Version 110 (modified by 11 years ago) (diff) | ,
---|
Project Number
1764
Project Title
OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software
a.k.a. OnTimeMeasure
Technical Contacts
Principal Investigator Prasad Calyam, calyamp@missouri.edu
Co-PI Paul Schopis, pschopis@oar.net
POC for Response and Escalation Group:
Prasad Calyam
Phone: 573-882-9747
Email: calyamp@missouri.edu
Participating Organizations
University of Missouri-Columbia
Ohio Supercomputer Center/OARnet
GPO Liaison System Engineer
Vic Thomas vthomas@geni.net
Scope
This effort provides GENI with an on-demand measurement service used in forecasting, anomaly detection, and fault-location diagnosis in GENI experiments and GENI operations. The on-demand measurement service will be integrated into the ProtoGENI control framework and GENI operations (GMOC). The project will deploy a prototype measurement service to support operations and early experimenters use in the first year, and will revise the service in each development spiral to improve services and integration, based on GENI community feedback. The project will also analyze GENI privacy and security requirements for measured data, and prototype service to address appropriate requirements in each development spiral. The project will collaborate with related GENI measurement and security projects (e.g. University of Wisconsin's Instrumentation and Measurement for GENI) on a common GENI instrumentation and measurement architecture. The option years are for possible refinement and integration of OnTimeMeasure into the ProtoGENI control framework and tools.
Current Capabilities
OnTimeMeasure measurement service is now available to users of ProtoGENI/Emulab, and PlanetLab aggregates. Users can submit measurement requests, control the measurement service, and query measurement data within ProtoGENI and PlanetLab slices spanning geographically distributed sites within the GENI infrastructure.
For a quick overview, please refer to - Tutorial Slides and Tutorial Videos
To start using OnTimeMeasure, please first register at the researcher web-portal - http://ontime.oar.net. Upon registration, you will receive additional instructions.
For a hands-on, step-by-step tutorial, please refer to - Tutorial on OnTimeMeasure capabilities for Experimenters
OnTimeMeasure has also been integrated with other GENI projects:
OnTimeMeasure-ProtoGENI, OnTimeMeasure-PlanetLab - I&M service for GENI aggregate users
OnTimeMeasure-Gush - I&M service control through Experimenter workflow tool
OnTimeMeasure*-INSTOOLS - Both active* and passive measurements in experiment slice
OnTimeMeasure-CRON - I&M service for 10Gbps network path experiments
OnTimeMeasure-DOR - Persistent storage of measurement data in the GENI measurement archive
Wikis with integration details and added capabilities for Experimenters:
OnTimeMeasure-ProtoGENI
OnTimeMeasure-PlanetLab
OnTimeMeasure-Gush
OnTimeMeasure-CRON
OnTimeMeasure-InsTools
OnTimeMeasure-DOR
OnTime Control
OnTimeMeasure Custom Metric Integration
OnTimeMeasure-Windows
Milestones
Spiral 4
- MilestoneDate(OnTime: S4.a GENI Infrastructure Monitoring and OnTimeMeasure ehancements)?
- MilestoneDate(OnTime: S4.b GENI infrastructure measurements)?
- MilestoneDate(OnTime: S4.c GENI infrastructure measurements including non-IP traffic)?
- MilestoneDate(OnTime: S4.d GENI infrastructure measurements: Design updates)?
Project Technical Documents
Documents:
- Berryman, P. Calyam, J. Cecil, G. Adams, D. Comer, GREE13 Paper on OnTimeMeasure Integration in Advanced Manufacturing Experiments in GENI Infrastructure, March 2013.
- Calyam, A. Venkataraman, A. Berryman, M. Faerman, GREE12 Paper on OnTimeMeasure Integration in Virtual Desktop Cloud GENI Experiment, March 2012.
- Calyam, M. Sridharan, Y. Xu, K. Zhu, A. Berryman, R. Patali, JCN11 Paper on OnTimeMeasure Integration in Virtual Desktop Cloud GENI Experiment, May 2011.
