{6} All Tickets By Milestone (Including closed) (1502 matches)

A more complex example to show how to make advanced reports.

Results (301 - 400 of 1502)

1 2 3 4 5 6 7 8 9 10 11 12 13 14

MeasurementSys: S1.a System interface design specification - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#32 Possible change to milestone date. GPO closed fixed SPIRAL1 task major Vic Thomas 04/14/09

MAX: Specific contribution to GENI outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#196 MAX outreach GPO closed fixed SPIRAL1 task major chris@maxgigapop.net 09/09/09

MAX: S2.h DRAGON Aggregate Manager Enhancement Initial Implementation (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#352 Mid-Atlantic Crossroads (MAX) Demo at GEC#7 MAX closed fixed SPIRAL2 task major NIDHI 03/25/10

MAXREGIONAL: S4.b Demonstration at GEC14 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#919 MAX Stitching GEC14 Demonstration MAXREGIONAL closed fixed SPIRAL4 task major agosain@bbn.com 07/10/12

MAX: Purchase virtualization servers and connections (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#73 Purchase virtualization servers and complete end-to-end VLAN connections with backbone MAX closed fixed SPIRAL1 task major Peter O'Neil 03/31/09

MAX: Make a working prototype (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#185 Make prototype available to GENI researchers MAX closed fixed SPIRAL1 task major chris@maxgigapop.net 08/17/09
#132 MANFRED/MAX GEC5 demo MAX closed fixed SPIRAL1 task major Christopher Small 08/17/09

MAX: Integrate DRAGON/GRMS (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#187 Integrate DRAGON/GENI CF with DRAGON testbed GPO closed fixed SPIRAL1 task major chris@maxgigapop.net 08/24/09

MAX: Integrate DRAGON/GENI control framework (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#186 Integrate DRAGON with a GENI CF MAX closed fixed SPIRAL1 task major chris@maxgigapop.net 08/24/09

MAX: Extend DRAGON/GRMS (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#72 Extend DRAGON/GRMS as an aggregate manager to include optical and edge compute resources MAX closed fixed SPIRAL1 task major Peter O'Neil 03/31/09

MAX: Delivery of preliminary design doc (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#212 Milestone MAX: Delivery of preliminary design doc GPO closed fixed SPIRAL1 task major chris@maxgigapop.net 10/01/09

LEARN: S4.e Demonstration at GEC14 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#934 LEARN project: interoperable measurement data exchange GPO closed fixed SPIRAL4 task major agosain@bbn.com 07/10/12

LEARN: S3.f Demonstration at GEC11 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#792 LEARN-ORCA cluster and VLAN demo LEARN closed fixed SPIRAL4 task major Josh Smift 11/16/11

LEARN: S3.d Demonstration at GEC10 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#722 Demo request ticket for GEC10 on ORCA project by University of Houston LEARN closed fixed SPIRAL3 task major chaos@bbn.com 05/25/11

LEARN: S2.l Contribution to GENI outreach (15 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1488 Network Troubleshooting with SDN Traceroute Protocol (SDNTrace) GPO closed fixed SPIRAL7 major peter.stickney@bbn.com 06/18/15
#1121 LEARN: Split data plane (Dell SDP) and ExoGENI integration GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 10/30/13
#1130 Novel IPv6 Addressing Scheme for SDN GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 10/30/13
#1129 Minimum Loss Resiliency for Fault-Tolerant Distributed OpenFlow-based Switches GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 10/30/13
#1128 SDN Management Plane with Dynamic OpenFlow-capable Switch Resources GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 10/30/13
#1126 Distributed Software-Defined Security with Application Traffic Steering GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 10/30/13
#1081 LEARN: LINC as an OpenFlow capable virtual switch on GENI with OFConfig support GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13
#1087 LEARN: Split data plane (Dell SDP) application development environment using Cavium NPU GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13
#1063 LEARN: OFConfig Protocol: visualization of the management plane in OpenFlow/SDN networks GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13
#1060 LEARN: Software-defined distributed security GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13
#1053 LEARN: GIMI measurements to detect ping attack GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13
#978 LEARN: OFConfig on GENI LEARN closed fixed SPIRAL5 task major peter.stickney@bbn.com 03/20/13
#977 LEARN: Split data plane switch to enable an SDN Application Innovation Framework LEARN closed fixed SPIRAL5 task major peter.stickney@bbn.com 03/20/13
#947 LEARN: Interoperable Data Exchange for Real-Time SDN Configuration GPO closed fixed SPIRAL4 task major peter.stickney@bbn.com 10/24/12
#791 I&M MDOD experimenter use case demo of IF-MAP in collaboration with Infoblox LEARN closed fixed SPIRAL3 task major Josh Smift 11/16/11

