Opened 9 years ago
Closed 9 years ago
#1080 closed (fixed)
GpENI / KanREN-GENI / InstaGENI / US Ignite demo for GEC 17
Reported by: | jpgs@ittc.ku.edu | Owned by: | peter.stickney@bbn.com |
---|---|---|---|
Priority: | major | Milestone: | KANREN: S4.b Integrate and test with the GpENI PlanetLab control framework |
Component: | GPO | Version: | SPIRAL5 |
Keywords: | GEC17 | Cc: | jpgs@ittc.ku.edu |
Dependencies: |
Description
This demonstration will show several aspects of GpENI, KanREN-GENI, the KU InstaGENI rack, and the corresponding KU US Ignite application.
- Resilience experiments over GpENI using PlanetLab GENIwrapper slices over L2 topologies controlled by tinc VPN meshing. Links and nodes will be selectively failed to show the impact on network service, and our network topology optimisation algorithms will be used to show how to improve network resilience and survivability. Furthermore we will show our new Google-map based monitoring visualisation of GpENI link and tinc topologies and node status.
- Progress of deployment of Brocade OpenFlow switches in KanREN (Kansas Research and Education Network), including FOAM and FlowVisor.
- US Ignite application to support family caregivers in managing behavioral symptoms of individuals with dementia. This application (an NSF-funded collaboration between KU and KU Medical Center) includes high-resolution, network-based cameras connected to a video management server located either locally or in an InstaGENI-based cloud to capture significant healthcare events.
List of equipment that will need AC connections (e.g. laptop, switch hardware prototype, monitor). (Just put in the number of connections needed if your demo description already lists the equipment): 8 (3 for the Ignite demo and 5 for laptops to support the other demos)
Number of wired network connections (include required bandwidth if significant): 4
Number of wireless network connections (include required bandwidth if significant): 8
Number of static addresses needed (if any): 0
Monitor (y/n, specify VGA or DVI) (Specify resolution only if your software has resolution restrictions.): 3
Number of posters (max size poster boards are 30" x 40"): 2 in landscape format
Description of any special requests (include any specific network connectivity needs (e.g. layer2 VLAN to NLR), projects you'd like to be located near, etc.):
We are working on connectivity to Starlight, so being close to Joe Mambretti might be good.
Change History (4)
comment:1 Changed 9 years ago by
comment:2 Changed 9 years ago by
Status: | new → assigned |
---|
We will use VGA by default, but DVI can usually be arranged pretty quickly if need be.
comment:3 Changed 9 years ago by
We can now confirm that the resources you requested will be available for you on Demo Night. See you in Madison!
comment:4 Changed 9 years ago by
Resolution: | → fixed |
---|---|
Status: | assigned → closed |
Thanks again for participating in the GEC 17 evening demo session! We hope everything went as planned!
Feel free to edit the wiki to update any information about your demo here - GEC17Agenda/EveningDemoSession
Hi James, do you have any preference on VGA vs. DVI for the three monitors?