Version 3 (modified by 11 years ago) (diff) | ,
---|
EG-EXP-7: Click Router Experiment Acceptance Test
This page captures status for the test case EG-EXP-2, which verifies a click router scenario between two racks. For overall status see the InstaGENI Acceptance Test Status page.
Test Status
This section captures the status for each step in the acceptance test plan.
Step | State | Date completed | Ticket | Comments |
Step 1 | Color(orange,Blocked)? | BBN rack is not yet available | ||
Step 2 | ||||
Step 3 | ||||
Step 4 | ||||
Step 5 | ||||
Step 6 | ||||
Step 7 | ||||
Step 8 | ||||
Step 9 | ||||
Step 10 | ||||
Step 11 | ||||
Step 12 | ||||
Step 13 | ||||
Step 14 | ||||
Step 15 | ||||
Step 16 |
State Legend | Description |
Color(green,Pass)? | Test completed and met all criteria |
Color(#98FB98,Pass: most criteria)? | Test completed and met most criteria. Exceptions documented |
Color(red,Fail)? | Test completed and failed to meet criteria. |
Color(yellow,Complete)? | Test completed but will require re-execution due to expected changes |
Color(orange,Blocked)? | Blocked by ticketed issue(s). |
Color(#63B8FF,In Progress)? | Currently under test. |
Test Plan Steps
- As Experimenter1, request ListResources from BBN InstaGENI, and Utah InstaGENI.
- Review ListResources output from both rack AMs.
- Define a request RSpec for three VMs at the BBN InstaGENI.
- Define a request RSpec for three VMs at the Utah InstaGENI.
- Create the first slice.
- Create a sliver in the first slice at each AM, using the RSpecs defined above.
- Download the Click Router software on the 4 nodes that will be routers in the experiment.
- Build the user-level Click program in the 'userlevel' directory on each of the 4 router nodes.
- Determine the interface to MAC address mapping, and various settings required for the 4 router node and modify click configuration.
- Run the user-level Click router by providing the configuration file name as an argument on each node.
- Log in to Host1 and send traffic to host2, leave traffic running.
- Review Click logs on each Click router.
- Stop traffic on Host2.
- Log in to Host1 and send traffic to host2, leave traffic running.
- Review Click logs on each Click router.
- Stop traffic on Host2.
- Delete sliver.
Attachments (7)
- myslice.jpg (209.9 KB) - added by 10 years ago.
- IG-EXP-7-gpo.jpg (44.0 KB) - added by 10 years ago.
- IG-EXP-7.jpg (82.1 KB) - added by 10 years ago.
- myslice2.jpg (195.6 KB) - added by 10 years ago.
- combined-manifest.xml (13.2 KB) - added by 10 years ago.
- IG-EXP-7-manifest-rspec-instageni-gpolab-bbn-com-protogeniv2.xml (10.7 KB) - added by 10 years ago.
- IG-EXP-7-manifest-rspec-utah-geniracks-net-protogeniv2.xml (10.4 KB) - added by 10 years ago.
Download all attachments as: .zip