain OpenFlow
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#649 |
Multiflow TCP Demo Request.
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#1066 |
Multi-homing support in MobilityFirst FIA
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1424 |
Multipoint Connected Collaboration
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#906 |
Multi-Site Experimentation with GENI WiMAX
|
agosain@bbn.com
|
major
|
|
WIMXNYUPT
|
SPIRAL4
|
#1107 |
MU-OSU Science DMZ Demo
|
peter.stickney@bbn.com
|
major
|
|
ONTIME
|
SPIRAL6
|
#799 |
MySlice over SFA GUI demo
|
Josh Smift
|
major
|
PLFED: S2.d demo gui
|
PLFED
|
SPIRAL4
|
#861 |
MySlice over SFA GUI demo
|
agosain@bbn.com
|
major
|
PLFED: S2.d demo gui
|
PLFED
|
SPIRAL4
|
#1117 |
MySlice, the portal technology for the FIRE facilities
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#317 |
NDL ontology call/workshop completed
|
somebody
|
major
|
ORCAAUG: S2.i First ontology workshop
|
ORCAAUG
|
SPIRAL2
|
#58 |
Need additional configuration documentation
|
dga@cs.cmu.edu
|
major
|
CMU Lab: desired node config & boot mgmt functionality
|
GPO
|
SPIRAL1
|
#204 |
need documentation of milestone completion
|
prs@cs.cmu.edu
|
major
|
CMU Lab: student testbed use
|
GPO
|
SPIRAL1
|
#431 |
Need process for providing software to GENI software releases.
|
hdempsey@bbn.com
|
major
|
INSTOOLS: S2.b Contribute Instrumentation Tools project software
|
GPO
|
SPIRAL2
|
#8 |
need README, LICENSE files
|
feamster@cc.gatech.edu
|
major
|
BGPMux: BGP Mux 0.1 sw release
|
BGPMUX
|
SPIRAL1
|
#24 |
need to make draft RSpec proposals public
|
duerig@cs.utah.edu
|
major
|
CMU Lab: Formulate initial RSpecs for wireless nodes
|
CMULAB
|
SPIRAL1
|
#289 |
NetKarma Dec 2009 Milestones
|
chris@bbn.com
|
major
|
NETKARMA: S2.c identify tools
|
GPO
|
SPIRAL2
|
#663 |
NetKarma Demo
|
hdempsey@bbn.com
|
major
|
|
NETKARMA
|
SPIRAL2
|
#872 |
NetKarma Demo at GEC13: GENI Provenance Registry and Portal
|
agosain@bbn.com
|
major
|
|
NETKARMA
|
SPIRAL4
|
#241 |
NetKarma GEC6 Demo/Poster
|
NIDHI
|
major
|
|
NETKARMA
|
SPIRAL2
|
#353 |
NetKarma GEC7 Demo request
|
NIDHI
|
major
|
NETKARMA: S2.d demo
|
NETKARMA
|
SPIRAL2
|
#780 |
Netkarma Milestone Delivered, Wiki updated
|
Vic Thomas
|
major
|
NETKARMA: S3.f Deliver software and documentation
|
GPO
|
SPIRAL3
|
#709 |
NETKARMA Project Demonstration
|
chaos@bbn.com
|
major
|
NETKARMA: S3.c Demonstration and Outreach at GEC10
|
NETKARMA
|
SPIRAL3
|
#941 |
NETKARMA: S4.c Provenance system demo; I&M contributions and GEC 14 Report
|
Vic Thomas
|
major
|
NETKARMA: S4.c Provenance system demo; I&M contributions
|
GPO
|
SPIRAL4
|
#470 |
NetServ demo resource request for GEC8
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#823 |
NetServ on OpenFlow
|
Josh Smift
|
major
|
|
GPO
|
SPIRAL4
|
#1481 |
Network Attack Experimentation using OpenFlow-enabled GENI Testbed
|
peter.stickney@bbn.com
|
minor
|
|
GPO
|
SPIRAL7
|
#1188 |
Network characterization of Hadoop using GENI
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1002 |
Network-coding in content-aware networks
|
peter.stickney@bbn.com
|
major
|
|
EXPERIMENTS
|
SPIRAL5
|
#578 |
Network Coding on GENI
|
hdempsey@bbn.com
|
major
|
|
OFUWI
|
SPIRAL2
|
#983 |
Network Coding on ProtoGENI for Vehicular Networks
|
peter.stickney@bbn.com
|
major
|
|
WIMXCLEM
|
SPIRAL5
|
#1317 |
Network Complexity Index
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1314 |
Network Debugging
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1398 |
Network Function Instantiation
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1307 |
Network Functions Virtualization using ProtoRINA
