Timeline



02/02/10:

18:41 TIED edited by faber@isi.edu
(diff)
16:03 Ticket #242 (GEC6: Enterprise GENI demo) closed by hdempsey@bbn.com
fixed
16:02 Ticket #226 (GEC6 demo request) closed by hdempsey@bbn.com
fixed
16:02 Ticket #253 (GEC 6 demo: easel request for SCAFFOLD) closed by hdempsey@bbn.com
fixed
16:02 Ticket #251 (GEC 6: Instrumentation tools demo request) closed by hdempsey@bbn.com
fixed
16:01 Ticket #248 (ETRI Virtualized Programmable Plaftorm Demo) closed by hdempsey@bbn.com
fixed
16:01 Ticket #243 (GEC6: CMU Demo) closed by hdempsey@bbn.com
fixed
16:00 Ticket #241 (NetKarma GEC6 Demo/Poster) closed by hdempsey@bbn.com
fixed
15:59 Ticket #240 (ORCA-BEN Demo at GEC6) closed by hdempsey@bbn.com
fixed
15:58 Ticket #239 (GMOC GEC6 demo requiremetns) closed by hdempsey@bbn.com
fixed
15:58 Ticket #238 (PlanetLab Demo) closed by hdempsey@bbn.com
fixed
15:58 Ticket #237 (ViSE GEC6 Demo) closed by hdempsey@bbn.com
fixed
15:58 Ticket #236 (KanseiGenie poster/demo) closed by hdempsey@bbn.com
fixed
15:57 Ticket #235 (UMLPEN GEC6 demo request) closed by hdempsey@bbn.com
fixed
15:56 Ticket #234 (ERM poster/demo for GEC6) closed by hdempsey@bbn.com
fixed
15:56 Ticket #233 (ProtoGENI demo at GEC#6) closed by hdempsey@bbn.com
fixed
15:25 Ticket #232 (Digital Object Repository in GENI) closed by hdempsey@bbn.com
fixed
15:25 Ticket #228 (GEC6 Demo Request) closed by hdempsey@bbn.com
fixed
15:24 Ticket #227 (BGP-Mux demo) closed by hdempsey@bbn.com
fixed
15:24 Ticket #225 (Raven GEC6 demo) closed by hdempsey@bbn.com
fixed
15:22 Ticket #223 (Demonstration of Supercharged Planetlab Platforms (SPP) for GEC6) closed by hdempsey@bbn.com
fixed
15:22 Ticket #221 (Million node GENI demo for GEC6) closed by hdempsey@bbn.com
fixed
15:21 Ticket #304 (Plan for GEC7 demos) created by hdempsey@bbn.com
Determine/coordinate demo needs and plan for supporting demos.
14:40 WIMXNYUPT edited by hmussman@bbn.com
(diff)
11:05 Ticket #303 (Seung-Jong Park needs wiki password reset.) closed by chaos@bbn.com
fixed: I sent him his password; i believe this is now resolved.

02/01/10:

17:38 Ticket #303 (Seung-Jong Park needs wiki password reset.) created by Vic Thomas
Says he clicked some "help" or "feedback" link on the Wiki and …
15:35 Milestone VMI-FED: S2.b ASSERT doc completed
02/01/10 – Finalize and post ASSERT Virtualization Resource Analysis …
12:55 Ticket #302 (OFGT: S2.a1 Select vendors) created by Josh Smift
Select vendors for on-campus hardware evaluations.
12:53 OFGT edited by Josh Smift
(diff)
12:31 ComprehensiveSecurityPgm edited by Vic Thomas
(diff)

01/31/10:

17:01 Milestone OnTime: S2.c: Platform setup for OnTimeMeasure-GENI completed
Platform setup for “OnTimeMeasure-GENI” Version 1.0 software …
00:00 Milestone OFUWA: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.
00:00 Milestone OFGT: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.
00:00 Milestone OFUWI: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.
00:00 Milestone OFNOX: S2.c Initial rough NOX API documentation completed
Provide initial rough NOX API documentation for OF development team review.
00:00 Milestone OFRG: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.