LEARN: S2.j Deliver release of Measurement Handler (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#430 Milestone completion for LEARN: S2-j Release of Measurement Handler Software GPO closed fixed SPIRAL2 task major dgurkan@uh.edu 06/23/10

LEARN: S2.i Implement and integrate Measurement Handler (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#365 Milestone completion for LEARN: S2-i LEARN closed fixed SPIRAL2 task major dgurkan@uh.edu 04/07/10
#334 GEC7 demo LEARN project ORCABEN closed fixed SPIRAL2 task major NIDHI 03/19/10

LEARN: S2.h Draft measurement data file format (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#270 Milestone S2.h completion LEARN closed fixed SPIRAL1 task major hmussman@bbn.com 01/20/10

LEARN: S2.d Initial integration LEARN into ORCA (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#452 LEARN ORCA integration demo at GEC8 LEARN closed fixed SPIRAL2 task major hdempsey@bbn.com 07/30/10

LEARN: S2.c Establish ORCA framework (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#429 Milestone completion for LEARN: S2-c Establish ORCA control framework LEARN closed fixed SPIRAL2 task major dgurkan@uh.edu 04/23/10
#335 GEC7 demo LEARN project GPO closed fixed SPIRAL2 task major NIDHI 03/24/10

LEARN: S2.b Plan for VLANs on LEARN (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#269 Milestone S2.b completion LEARN closed fixed SPIRAL2 task major somebody 12/02/09

LEARN: S2.a Cluster plan for VLANs between testbeds (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#267 Milestone S2.a completion LEARN closed fixed SPIRAL1 task major hmussman@bbn.com 12/02/09

lanetLab: S2.e GEC8 demo (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#836 Milestone "lanetlab S2.e GEC8 demo" shows up in milestone pulldown list on public wiki and shouldn't GPO closed invalid SPIRAL3 defect minor chaos@bbn.com 10/04/11

LAMP: S2.g Demonstration of perfSONAR on ProtoGENI (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#679 Milestone S2.g completion LAMP new SPIRAL2 task major Vic Thomas 10/21/10

LAMP: S2.f V1.1 of perfSONAR on ProtoGENI - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#678 Milestone S2.f completion LAMP new SPIRAL2 task major Vic Thomas 10/21/10

LAMP: S2.e V1.0 of perfSONAR on ProtoGENI - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#677 Milestone S2.e completion LAMP new SPIRAL2 task major Vic Thomas 10/21/10

LAMP: S2.c Updated prospectus - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#676 Milestone S2.c completion LAMP new SPIRAL2 task major Vic Thomas 10/21/10

LAMP: S2.a Requirements and design doc - (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#675 Milestone S2.a completion LAMP new SPIRAL2 task major Vic Thomas 10/21/10

KGENI: S2.f Playbook Version 2.0 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#574 GEC9 Demonstration for ETRI and KISTI K-GENI and Virtualized Programmable Platform Project KGENI closed fixed SPIRAL2 task major hdempsey@bbn.com 11/15/10

KGENI: S2.d Playbook Version 1.0 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#443 GEC8 Demo - ETRI and KISTI K-GENI Project KGENI closed fixed SPIRAL2 task major hdempsey@bbn.com 07/30/10

KGENI: S2.b Network Selected (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#314 ETRI Virtualized Programmable Plaftorm Demo (GEC7) KGENI closed fixed SPIRAL2 task major NIDHI 03/24/10

Kansei: S3.f Final report and code release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#782 Completed Spiral 3 Tasks KANSEI new SPIRAL3 task major hmussman@bbn.com 08/30/11

Kansei: S3.e Demonstration at GEC11 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#781 Completed Spiral 3 Tasks KANSEI new SPIRAL3 task major hmussman@bbn.com 08/30/11

KANSEI: S2.j POC to GENI response team (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#282 Milestone S2.j completion KANSEI closed fixed SPIRAL1 task major zengw@cse.ohio-state.edu 12/28/09

KANSEI: S2.i Collaborate with GMOC (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#283 Milestone S2.1 completion KANSEI closed fixed SPIRAL1 task major zengw@cse.ohio-state.edu 12/28/09

KANSEI: S2.h Demo experiment using Kansei and NetEye (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#455 KanseiGenie GEC8 demo KANSEI closed fixed SPIRAL2 task major hdempsey@bbn.com 07/30/10