- Calyam, W. Mandrawa, C. Hartley, P. Schopis, High-level Design Document of “OnTimeMeasure: Centralized and Distributed Measurement Software”, December 2009.
- Calyam, “Use-cases for GENI Instrumentation and Measurement Architecture Design”, June 2010.
- Calyam, K. Zhu, “OnTimeMeasure Installation Procedure on ProtoGENI”, July 2010.
- Calyam, K. Zhu, “OnTimeMeasure Project Experiences with using ProtoGENI in Spiral 2”, August 2010.
- Calyam, R. Patali, K. Zhu, “OnTimeMeasure Installation Procedure on PlanetLab”, August 2010.
- Calyam, R. Patali, “OnTimeMeasure Early Integration Efforts with Instrumentation Tools”, August 2010.
- Calyam, K. Zhu, “OnTimeMeasure Early Integration Efforts with CRON 10Gbps Testbed”, November 2010.
- Calyam, A. Berryman, K. Zhu, “OnTimeMeasure Integration Efforts with Gush Experimenter Workflow Tool”, January 2011.
- Calyam, Y. Xu, “OnTimeMeasure Integration Efforts with Digital Object Repository”, June 2011.
Posters:
GEC15 Demo Poster
GEC14 Demo Poster
GEC13 Demo Poster
GEC12 Demo Poster
GEC11 Demo Poster
GEC10 Demo Poster
GEC8 Demo Poster
GEC7 Demo Poster
Talks:
- Calyam, Leveraging OpenFlow for Resource Placement of Virtual Desktops, GEC15 Plenary Talk/Demo, March 2013.
- Calyam, Software-defined Networking Capabilities, Needs in GENI for VMLab , GEC15 Programmable Networks and GENI Session, March 2013.
- Calyam, OnTimeMeasure Status Update, GEC14 I&M and Monitoring Session, July 2012.
- Calyam, OnTimeMeasure Status Update, GEC13 I&M Working Session, March 2012.
- Welling, P. Calyam, Design of OnTimeMeasure integration with Flack, ProtoGENI Cluster Call, February 2012.
- Calyam, “OnTimeMeasure Status Update”, GEC12 I&M Working Session, November 2011.
- Calyam, “OnTimeMeasure Status Update”, GEC11 I&M Working Session, July 2011.
- Calyam, “OnTimeMeasure Hands-on Tutorial”, GEC10 Experimenter Track, March 2011.
- Calyam, “OnTimeMeasure-Gush Integration Design and User Workflow”, Presentation at the Selected Project Highlights, GEC10, March 2011.
- Calyam, “OnTimeMeasure User Tutorial”, Presentation at the 3rd GENI I&M Workshop, GEC9, November 2010.
S-J. Park, P. Calyam, “Federating CRON with OnTimeMeasure”, Presentation at the COMIS Working Group, GEC9, November 2010.
- Calyam, “OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software”, Status Report at Cluster C Breakout Session at GEC9, November 2010.
- Calyam, “OnTimeMeasure Spiral 2 Project Review”, Presentation at the GENI I&M-2 Project Reviews Call, August 2010.
- Calyam, “OnTimeMeasure Tutorial for Early Experimenters”, Presentation at the Cluster C Call, June 2010.
- Calyam, and W. Mandrawa, “ProtoGENI User Feedback - OnTimeMeasure Project Experiences”, GENI Engineering Conference 7 Cluster C Session, Durham, March 2010.
- Calyam, “How should an active measurement service operate within an experimenter's slice (encompassing Internet2 backbone resources) in the GENI facility?”, Winter ESCC/Internet2 Joint Techs Conference, Salt Lake City, February 2010.
- Calyam, “OnTimeMeasure Software High Level Design”, Presentation at the Cluster C Call, January 2010.
- Calyam, “OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software”, Short presentation at Instrumentation and Measurement Working Group meeting at GEC6, November 2009.
- Calyam, “OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software”, Short presentation at Cluster C Breakout Session at GEC6, November 2009.