01/29/10:

17:22 OnTime-DevPlat edited by Prasad Calyam
(diff)
17:21 OnTime-DevPlat edited by Prasad Calyam
(diff)
17:21 OnTime-DepPlat edited by Prasad Calyam
(diff)
17:20 OnTime-DepPlat edited by Prasad Calyam
(diff)
17:20 OnTime-DepPlat edited by Prasad Calyam
(diff)
17:19 OnTime-DepPlat created by Prasad Calyam
17:00 OnTime-DevPlat edited by Prasad Calyam
(diff)
16:59 OnTime-DevPlat created by Prasad Calyam
16:59 OnTimeMeasure edited by Prasad Calyam
(diff)
16:58 OnTimeMeasure edited by Prasad Calyam
(diff)
12:33 Ticket #301 (MetaVPN software is usable) created by pgunn@cs.cmu.edu
The MetaVPN software that is at the heart of this ticket is usable, …
12:27 CmuLab edited by pgunn@cs.cmu.edu
(diff)
12:24 README attached to CmuLab by pgunn@cs.cmu.edu
Release notes for MetaVPN
12:23 CmuLab edited by pgunn@cs.cmu.edu
(diff)
11:57 2009-01-29 S2c Orca-Amazon Cloud handlers.pdf attached to DICLOUD by David Irwin
Orca Amazon Handler Guide
11:57 orca_amazon_handlers.tgz attached to DICLOUD by David Irwin
Orca Amazon Cloud Handlers

01/28/10:

17:55 Milestone DICLOUD: S2.c Handlers to allocate cloud completed
Develop 3 Orca handlers to allocate and revoke resources from Amazon’s …
16:47 Milestone Quilt: S2.b Convene Planning Committee completed
Per ticket #522 Planning Committee met beginning January 2010
16:37 Milestone Quilt: S2.a Form Workshop Committee completed
Committe formed 1/10.
15:34 Milestone OFCLEM: S2.a1 Select vendors completed
Select vendors for on-campus hardware evaluations.
15:33 Ticket #300 (OFCLEM: S2.a1 Select vendors) closed by Josh Smift
fixed: KC writes: […] This is sufficient to complete this milestone, so …
15:30 Ticket #300 (OFCLEM: S2.a1 Select vendors) created by Josh Smift
Select vendors for on-campus hardware evaluations.
15:29 MilestonesAndTickets edited by Josh Smift
(diff)
15:28 MilestonesAndTickets edited by Josh Smift
(diff)
10:07 OFCLEM edited by Josh Smift
Split the first milestone into two (diff)

01/27/10:

16:42 OnTimeMeasure edited by Vic Thomas
(diff)
16:32 OnTime-Dec09 created by Vic Thomas
16:31 OnTimeMeasure edited by Vic Thomas
(diff)
14:04 ComprehensiveSecurityPgm edited by Vic Thomas
(diff)
11:15 clusterdvlan edited by hmussman@bbn.com
(diff)
11:13 clusterdvlan edited by hmussman@bbn.com
(diff)
10:33 ExptsSec-designdoc-1.pdf attached to ExptsSecurityAnalysis by Vic Thomas
Description of experiments to be performed.
10:32 ExptsSecurityAnalysis edited by Vic Thomas
(diff)
10:29 QSR-Dec09.pdf attached to ExptsSecurityAnalysis by Vic Thomas
Quarterly Status Report --- Dec 2009
10:07 OpenCIRRUS edited by Vic Thomas
(diff)
10:07 SpiralTwo edited by Vic Thomas
(diff)

01/26/10:

11:10 Gec7Agenda edited by Aaron Falk
(diff)
09:15 WikiStart edited by Aaron Falk
(diff)
00:00 Milestone OFNOX: S2.a Publish NOX feature list completed
Publish NOX feature list with technical descriptions for OpenFlow 1.0 …

