Opened 10 years ago

Closed 10 years ago

#1363 closed (invalid)

Demonstration of a GENI based cyber physical test bed for advanced manufacturing test bed

Reported by: yajun.lu@okstate.edu Owned by: peter.stickney@bbn.com
Priority: major Milestone:
Component: GPO Version: SPIRAL7
Keywords: GEC22 Cc: j.cecil@okstate.edu, parmesh@ece.wisc.edu, aprakash6@wisc.edu
Dependencies:

Description

Demo Title: Demonstration of a GENI based cyber physical test bed for advanced manufacturing test bed

Demo description paragraph(s): This demonstration will be a milestone in the area of Digital Manufacturing and involves showcasing a GENI based cyber physical framework for advanced manufacturing. This Next Internet based framework will enable globally distributed software and manufacturing resources to be accessed from different locations accomplish a complex set of life cycle activities including design analysis, assembly planning, and simulation (fig 3). The advent of the Next Internet holds the promise of ushering in a new era in Information Centric engineering and digital manufacturing activities. The focus will be on the emerging domain of micro devices assembly, which involves the assembly of micron sized parts using automated micro assembly work cells.

Figure 2: A GENI based cyber physical test bed for advanced manufacturing Figure 3: A Virtual Reality based assembly planning simulator used in the cyber physical test bed

List of equipment that will need AC connections (e.g. laptop, switch, monitor): 5 - 7

Total number of wired network connections (sum standard IP and VLAN connections): 4

Number of static addresses needed (if any): 4

Monitor (y/n, specify VGA or DVI): both

Number of posters (max size poster boards are 30" x 40"): 1 standard size

Attachments (2)

Figure2.png (179.4 KB) - added by yajun.lu@okstate.edu 10 years ago.
Figure3.png (79.7 KB) - added by yajun.lu@okstate.edu 10 years ago.

Download all attachments as: .zip

Change History (3)

Changed 10 years ago by yajun.lu@okstate.edu

Attachment: Figure2.png added

Changed 10 years ago by yajun.lu@okstate.edu

Attachment: Figure3.png added

comment:1 Changed 10 years ago by yajun.lu@okstate.edu

Resolution: invalid
Status: newclosed
Note: See TracTickets for help on using tickets.