Custom Query (1408 matches)

Filters
 
Or
 
  
 
Columns

Show under each result:


Results (301 - 400 of 1408)

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Ticket Summary Owner Priority Milestone Component Version
#620 OFNOX: S2.i Release first version of SNAC/NOX console software Josh Smift major OFNOX: S2.i Release first version of SNAC/NOX console software OFNOX SPIRAL2
#512 Software release completed (30 Jun 20910) faber@isi.edu major TIED: S2.c Fedd release with ProtGeni plug-in GPO SPIRAL2
#527 Close travel request submission. hdempsey@bbn.com major Quilt: S2.e Close Registration and Travel Requests QUILT SPIRAL2
#528 Close Quilt workshop registration hdempsey@bbn.com major Quilt: S2.e Close Registration and Travel Requests QUILT SPIRAL2
#580 OFNLR: S2.b Lab test OpenFlow 1.0 capable switch and controller benninger@psc.edu major OFNLR: S2.b Lab test OpenFlow 1.0 capable switch and controller OFNLR SPIRAL2
#581 OFNLR: S2.c Deploy OpenFlow switches to five POPs benninger@psc.edu major OFNLR: S2.c Deploy OpenFlow switches to five POPs OFNLR SPIRAL2
#322 PrimoGENI demo NIDHI major ABAC: S2.c PRIMOGENI SPIRAL2
#474 COGRADIO demo at GEC8 hdempsey@bbn.com major COGRADIO: S2.d Initial integration stand-alone system and with OMF COGRADIO SPIRAL2
#493 Milestone S2.j Completion hmussman@bbn.com minor ViSE: S2.j Import extended ORCA v2.2 VISE SPIRAL2
#494 S2.k: Testbed Allocation Policy hmussman@bbn.com minor ViSE: S2.k Allocation policy for sensors VISE SPIRAL2
#537 Milestone S2.h completion Ilia Baldine major ORCABEN: S2.h BEN testbed access by GENI users ORCABEN SPIRAL2
#539 Milestone S2.g completion Ilia Baldine major ORCAAUG: S2.g Broker authorization based on attributes from Shibboleth ORCAAUG SPIRAL2
#459 IGENI Dynamic Provisioning hdempsey@bbn.com major IGENI: S2.d Demo VLAN connections between GENI aggregates IGENI SPIRAL2
#506 Demo VLAN connections between GENI aggregates somebody major IGENI: S2.d Demo VLAN connections between GENI aggregates IGENI SPIRAL2
#507 Demo VLAN connections including other research communities somebody major IGENI: S2.e Demo VLAN connections including other research communities GPO SPIRAL2
#508 Control of iGENI via ORCA to GENI users somebody major IGENI: S2.f Control of iGENI via ORCA to GENI users GPO SPIRAL2
#486 Milestone S2.h completion blynn@cs.umass.edu major DOME: S2.h Demo experiment with another testbed DOME SPIRAL2
#441 GEC8 Demonstration for Washington University SPP Project hdempsey@bbn.com major SPP: S2.f demo8 SPP SPIRAL2
#488 Milestone S2.i completed blynn@cs.umass.edu major DOME: S2.i Plan for VLANs to endpoints GPO SPIRAL2
#446 Processing Weather Radar Data on Amazon EC2 hdempsey@bbn.com major DICLOUD: S2.g Demo initial proxy aggregate manager GPO SPIRAL2
#491 Milestone S2.g completion cecchet@cs.umass.edu major DICLOUD: S2.g Demo initial proxy aggregate manager DICLOUD SPIRAL2
#473 WiMAX (including ORBIT) demo at GEC8 hdempsey@bbn.com major WiMAX: S2.h Demo experiments with multiple testbeds WIMAX SPIRAL2
#466 ViSE GEC8 Demo hdempsey@bbn.com major ViSE: S2.l Demo experiment with another testbed VISE SPIRAL2
#455 KanseiGenie GEC8 demo hdempsey@bbn.com major KANSEI: S2.h Demo experiment using Kansei and NetEye KANSEI SPIRAL2