01/25/10:

16:01 Gec7Agenda edited by Aaron Falk
(diff)
15:41 Gec7Agenda edited by Aaron Falk
(diff)
15:41 Gec7Agenda edited by Aaron Falk
(diff)
15:39 WikiStart edited by Aaron Falk
(diff)
15:39 WikiStart edited by Aaron Falk
Removed link to gec6.geni.net after adding a link to it on the GEC6 … (diff)
15:38 Gec6Agenda edited by Aaron Falk
(diff)
15:37 WikiStart edited by Aaron Falk
added GEC7 agenda link (diff)
15:36 Gec7Agenda created by Aaron Falk
initial public posting of agenda
15:02 GushProto edited by Vic Thomas
(diff)
14:44 GushProto edited by Vic Thomas
(diff)
14:38 GUSH-userStudy-Fall09.pdf attached to GushProto by Vic Thomas
GUSH - User Study 2 (Fall 2009)
14:37 qsr-dec09.txt attached to GushProto by Vic Thomas
Quarterly Status Report --- Dec 2009

01/23/10:

14:09 WiMAXInteg edited by Ivan Seskar
(diff)
12:28 WiMAXInteg/CampusInstallation edited by Ivan Seskar
(diff)
08:05 WiMAXInteg edited by Ivan Seskar
(diff)

01/22/10:

18:20 SpiralTwo edited by Vic Thomas
(diff)

01/20/10:

