Spiral 2 GENI Integration Release

During Spiral 2, several projects completed software and added resources to the GENI network, as reflected in their Spiral 2 project milestones. The GPO reviewed, used, and tested these deliverables, as shown in this table. The results are listed by test priority in each cluster. Test priority was based on how widely deployed the software and resources under consideration are, and whether significant other testing has already been done. (For example, all PlanetLab software is tested in the field by Princeton before release.) Any Test status other than "DONE" means that testing was not completed by the end of Spiral 2. Those projects were moved to the candidate release list for Spiral 3 (GENI Integration Release 3.1 or 3.2).

This page captures the state of GENI Integration Release 2.1 at the end of Spiral 2 (September 2010). Click on a project in the "Evaluation Details" column for detailed integration information. You will find information about locating the resource, locating, downloading, and installing any software packages that can be run in a typical lab environment (e.g. virtual machines on an ethernet connected to GENI). You will also find documentation on any issues reported during testing, an in some cases actions taken by the project teams to address those issues.

Projects tested in the GPO lab.

High Test PriorityTest StatusEvaluation DetailsIn GIR?
GUSHDONEGIR2.1_GushProto YES
INSTOOLSDONEGIR2.1_INSTOOLS YES
PGToolsDONEGIR2.1_PGTools YES
PlanetLabDONEGIR2.1_PLC_SFA YES
MillionNodeGENIDONEGIR2.1_MillionNodeGENI YES
BGPMuxMostly DoneGIR2.1_BGPMux YES
ProgrammableEdgeNodeIn ProgressGIR2.1_ProgrammableEdgeNodeNO
ProtoGENIIn ProgressGIR2.1_ProtoGENINO
CMULABLate MilestonesGIR2.1_CMULABNO
Medium Test Priority
SecureUpdatesDONEGIR2.1_SecureUpdates YES
OnTimeMeasureDONEGIR2.1_OnTimeMeasurements YES
Provisiong ServiceDONEGIR2.1_ProvisioningService YES
ScalableMonitoring Partially AvailableGIR2.1_ScalableMonitoring NO
SCAFFOLDnonenone NO
CRONnonenone NO
LAMPnonenone NO
Low Test Priority
NetKarmaMostly DoneGIR2.1_NetKarma YES
WMI-FEDnonenoneNO
PrimoGENInonenoneNO

Projects requiring field tests

High PriorityTest StatusEvaluation DetailsIn GIR?
Internet Scale Overlay Hosting Not available GIR2.1_InternetScaleOverlayHostingNO
Medium Priority
GpENI DONE GIR2.1_GpENINO
Mid-Atlantic CrossroadsnonenoneNO

Priority Legend: High Priority = must; Medium Priority = may; Low Priority = time permitting

Additional Projects

Various tools were reviewed even though they were not part of the original GIR project list.

ProjectTest StatusEvaluation DetailsIn GIR?
GCF DONEGIR2.1_GCFToolsN/A
Open Flow DONE GIR2.1_GPO_DemosN/A
VISE In Progress GIR2.1_VISEN/A
TIED In Progress GIR2.1_TIED N/A