#547 Milestone S2.b completion Ivan Seskar major WIMXRG: S2.b Deliver kits to two campuses WIMXRG SPIRAL2
#439 GEC 8 Demo Request hdempsey@bbn.com major VMI-FED: S2.c GEC8 demo - VMI-FED SPIRAL2
#453 S3Monitor Demo at GEC8 hdempsey@bbn.com major S3MONITOR: S2.f Demonstration 2 S3MONITOR SPIRAL2
#634 OFSTAN: S2.d OpenFlow Integration Srini Seetharaman major OFSTAN: S2.d OpenFlow Integration OFSTAN SPIRAL2
#635 OFSTAN: S2.e Integration Testing Srini Seetharaman major OFSTAN: S2.e Integration Testing OFSTAN SPIRAL2
#492 Milestone DOME: S2.f completion blynn@cs.umass.edu major DOME: S2.f Import extended ORCA v2.2 DOME SPIRAL2
#648 ENTGENI: S2.c Provide training and documentation for E-GENI Srini Seetharaman major ENTGENI: S2.c Provide training and documentation for E-GENI OFSTAN SPIRAL2
#587 OFCLEM: S2.e Plan and engineer GEC 9 demo Kuang-Ching Wang major OFCLEM: S2.e Plan and engineer GEC 9 demo OFCLEM SPIRAL2
#588 OFCLEM: S2.f Upgrade small deployments to use OF 1.0 Kuang-Ching Wang major OFCLEM: S2.f Upgrade small deployments to use OF 1.0 OFCLEM SPIRAL2
#591 OFGT: S2.e Plan and engineer GEC 9 demo feamster@cc.gatech.edu major OFGT: S2.e Plan and engineer GEC 9 demo OFGT SPIRAL2
#594 OFIU: S2.e Plan and engineer GEC 9 demo chsmall@indiana.edu major OFIU: S2.e Plan and engineer GEC 9 demo OFIU SPIRAL2
#595 OFIU: S2.f Upgrade small deployments to use OF 1.0 chsmall@indiana.edu major OFIU: S2.f Upgrade small deployments to use OF 1.0 OFIU SPIRAL2
#621 OFNOX: S2.j Plan and engineer GEC 9 demo Josh Smift major OFNOX: S2.j Plan and engineer GEC 9 demo OFNOX SPIRAL2
#622 OFNOX: S2.k Support campuse upgrades to OF 1.0 and GENI API Josh Smift major OFNOX: S2.k Support campuse upgrades to OF 1.0 and GENI API OFNOX SPIRAL2
#598 OFPR: S2.e Plan and engineer GEC 9 demo scott@cs.princeton.edu major OFPR: S2.e Plan and engineer GEC 9 demo OFPR SPIRAL2
#602 OFRG: S2.e Plan and engineer GEC 9 demo Ivan Seskar major OFRG: S2.e Plan and engineer GEC 9 demo OFRG SPIRAL2
#603 OFRG: S2.f Upgrade small deployments to use OF 1.0 Ivan Seskar major OFRG: S2.f Upgrade small deployments to use OF 1.0 OFRG SPIRAL2
#606 OFUWA: S2.e Plan and engineer GEC 9 demo arvind@cs.washington.edu major OFUWA: S2.e Plan and engineer GEC 9 demo OFUWA SPIRAL2
#607 OFUWA: S2.f Upgrade small deployments to use OF 1.0 arvind@cs.washington.edu major OFUWA: S2.f Upgrade small deployments to use OF 1.0 OFUWA SPIRAL2
#611 OFUWI: S2.e Plan and engineer GEC 9 demo akella@cs.wisc.edu major OFUWI: S2.e Plan and engineer GEC 9 demo OFUWI SPIRAL2
#612 OFUWI: S2.f Upgrade small deployments to use OF 1.0 akella@cs.wisc.edu major OFUWI: S2.f Upgrade small deployments to use OF 1.0 OFUWI SPIRAL2
#495 S2.n POC to GENI response team hmussman@bbn.com minor ViSE: S2.n POC to GENI response team GPO SPIRAL2
#472 OKGEMS demo at GEC8 hdempsey@bbn.com major OKGEMS: S2.d Integrate field sensor nodes OKGEMS SPIRAL2
#498 Milestone S2.d Completion andyli major OKGEMS: S2.d Integrate field sensor nodes OKGEMS SPIRAL2
#525 OFGT: S2.f Upgrade small deployments to use OF 1.0 Heidi Dempsey major OFGT: S2.f Upgrade small deployments to use OF 1.0 OFGT SPIRAL2
