#1146 |
Access to WiMAX Developer pages
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL6
|
#1246 |
request for GENI-VIRO demo at GEC20
|
Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.)
|
major
|
|
GPO
|
SPIRAL6
|
#1251 |
pyOpenSSL requirement?
|
somebody
|
major
|
|
GPO
|
SPIRAL6
|
#1275 |
Sliver operations do not generate OESS circuit notification for longer project name
|
luke@grnoc.iu.edu
|
major
|
|
STITCHING
|
SPIRAL6
|
#1041 |
Shutdown of stitched slice fails with non existing record at I2 aggregate
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL5
|
#1050 |
SCS request RSpec option not implemented.
|
xyang@maxgigapop.net
|
major
|
|
STITCHING
|
SPIRAL5
|
#1059 |
No VLANs available on link (PCE_CREATE_FAILED)
|
xyang@maxgigapop.net
|
major
|
|
I2AM
|
SPIRAL5
|
#1102 |
test request
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL5
|
#1106 |
Users with an Upper case letter in their username get an error
|
hdempsey@bbn.com
|
major
|
|
I2AM
|
SPIRAL5
|
#846 |
Plan for GEC13 demos
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#890 |
Spiral 4 milestones to be imported into the wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#902 |
Plan for GEC 14 demos
|
agosain@bbn.com
|
major
|
|
GPO
|
SPIRAL4
|
#683 |
Create mailing list: genicloud-users@geni.net
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#764 |
Confirm expiration of all Plastic Slices MyPLC slivers
|
somebody
|
major
|
|
GPO
|
SPIRAL3
|
#767 |
Collect campus-wide measurements and generate coverage map
|
caleb.phillips@colorado.edu
|
major
|
WIMXUCO: S3.e Demonstration at GEC11 and Experimenter Outreach
|
GPO
|
SPIRAL3
|
#768 |
Verify client connectivity and perform proof-of-concept throughput tests
|
caleb.phillips@colorado.edu
|
major
|
WIMXUCO: S3.e Demonstration at GEC11 and Experimenter Outreach
|
GPO
|
SPIRAL3
|
#769 |
Update ASN-Gateway software to latest
|
caleb.phillips@colorado.edu
|
major
|
WIMXUCO: S3.e Demonstration at GEC11 and Experimenter Outreach
|
GPO
|
SPIRAL3
|
#770 |
New git repository for nox controllers
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#785 |
Plan for GEC12 demos
|
hdempsey@bbn.com
|
major
|
|
GPO
|
SPIRAL3
|
#836 |
Milestone "lanetlab S2.e GEC8 demo" shows up in milestone pulldown list on public wiki and shouldn't
|
chaos@bbn.com
|
minor
|
lanetLab: S2.e GEC8 demo
|
GPO
|
SPIRAL3
|
#222 |
New Milestone macro for trac wiki
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#229 |
Create mailing list for new Instrumentation and Measurement Working Group
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#231 |
batch entry of milestones into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#244 |
log wg mail list passwords
|
somebody
|
major
|
|
GPO
|
SPIRAL2
|
#255 |
NetKarma White Paper
|
chris@bbn.com
|
major
|
|
NETKARMA
|
SPIRAL2
|
#256 |
PlanetLab cluster mailing list on lists.geni.net
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#258 |
Ops transition requires better ProtoGENI integration
|
valas@gatech.edu
|
major
|
|
BGPMUX
|
SPIRAL2
|
#262 |
Milestone S2.b completion
|
hmussman@bbn.com
|
major
|
|
VISE
|
SPIRAL2
|
#268 |
Milestone S2.b completion
|
somebody
|
major
|
|
LEARN
|
SPIRAL2
|
#278 |
Gather ViSE release v1.x software
|
hmussman@bbn.com
|
major
|
ViSE: S2.c Deliver first release of ViSE software
|
VISE
|
SPIRAL2
|
#497 |
Need mailing list for gush-users.
