Opened 14 years ago
Closed 14 years ago
#439 closed (fixed)
GEC 8 Demo Request
Reported by: | bhay.ak@gmail.com | Owned by: | hdempsey@bbn.com |
---|---|---|---|
Priority: | major | Milestone: | VMI-FED: S2.c GEC8 demo - |
Component: | VMI-FED | Version: | SPIRAL2 |
Keywords: | GEC8 | Cc: | |
Dependencies: |
Description
- Brief demo description (A few sentences suitable for a GEC8 attendee information page)
We will demonstrate the current Virtual Machine Introspection (VMI) functionality running against cluster nodes running on UA servers. This allows the state (e.g., network state, packet counts, running processes, memory usage, ...) of the virtual machines to be determined from the virtualization layer (i.e., without the need to install instrumentation tools on the virtual machine).
- List of equipment that will need AC connections (e.g. laptop, switch hardware prototype, monitor). (Just put in the number of connections needed if your demo description already lists the equipment)
3 computers, 1 network switch, 1 projector, 1 monitor.
- Number of wired network connections (include required bandwidth if significant)
3 wired network connections.
- Number of wireless network connections (include required bandwidth if significant)
0 wireless network connections
- Projector (y/n) Monitor (y/n, specify VGA or DVI) (Bring your own projectors if feasible)
1 Projector, and 1 monitor. I would prefer not to have to bring my own (i.e., to use equipment supplied by the demo site).
- Number of posters (poster boards are 20" x 30")
3 posters
- Number of static addresses needed (if any)
None
- Description of any special requests (e.g. VLANS to NLR or I2 backbone)
None
Change History (4)
comment:1 Changed 14 years ago by
Keywords: | GEC8 added |
---|---|
Owner: | changed from hdempsey@geni.net to hdempsey@bbn.com |
Status: | new → assigned |
comment:3 Changed 14 years ago by
Replying to hdempsey@bbn.com:
Are you bringing your own network switch?
Yes, I will bring my own switch for the demo.
comment:4 Changed 14 years ago by
Resolution: | → fixed |
---|---|
Status: | assigned → closed |
Space restrictions prevented us from including this project in GEC8 demo session.
Thanks for your request. We'll let you know when the resources are confirmed.