22:01 geni-rbac-req-0.5a.pdf attached to ABAC by jay.jacobs@cobham.com
18:19 LEARN edited by hmussman@bbn.com
(diff)
18:18 GENI_QSR_LEARN_Jan08-2010.pdf attached to LEARN by hmussman@bbn.com
18:15 Ticket #270 (Milestone S2.h completion) closed by hmussman@bbn.com
fixed
18:13 Ticket #270 (Milestone S2.h completion) reopened by hmussman@bbn.com
18:04 ORCABEN edited by hmussman@bbn.com
(diff)
17:55 Ticket #299 (Milestone S2.a change) closed by hmussman@bbn.com
fixed
17:55 Ticket #299 (Milestone S2.a change) created by hmussman@bbn.com
Changed to 01/20/10, per note from Rudra Dutta on 1/6/10; "As you …
17:53 IMF edited by hmussman@bbn.com
(diff)
17:38 Ticket #117 (milestone 1b completion) closed by hmussman@bbn.com
fixed
17:02 KanseiSensorNet edited by hmussman@bbn.com
(diff)
17:02 KanseiGenie_4Q09 Spiral 2-Fall 2009 StatusReport.pdf attached to KanseiSensorNet by hmussman@bbn.com
17:01 KanseiGenie_3Q09 Spiral 1-Annual StatusReport.pdf attached to KanseiSensorNet by hmussman@bbn.com
16:59 KanseiGenie_2Q09 Spiral 1-Spring 2009 StatusReport.pdf attached to KanseiSensorNet by hmussman@bbn.com
16:48 Milestone S3MONITOR: S2.a Plan for measurement system on ProtoGENI completed
Plan for measurement system on ProtoGENI: Software design document. …
16:47 DOME edited by hmussman@bbn.com
(diff)
16:46 Ticket #298 (Milestone S2.j completion) created by hmussman@bbn.com
Per 4Q09 report: Inclusion of Million Node GENI (project Seattle) on …
16:45 Ticket #297 (Milestone S2.m completion) created by hmussman@bbn.com
Work by REU on multi-testbed experimentation. We have an REU student …
16:39 Ticket #296 (MIlestone S2.g completion) created by hmussman@bbn.com
Per 4Q09 report: Milestone 2g has DOME supporting 900 MHz (a.k.a. …
16:37 Ticket #295 (Milestone S2.c completion) created by hmussman@bbn.com
Per 4Q09 report: Since the completion of milestone S2.a, additional …
16:28 DOMEGENI-Y2Q1-status.pdf attached to DOME by hmussman@bbn.com
16:08 ViSE edited by hmussman@bbn.com
(diff)
16:06 Ticket #294 (Milestone S2.m completion) closed by hmussman@bbn.com
fixed
16:06 Ticket #294 (Milestone S2.m completion) created by hmussman@bbn.com
Per 3Q09 status report: October 1st, 2009. Testbed available for …
16:06 Ticket #293 (Milestone S2.m completion) created by hmussman@bbn.com
Per 3Q09 status report: October 1st, 2009. Testbed available for …
15:57 Ticket #292 (S2.p milestone completion) created by hmussman@bbn.com
Per 4Q09 report: We have prepared a 6 lecture seminar to be held in …
15:53 Ticket #291 (Milestone S2.e completion) closed by hmussman@bbn.com
fixed
15:52 Ticket #291 (Milestone S2.e completion) created by hmussman@bbn.com
Per ViSE 4Q09 report on 1/1/09: We have setup a rapidly deployable …
15:41 ViSE edited by hmussman@bbn.com
(diff)
15:40 vise 4q09 quarter5.pdf attached to ViSE by hmussman@bbn.com
15:28 clusterdvlan edited by hmussman@bbn.com
(diff)
15:27 clusterdvlan edited by hmussman@bbn.com
(diff)
15:04 clusterdvlan edited by hmussman@bbn.com
(diff)
15:03 clusterdvlan edited by hmussman@bbn.com
(diff)
15:02 clusterdvlan edited by hmussman@bbn.com
(diff)
14:58 clusterdvlan edited by hmussman@bbn.com
(diff)
14:29 DICLOUD edited by hmussman@bbn.com
(diff)
13:37 WiMAXInteg edited by hmussman@bbn.com
(diff)
13:36 WIMXRG edited by hmussman@bbn.com
(diff)
13:26 WIMXUWI edited by hmussman@bbn.com
(diff)
13:26 WIMXUWI edited by hmussman@bbn.com
(diff)
13:25 WIMXUWI edited by hmussman@bbn.com
(diff)
13:23 WIMXUWI edited by hmussman@bbn.com
(diff)
13:22 WIMXUWI created by hmussman@bbn.com
13:15 SpiralTwo edited by hmussman@bbn.com
(diff)
10:15 GENIMetaOps edited by chsmall@grnoc.iu.edu
(diff)
10:14 GMOC QR -Q3.pdf attached to GENIMetaOps by chsmall@grnoc.iu.edu
Spiral1 Q3 Quarterly Report
10:01 GENIMetaOps edited by chsmall@grnoc.iu.edu
Added links to Quarterly Reports (diff)

01/19/10:

08:59 ABAC edited by Stephen Schwab
(diff)
08:50 Ticket #290 (ABAC requirement milestone deliverable report) created by Stephen Schwab
Attached is our draft ABAC requirements document for spiral 2 …

01/15/10:

21:20 Milestone CompSec: S2.a completed
Initial collection of use cases relevant for GENI threat and risk …
18:08 Milestone DICLOUD: S2.m Contribution to GENI outreach completed
Specific contribution to GENI outreach plan for Spiral 2. (9/30/10)
17:43 Milestone ViSE: S2.p Contribution to GENI outreach completed
Specific contribution to GENI outreach plan required for Spiral 2: …
16:37 Milestone PlanetLab: S2.b GENI Spiral 2 code release 1 completed
Cleaned-up, documented code from GEC6 demo.
16:37 Milestone ABAC: S2.a completed
A requirements analysis, focusing on the current security …
16:08 GeniServices edited by Aaron Falk
fixed Jeannie's email address (diff)
11:09 Milestone BGPMux: S2.b Initial definition of reference experiment - completed
Publish initial definition of reference experiment. For instance, an …