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL2
|
#559 |
Please create GEC9 report link for Ticket Reports section on public geni wiki and remove GEC8 link
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL2
|
#579 |
login account needed on 192.168.1.10
|
somebody
|
major
|
|
GPO
|
SPIRAL2
|
#623 |
OFNOX: S2.l Improve system and regression test support
|
Josh Smift
|
major
|
OFNOX: S2.l Improve system and regression test support
|
OFNOX
|
SPIRAL2
|
#624 |
OFNOX: S2.m Publish feature list for 2011 releases
|
Josh Smift
|
major
|
OFNOX: S2.m Publish feature list for 2011 releases
|
OFNOX
|
SPIRAL2
|
#14 |
unable to associate milestone with ticket
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#27 |
Open SECARCH ticket doesn't show up under SECARCH milestone in Roadmap.
|
chaos@bbn.com
|
minor
|
|
GPO
|
SPIRAL1
|
#78 |
Temporary tunnels in use for CMU lab
|
hdempsey@bbn.com
|
major
|
CMU Lab: Get CMU ProtoGENI node on I2 VLAN
|
GPO
|
SPIRAL1
|
#81 |
Update CMU Milestone #1
|
hdempsey@bbn.com
|
major
|
CMU Lab: desired node config & boot mgmt functionality
|
GPO
|
SPIRAL1
|
#83 |
Status of ticket
|
hdempsey@bbn.com
|
major
|
CMU Lab: Tunneling packets from Utah to CMU
|
GPO
|
SPIRAL1
|
#84 |
Duplicate task?
|
hdempsey@bbn.com
|
major
|
CMU Lab: IP-in-IP encap from CMU-Control to Homenet nodes
|
GPO
|
SPIRAL1
|
#104 |
milestone 1d completion
|
hmussman@bbn.com
|
major
|
|
VISE
|
SPIRAL1
|
#119 |
milestone 1c2 completion
|
hmussman@bbn.com
|
major
|
|
KANSEI
|
SPIRAL1
|
#121 |
milestone 1d2 completion
|
anish@cse.ohio-state.edu
|
major
|
|
KANSEI
|
SPIRAL1
|
#152 |
1outreach activites
|
David Irwin
|
major
|
|
VISE
|
SPIRAL1
|
#193 |
MAX connection over I2 to ProtoGENI
|
chris@maxgigapop.net
|
major
|
|
MAX
|
SPIRAL1
|
#202 |
No carrier on ProtoGENI HP switch port A19 at I2 SALT
|
chsmall@indiana.edu
|
major
|
|
PROTOGENI
|
SPIRAL1
|
#230 |
difficulty entering text into wiki
|
chaos@bbn.com
|
major
|
|
GPO
|
SPIRAL1
|
#261 |
Milestone S2.a completion
|
hmussman@bbn.com
|
major
|
|
VISE
|
SPIRAL1
|
#274 |
SPP GPE Board failure at Washington DC Pop
|
Vic Thomas
|
major
|
|
SPP
|
SPIRAL1
|
#293 |
Milestone S2.m completion
|
David Irwin
|
major
|
|
VISE
|
SPIRAL1
|
#298 |
Milestone S2.j completion
|
hmussman@bbn.com
|
major
|
|
DOME
|
SPIRAL1
|
#1361 |
To demonstrate a virtual reality surgical application being remotely operated with the aid of a redundancy server.
|
bhararm@ostatemail.okstate.edu
|
major
|
|
GPO
|
SPIRAL7
|
#1363 |
Demonstration of a GENI based cyber physical test bed for advanced manufacturing test bed
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1365 |
A cyber physical test bed for advanced manufacturing
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1412 |
Test ticket -- please ignore
|
tupty@geni.net
|
major
|
|
GPO
|
SPIRAL7
|
#1429 |
Tele-microscopy for Education
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1433 |
Entrypoint Solutions
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1438 |
ARCCN: Key Research Findings
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1447 |
The Gigabots
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1461 |
SDN-based Flow Scheduling in Heterogeneous Wireless Networks
|
peter.stickney@bbn.com
|
major
|
|
GPO
|
SPIRAL7
|
#1493 |
A cyber physical test bed for advanced manufacturing
|
somebody
|
major
|
|
GPO
|
SPIRAL7
|