KANSEI: S2.g Import extended ORCA v2.1 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#502 milestone S2.g completion GPO closed fixed SPIRAL2 task major hmussman@bbn.com 04/20/11

KANSEI: S2.f Connections from Kansei and NetEye to Internet2 (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#372 Milestone S2.f completion KANSEI assigned SPIRAL2 task major hzhang@cs.wayne.edu 03/19/10
#501 milestone S2.f completion GPO closed fixed SPIRAL2 task major hmussman@bbn.com 05/06/13

KANSEI: S2.e Bring up NetEye testbed at WSU (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#371 Milestone S2.e completion KANSEI closed fixed SPIRAL2 task major hzhang@cs.wayne.edu 04/07/10

KANSEI: S2.d Extend researcher portal for use with Kansei and Neteye (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#370 Milestone S2.d completion KANSEI closed fixed SPIRAL2 task major hzhang@cs.wayne.edu 04/07/10

KANSEI: 1c2 Integrate Kansei researcher portal- (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#46 Kansei DEMO KANSEI closed fixed SPIRAL1 task major zengw@cse.ohio-state.edu 05/11/09

KANSEI: 1b Establish Kansei testbed clearinghouse (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#117 milestone 1b completion KANSEI closed fixed SPIRAL1 task major anish@cse.ohio-state.edu 01/20/10

KANREN: S4.b Integrate and test with the GpENI PlanetLab control framework (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1080 GpENI / KanREN-GENI / InstaGENI / US Ignite demo for GEC 17 GPO closed fixed SPIRAL5 task major peter.stickney@bbn.com 07/22/13

KANREN: S4.a Acquire and test 2 or 3 Brocade or HP ProCurve OpenFlow switches (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#939 Acquire and test Brocade switches KANREN closed fixed SPIRAL4 task major somebody 07/23/12

INSTOOLS: S2.c Provide project draft input to GENI Spiral Security Review 2 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#432 Steve Schwab to determine if more info is needed from INSTOOLS for security review. SECARCH closed fixed SPIRAL2 task major Stephen.Schwab@cobham.com 06/16/10

INSTOOLS: S2.b Contribute Instrumentation Tools project software (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#431 Need process for providing software to GENI software releases. GPO closed fixed SPIRAL2 task major hdempsey@bbn.com 06/17/10

INSTOOLS: S1.d Deploy AM and open UKY Edulab for GENI (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#214 Provide pointer to AM and tools software and information on how GENI community may request access UKY aggregate. GPO closed fixed SPIRAL1 task major griff@netlab.uky.edu 10/23/09

INSTOOLS: S1.c Integrate and Document Instrumentation Toolset (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#213 Integration and Documentation proceeding GPO closed fixed SPIRAL1 task major griff@netlab.uky.edu 12/30/09

INSTOOLS: S1.b Develop Reference implementation of Aggregate Manager (AM v1.0) (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#71 Produce first implementation of UKY Aggregate Manager INSTOOLS closed fixed SPIRAL1 task major griff@netlab.uky.edu 07/07/09

INSTOOLS: S1.a Upgrade UKY Emulab (3 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#70 Upgrade lab software to become a GENI prototype system INSTOOLS closed fixed SPIRAL1 task major griff@netlab.uky.edu 05/20/09
#69 Optimize Internet2 connection for UKY lab connection (second part of milestone) INSTOOLS closed fixed SPIRAL1 task major griff@netlab.uky.edu 05/20/09
#13 Install new equipment in UKU Emulab INSTOOLS closed fixed SPIRAL1 task major griff@netlab.uky.edu 02/24/09

IMF: S3.f Documentation and code release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#834 Milestone S3.f completion GPO closed fixed SPIRAL3 task major hmussman@bbn.com 05/06/13

IMF: S3.e Demonstration at GEC11 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#833 Milestone S3.d completion GPO closed fixed SPIRAL3 task major hmussman@bbn.com 05/06/13

IMF: S3.d Documentation and Code Release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#762 Milestone S3.d completion GPO closed fixed SPIRAL3 task major somebody 05/25/11

IMF: S3.c Demonstration at GEC10 and Experimenter Outreach (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#740 IMF GEC10 demo IMF closed fixed SPIRAL3 task major chaos@bbn.com 05/25/11
#761 Milestone S3.c completion GPO closed fixed SPIRAL3 task major somebody 05/25/11

IMF: S3.b Documentation and Code Release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#753 Request to close IMF S3.b milestone IMF closed fixed SPIRAL3 task major hmussman@bbn.com 05/25/11