Quarterly Status Reports
July 2012 report
March 2012 report
November 2011 report
July 2011 report
March 2011 report
November 2010 report
June 2010 report
March 2010 report
December 2009 report
Spiral 2 Connectivity
Related Projects
ProtoGENI
GMOC
Instrumentation Tools
Measurement System
LAMP
Scalable Monitoring
NetKarma
Data Plane Measurements
GUSH
CRON
DOR
Attachments (23)
-
ProtoGENI_UserFeedback_031710.pdf (48.6 KB) - added by 15 years ago.
ProtoGENI User Feedback (OnTimeMeasure Project Experiences)
-
GEC7-OnTimeMeasureGENI-Poster.pdf (2.4 MB) - added by 15 years ago.
GEC7 Demo Poster
-
GIMA_Design_UseCases.pdf (60.4 KB) - added by 15 years ago.
Use-cases for GENI Instrumentation and Measurement Architecture Design (Draft for Discussion)
-
OnTimeMeasureLogo.jpg (35.6 KB) - added by 15 years ago.
OnTimeMeasure Logo
-
GEC8-OnTimeMeasureGENI-Poster.pdf (998.1 KB) - added by 14 years ago.
GEC8 Demo Poster
-
OnTimeMeasure_Spiral2_ProjectReview.pdf (157.7 KB) - added by 14 years ago.
OnTimeMeasure Spiral 2 Project Review Slides
-
CRON-OnTimeMeasure-GEC9-COMIS.pdf (587.4 KB) - added by 14 years ago.
OnTimeMeasure and CRON 10G Testbed Integration
-
OnTimeMeasure_ClusterC_110210.pdf (1.2 MB) - added by 14 years ago.
GEC9 Cluster C OnTimeMeasure Status Report
-
OnTimeMeasure-GENI_HLD_Dec09.pdf (499.6 KB) - added by 14 years ago.
High-level Design Document of OnTimeMeasure: Centralized and Distributed Measurement Software (Revised March 2011)
-
OnTimeMeasure_Tutorial.pdf (1.9 MB) - added by 14 years ago.
OnTimeMeasure User Tutorial
-
OnTimeMeasure-GUSH-Integration_012111.pptx (403.9 KB) - added by 14 years ago.
Gush integration (design)
-
OnTimeMeasure-GUSH-Integration_012111.2.pptx (403.9 KB) - added by 14 years ago.
Gush integration (design)
-
OnTimeMeasure-GUSH-Integration_012111.3.pptx (403.9 KB) - added by 14 years ago.
Gush integration (design)
-
OnTimeMeasure_GEC11-Poster.pdf (624.8 KB) - added by 13 years ago.
GEC11 Demo Poster
-
OnTimeMeasure_GEC12-Poster.pdf (644.2 KB) - added by 13 years ago.
GEC12 Demo Poster
-
OnTimeMeasure-VDCloud.pdf (1.7 MB) - added by 13 years ago.
Paper on OnTimeMeasure Framework, and Integration in Virtual Desktop Cloud GENI Experiment
-
OnTimeMeasure_GEC13-Poster.pptx (2.1 MB) - added by 13 years ago.
GEC13 Demo Poster
-
OTM-Flack-Design_022212.pdf (1.0 MB) - added by 13 years ago.
OnTimeMeasure Integration with Flack Design
-
VDC-GENI-Expt-GEC13.pdf (1.0 MB) - added by 13 years ago.
GREE12 Paper on Virtual Desktop Cloud Experiments in GENI
-
lamp_perfsonar_osu-experiments-013112.pdf (126.9 KB) - added by 13 years ago.
Experiments with LAMP for Deployment of Infrastructure Measurement Slices
-
OnTimeMeasure_GEC14-Poster.pptx (2.1 MB) - added by 12 years ago.
GEC14 Demo Poster
-
adv-manufacturing-gree13.pdf (1.1 MB) - added by 11 years ago.
GREE13 Paper on Advanced Manufacturing Experiments in GENI with OnTimeMeasure
-
OnTimeMeasure_GEC15-Poster.pptx (4.6 MB) - added by 11 years ago.
GEC15 Poster - OnTimeMeasure and VMLab Integration