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1238 |
Network Resiliance with OpenFlow
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1488 |
Network Troubleshooting with SDN Traceroute Protocol (SDNTrace)
|
peter.stickney@bbn.com
|
major
|
LEARN: S2.l Contribution to GENI outreach
|
GPO
|
SPIRAL7
|
#1130 |
Novel IPv6 Addressing Scheme for SDN
|
peter.stickney@bbn.com
|
major
|
LEARN: S2.l Contribution to GENI outreach
|
GPO
|
SPIRAL6
|
#726 |
NOX-at-Home Demo
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#931 |
Occupying GENI with Social Packets
|
agosain@bbn.com
|
major
|
DSL: S4.c Demonstration and outreach at GEC14
|
DSL
|
SPIRAL4
|
#1331 |
OESS advertisement missing stitching information for New York and Salt Lake
|
luke@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1142 |
OESS aggregate does not expire slivers
|
luke@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1138 |
OESS aggregate getversion does not return meaningful FOAM version
|
luke@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1140 |
oess geni_status remains in "configuring" state even after circuits are ready
|
luke@grnoc.iu.edu
|
critical
|
|
STITCHING
|
SPIRAL6
|
#1137 |
OESS request Rspecs do not pass rspeclint due to schema location mismatch and schema syntax
|
luke@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#300 |
OFCLEM: S2.a1 Select vendors
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.a1 Select vendors
|
OFCLEM
|
SPIRAL2
|
#379 |
OFCLEM: S2.b Campus small deployments
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.b Campus small deployments
|
OFCLEM
|
SPIRAL2
|
#585 |
OFCLEM: S2.c Install GENI software with AM API implementation
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.c Install GENI software with AM API implementation
|
OFCLEM
|
SPIRAL2
|
#586 |
OFCLEM: S2.d Begin integration testing with Stanford and BBN
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.d Begin integration testing with Stanford and BBN
|
OFCLEM
|
SPIRAL2
|
#587 |
OFCLEM: S2.e Plan and engineer GEC 9 demo
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.e Plan and engineer GEC 9 demo
|
OFCLEM
|
SPIRAL2
|
#588 |
OFCLEM: S2.f Upgrade small deployments to use OF 1.0
|
Kuang-Ching Wang
|
major
|
OFCLEM: S2.f Upgrade small deployments to use OF 1.0
|
OFCLEM
|
SPIRAL2
|
#789 |
OFCLEM: Steroid OpenFlow Service
|
Josh Smift
|
major
|
|
OFCLEM
|
SPIRAL4
|
#302 |
OFGT: S2.a1 Select vendors
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a1 Select vendors
|
OFGT
|
SPIRAL2
|
#380 |
OFGT: S2.a2 Purchase equipment
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.a2 Purchase equipment
|
OFGT
|
SPIRAL2
|
#383 |
OFGT: S2.b Campus small deployments
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.b Campus small deployments
|
OFGT
|
SPIRAL2
|
#589 |
OFGT: S2.c Install GENI software with AM API implementation
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.c Install GENI software with AM API implementation
|
OFGT
|
SPIRAL2
|
#590 |
OFGT: S2.d Begin integration testing with Stanford and BBN
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.d Begin integration testing with Stanford and BBN
|
OFGT
|
SPIRAL2
|
#591 |
OFGT: S2.e Plan and engineer GEC 9 demo
|
feamster@cc.gatech.edu
|
major
|
OFGT: S2.e Plan and engineer GEC 9 demo
|
OFGT
|
SPIRAL2
|
#525 |
OFGT: S2.f Upgrade small deployments to use OF 1.0
|
Heidi Dempsey
|
major
|
OFGT: S2.f Upgrade small deployments to use OF 1.0
|
OFGT
|
SPIRAL2
|
#402 |
OFI2: S2.a Complete initial deployment plan
|
matt@internet2.edu
|
major
|
OFI2: S2.a Complete initial deployment plan
|
OFI2
|
SPIRAL2
|