IMF: S3.a Demonstration at GEC9 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#752 Request to close IMF S3.a milestone IMF closed fixed SPIRAL3 task major hmussman@bbn.com 05/25/11

IMF: S2.h Update the IMF software (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#517 Milestone IMF: S2.h completion IMF closed fixed SPIRAL2 task major Rudra Dutta 08/24/10

IMF: S2.g Protocol between SILO and IMF (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#515 Milestone IMF: S2.g completion IMF closed fixed SPIRAL2 task major Rudra Dutta 08/24/10

IMF: S2.e Initial IMF software (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#339 GENI IMF Demo at GEC7 IMF closed fixed SPIRAL2 task major NIDHI 03/24/10

IMF: S2.d First component architecture (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#324 Submitting milestone S2.d document IMF closed fixed SPIRAL2 task minor somebody 04/07/10

IMF: S2.c First GENI instrumentation and measurement architecture (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#516 Milestone S2.c completion IMF closed fixed SPIRAL2 task major Rudra Dutta 08/24/10

IMF: S2.b Initial ontology for measurement (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#514 Milestone IMF S2.b completion IMF closed fixed SPIRAL2 task major Rudra Dutta 08/24/10

IMF: S2.a Initial architecture- (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#323 Submitting milestone S2.a document IMF closed fixed SPIRAL2 task minor somebody 04/07/10
#299 Milestone S2.a change IMF closed fixed SPIRAL1 task major hmussman@bbn.com 01/20/10

iGENI: S3.c Demonstration at GEC10 and Experimenter Outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#714 iGENI Demonsration at GEC 10 IGENI closed fixed SPIRAL3 task major chaos@bbn.com 05/25/11

iGENI: S3.b Documentation and Code Release (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#766 milestone S3.b completion IGENI closed fixed SPIRAL3 task major j-mambretti@northwestern.edu 07/07/11

IGENI: S2.j Explore dynamic L1 connections (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#509 Explore dynamic L1 connections GPO closed fixed SPIRAL2 task major hmussman@bbn.com 10/08/10

IGENI: S2.i Contribution to GENI outreach (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#573 iGENI Contribution To GENI Outreach IGENI closed fixed SPIRAL2 task minor hmussman@bbn.com 10/08/10

IGENI: S2.h POC to GENI security team (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#505 iGENI POC to GENI security team IGENI closed fixed SPIRAL2 task major somebody 08/23/10

IGENI: S2.g POC to GENI response team (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#504 iGENI POC to GENI response team IGENI closed fixed SPIRAL2 task major somebody 08/23/10

IGENI: S2.f Control of iGENI via ORCA to GENI users (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#508 Control of iGENI via ORCA to GENI users GPO closed fixed SPIRAL2 task major somebody 08/23/10

IGENI: S2.e Demo VLAN connections including other research communities (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#507 Demo VLAN connections including other research communities GPO closed fixed SPIRAL2 task major somebody 08/23/10

IGENI: S2.d Demo VLAN connections between GENI aggregates (2 matches)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#506 Demo VLAN connections between GENI aggregates IGENI closed fixed SPIRAL2 task major somebody 08/23/10
#459 IGENI Dynamic Provisioning IGENI closed fixed SPIRAL2 task major hdempsey@bbn.com 08/23/10

IGENI: S2.c Integrate iGENI with ORCA (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#404 Milestone S2.c completion IGENI closed fixed SPIRAL1 task major j-mambretti@northwestern.edu 04/14/10

IGENI: S2.a Define the iGENI infrastucture (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#287 Milestone S2.a completion IGENI closed fixed SPIRAL1 task major j-mambretti@northwestern.edu 12/28/09

HybridCloud: S6.c GEC20 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1220 Simulation-as-a-Service App Demo GPO closed fixed SPIRAL6 major peter.stickney@bbn.com 07/03/14

HybridCloud: S6.b GEC19 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#1162 Simulation-as-a-Service App and ElderCare Project GPO closed fixed SPIRAL6 task major peter.stickney@bbn.com 03/24/14

Hive: S4.c Report on Experimentation and Hive Mind demo (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#921 Hive Mind Demo at GEC14 HIVE closed fixed SPIRAL4 task major agosain@bbn.com 07/10/12

Hive: S3.d Demonstration and outreach at GEC11 (1 match)

Ticket Summary Component Status Resolution Version Type Priority Owner Modified
#887 Current demo of Hive Mind Project GPO closed fixed SPIRAL4 task major agosain@bbn.com 03/14/12