#632 OFSTAN: S2.b Support campuses Srini Seetharaman major OFSTAN: S2.b Support campuses OFSTAN SPIRAL2
#541 ERM S2.d milestone report hmussman@bbn.com major ERM: S2.d Integrate UMF with BEN GPO SPIRAL2
#552 milestone S2.d hmussman@bbn.com major ERM: S2.d Integrate UMF with BEN GPO SPIRAL2
#542 ERM S2.e milestone report hmussman@bbn.com major ERM: S2.e Design and demo XML data exchange software modules GPO SPIRAL2
#553 Milestone S2.e hmussman@bbn.com major ERM: S2.e Design and demo XML data exchange software modules GPO SPIRAL2
#544 Milestone ERM S2.f hmussman@bbn.com major ERM: S2.f Plan to integrate UMF within anpther infrastructures GPO SPIRAL2
#554 milestone S2.f hmussman@bbn.com major ERM: S2.f Plan to integrate UMF within anpther infrastructures GPO SPIRAL2
#503 Milestone S2.h completion cecchet@cs.umass.edu major DICLOUD: S2.h Release initial proxy aggregate manager DICLOUD SPIRAL2
#513 Design Document released (13 Aug 2010) hdempsey@bbn.com major TIED: S2.d Preliminary design document for Unified/SFA (GENIAPI) plugin GPO SPIRAL2
#504 iGENI POC to GENI response team somebody major IGENI: S2.g POC to GENI response team IGENI SPIRAL2
#505 iGENI POC to GENI security team somebody major IGENI: S2.h POC to GENI security team IGENI SPIRAL2
#502 milestone S2.g completion hmussman@bbn.com major KANSEI: S2.g Import extended ORCA v2.1 GPO SPIRAL2
#515 Milestone IMF: S2.g completion Rudra Dutta major IMF: S2.g Protocol between SILO and IMF IMF SPIRAL2
#517 Milestone IMF: S2.h completion Rudra Dutta major IMF: S2.h Update the IMF software IMF SPIRAL2
#582 OFNLR: S2.d Engineer and test regional network connections benninger@psc.edu major OFNLR: S2.d Engineer and test regional network connections OFNLR SPIRAL2
#518 Milestone review completed hdempsey@bbn.com major TIED: S2.e review S2.f milestone and revise if necessary GPO SPIRAL2
#633 OFSTAN: S2.c Upgrade FlowVisor and Aggregate Manager Srini Seetharaman major OFSTAN: S2.c Upgrade FlowVisor and Aggregate Manager OFSTAN SPIRAL2
#540 Milestone S2.a completion korakis@poly.edu major WIMXNYUPT: S2.a Complete Installation WIMXNYUPT SPIRAL2
#412 Milestone S2.b completion Ivan Seskar major ORBIT: S2.b Extend OMF for experiments with multiple testbeds ORBIT SPIRAL1
#414 Milestone S2.d completion Ivan Seskar major ORBIT: S2.d Federate cluster testbeds ORBIT SPIRAL2
#417 Milestone S2.f completion Ivan Seskar major ORBIT: S2.f Support integration of latest OMF code into cluster testbeds ORBIT SPIRAL1
#297 Milestone S2.m completion hmussman@bbn.com major DOME: S2.m Contribution to GENI outreach DOME SPIRAL1
#531 Milestone S2.m completion blynn@cs.umass.edu major DOME: S2.m Contribution to GENI outreach DOME SPIRAL2
#536 Milestone S2.f completion Ilia Baldine major ORCABEN: S2.f GMOC access to clearinghouse GPO SPIRAL2
#538 Milestone S2.o completion Ilia Baldine major ORCABEN: S2.o Contribution to GENI outreach ORCABEN SPIRAL2
#545 Milestone S2.g completion max.ott@nicta.com.au major ORBIT: S2.g Demo experiments with multiple testbeds ORBIT SPIRAL2
#546 Milestone S2.l completion gruteser@winlab.rutgers.edu major ORBIT: S2.l Contribution to GENI outreach ORBIT SPIRAL2