01/14/10:

17:18 DavisSocialLinks(DSL) edited by Aaron Falk
new GPO SE (diff)
17:17 OpportunisticWirelessNets edited by Aaron Falk
new GPO SE (diff)
16:46 Milestone DOME: S2.j Available to GENI users completed
Make your (federated) testbed, including its extended capabilities, …
14:01 OFCLEM edited by Josh Smift
(diff)
14:00 OFCLEM edited by Josh Smift
(diff)
13:59 1833A-OFCLEM-Report-09Q4.pdf attached to OFCLEM by Josh Smift
13:57 OFCLEM edited by Josh Smift
(diff)
13:55 OFUWI edited by Josh Smift
(diff)
13:54 OFUWA edited by Josh Smift
(diff)
13:52 OFRG edited by Josh Smift
(diff)
13:51 OFIU edited by Josh Smift
(diff)
13:50 OFGT edited by Josh Smift
(diff)
13:49 OFCLEM edited by Josh Smift
(diff)
13:48 OFCLEM edited by Josh Smift
(diff)
13:40 OFNOX created by Josh Smift
13:34 OFPR created by Josh Smift
12:38 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
12:37 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
12:36 sppReport-4Q09 created by Vic Thomas
09:29 MilestonesAndTickets edited by Josh Smift
(diff)

01/13/10:

17:18 Milestone PrimoGENI: S2.b: Design document review completed
Complete review of design document by ProtoGENI, GENI security team, …
09:38 ProgrammableEdgeNode edited by hmussman@bbn.com
(diff)
09:23 ProgrammableEdgeNode edited by hmussman@bbn.com
(diff)
09:21 ProgrammableEdgeNode edited by hmussman@bbn.com
(diff)

01/12/10:

21:30 ClusterC edited by Vic Thomas
(diff)
21:29 ProtoGENI-Aggregates-Schedule.pdf attached to ClusterC by Vic Thomas
ProtoGENI Spiral 2 Aggregates Integration Schedule
21:28 ClusterC edited by Vic Thomas
(diff)
21:26 ProtoGENI-Experiments-Schedule.pdf attached to ClusterC by Vic Thomas
Schedule for ProtoGENI experiments.
16:01 PGAugmentation edited by Vic Thomas
(diff)
13:33 GMOC Annual Report.pdf attached to GENIMetaOps by chsmall@grnoc.iu.edu
GMOC Spiral 1 Annual Report
12:48 Mid-Atlantic Crossroads edited by Vic Thomas
(diff)
12:21 Mid-Atlantic Crossroads edited by Vic Thomas
(diff)
11:32 GENIMeasWS edited by Vic Thomas
(diff)
11:29 GENI-msmt-workshop-report.pdf attached to GENIMeasWS by Vic Thomas
Workshop Report by Barford, Chabarek, Crovella, Sommers, Thomas and Plonka.
10:33 GMOC QR 2009Q4.pdf attached to GENIMetaOps by chsmall@grnoc.iu.edu
GMOC Quarterly Report 2009 Q4

01/11/10:

16:13 LEARN edited by dgurkan@uh.edu
(diff)
16:13 LEARN edited by dgurkan@uh.edu
(diff)
16:11 LEARN edited by dgurkan@uh.edu
(diff)
16:09 LEARN edited by dgurkan@uh.edu
(diff)
16:08 LEARN edited by dgurkan@uh.edu
(diff)
11:53 InstrumentationTools edited by griff@netlab.uky.edu
(diff)
11:41 InstrumentationTools edited by griff@netlab.uky.edu
(diff)
11:33 SpiralTwo edited by hmussman@bbn.com
(diff)
11:31 SpiralTwo edited by hmussman@bbn.com
(diff)
11:29 SpiralTwo edited by hmussman@bbn.com
(diff)
11:27 WIMXRG edited by hmussman@bbn.com
(diff)
11:26 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:24 WiMAXInteg edited by hmussman@bbn.com
(diff)
11:19 WIMXNYUPT edited by hmussman@bbn.com
(diff)
11:18 WIMXCOLUM edited by hmussman@bbn.com
(diff)
11:15 WIMXUCLA edited by hmussman@bbn.com
(diff)
11:14 WIMXUCLA edited by hmussman@bbn.com
(diff)
11:14 WIMXUCLA edited by hmussman@bbn.com
(diff)
07:57 WiMAXInteg/CampusInstallation edited by Ivan Seskar
(diff)