#548 Milestone S2.a completion suman@cs.wisc.edu major WIMXUWI: S2.a Initial integration of static and mobile nodes in MadBed testbed with ORBIT WIMXUWI SPIRAL2
#402 OFI2: S2.a Complete initial deployment plan matt@internet2.edu major OFI2: S2.a Complete initial deployment plan OFI2 SPIRAL2
#627 OFI2: S2.d Complete draft plan for integrating initial deployment with ProtoGENI matt@internet2.edu major OFI2: S2.d Complete draft plan for integrating initial deployment with ProtoGENI OFI2 SPIRAL2
#556 Milestone S2.i completion cecchet@cs.umass.edu major DICLOUD: S2.i Extend ViSE web portal to include cloud DICLOUD SPIRAL2
#573 iGENI Contribution To GENI Outreach hmussman@bbn.com minor IGENI: S2.i Contribution to GENI outreach IGENI SPIRAL2
#509 Explore dynamic L1 connections hmussman@bbn.com major IGENI: S2.j Explore dynamic L1 connections GPO SPIRAL2
#646 ENTGENI: S2.a Continue to build E-GENI at Stanford Srini Seetharaman major ENTGENI: S2.a Continue to build E-GENI at Stanford OFSTAN SPIRAL2
#647 ENTGENI: S2.b Support use of E-GENI at Stanford Srini Seetharaman major ENTGENI: S2.b Support use of E-GENI at Stanford OFSTAN SPIRAL2
#636 OFSTAN: S2.f Coordinate Nicera Campus Support Srini Seetharaman major OFSTAN: S2.f Coordinate Nicera Campus Support OFSTAN SPIRAL2
#637 OFSTAN: S2.g improved NOX packaging Srini Seetharaman major OFSTAN: S2.g improved NOX packaging OFSTAN SPIRAL2
#638 OFSTAN: S2.h Support I2 and NLR Openflow Srini Seetharaman major OFSTAN: S2.h Support I2 and NLR Openflow OFSTAN SPIRAL2
#661 VMI-FED: S2.g analysis doc klnance@alaska.edu major VMI-FED: S2.g analysis doc GPO SPIRAL2
#653 Milestone S2.j completion cecchet@cs.umass.edu major DICLOUD: S2.j Make available initial set of resources DICLOUD SPIRAL2
#557 Milestone S2.k completion cecchet@cs.umass.edu major DICLOUD: S2.k POC to GENI response team DICLOUD SPIRAL2
#558 Milestone S2.l completion cecchet@cs.umass.edu major DICLOUD: S2.l POC to GENI security team DICLOUD SPIRAL2
#628 OFI2: S2.e Engineer and test regional network connections matt@internet2.edu major OFI2: S2.e Engineer and test regional network connections OFI2 SPIRAL2
#630 OFI2: S2.f Provide access to OpenFlow slivers for testing matt@internet2.edu major OFI2: S2.f Provide access to OpenFlow slivers for testing OFI2 SPIRAL2
#631 OFI2: S2.g Plan and engineer GEC 9 demo matt@internet2.edu major OFI2: S2.g Plan and engineer GEC 9 demo OFI2 SPIRAL2
#670 Milestone 3 completed Vic Thomas major Attrib: S2.c GPO SPIRAL2
#711 Milestone S3.b completion cecchet@cs.umass.edu major DICLOUD: S3.b Documentation and Code Release DICLOUD SPIRAL3
#567 VMI Functionality demo on cluster nodes hdempsey@bbn.com major VMI-FED: S2.f scale up demo - VMI-FED SPIRAL2
#775 S3.a Completeion blynn@cs.umass.edu major WIMXUMASS: S3.a Demonstration at GEC9 and Experimenter Outreach GPO SPIRAL3
#752 Request to close IMF S3.a milestone hmussman@bbn.com major IMF: S3.a Demonstration at GEC9 and Experimenter Outreach IMF SPIRAL3
#720 Milestone ViSE: S3.a Demonstration at GEC9 and Experimenter Outreach hmussman@bbn.com minor ViSE: S3.a Demonstration at GEC9 and Experimenter Outreach GPO SPIRAL3
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Note: See TracQuery for help on using queries.