01/08/10:

18:17 WIMXCOLUM edited by hmussman@bbn.com
(diff)
18:13 WIMXCOLUM edited by hmussman@bbn.com
(diff)
18:11 WIMXCOLUM edited by hmussman@bbn.com
(diff)
18:08 WIMXUCLA created by hmussman@bbn.com
18:07 WIMXCOLUM created by hmussman@bbn.com
18:06 SpiralTwo edited by hmussman@bbn.com
(diff)
17:23 INSTOOLS_Shadowbox.pdf attached to Gec6ClusterCMondaySlides by griff@netlab.uky.edu
Kentucky INSTOOL update and proposed Shadowbox projects
17:16 WiMAXInteg/CampusInstallation edited by hmussman@bbn.com
(diff)
10:33 Milestone ExptsSec: S2.a - completed
Design experiment to evaluate the security of select functions in the …

01/07/10:

17:16 PrimoGENI edited by liux@cis.fiu.edu
(diff)

01/06/10:

16:51 LEFA edited by Vic Thomas
(diff)
11:54 GushProto edited by Vic Thomas
(diff)
11:50 SecureUpdates edited by Vic Thomas
(diff)
11:49 SCAFFOLD edited by Vic Thomas
(diff)
11:44 netKarma edited by Vic Thomas
(diff)
11:40 GeniControl edited by Aaron Falk
new GPO SE; added Spiral 2 plans (diff)
11:33 GeniControl edited by Aaron Falk
(diff)
11:31 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:29 OpenCIRRUS edited by Vic Thomas
(diff)
11:29 VMI-FED edited by Vic Thomas
(diff)
11:28 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:27 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:25 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:25 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:24 GEC6CFWGAgenda edited by Aaron Falk
(diff)
11:22 Internet Scale Overlay Hosting edited by Vic Thomas
(diff)
11:20 gec6-cfwg.pdf attached to GEC6CFWGAgenda by Aaron Falk
WG Overview comments by Rob Ricci
11:18 GpENI edited by Vic Thomas
(diff)
10:59 Mid-Atlantic Crossroads edited by Vic Thomas
(diff)

01/05/10:

16:12 instools-design-doc.pdf attached to InstrumentationTools by griff@netlab.uky.edu
Architectural Design and Specification of the INSTOOLS Measurement System
12:17 Embedded Real-Time Measurements edited by caroline@ee.columbia.edu
(diff)
12:15 GENI_QR_ERM_Jan10.pdf attached to Embedded Real-Time Measurements by caroline@ee.columbia.edu
ERM Quarterly Report (Jan 1, 2010)
12:07 ProvisioningService edited by Vic Thomas
(diff)
11:49 S3Monitor-QSR-Dec09 created by Vic Thomas
11:42 ScalableMonitoring edited by Vic Thomas
(diff)

01/04/10:

17:18 Milestone KANSEI: S2.c Extend researcher portal to support workflow management completed
Extend KanseiGenie Researcher Portal to Support Experiment Workflow …
14:25 GEC6CFWGAgenda edited by Aaron Falk
(diff)
13:17 Milestone MILNGENI: S2.b End hosts with intermitted connectivity completed
Operation with end-hosts that have intermittent connectivity and/or …
Note: See TracTimeline for information about the timeline view.