{6} All Tickets By Milestone (Including closed) (1502 matches)
A more complex example to show how to make advanced reports.
Results (201 - 300 of 1502)
(empty) (100 matches)
Ticket | Summary | Component | Status | Resolution | Version | Type | Priority | Owner | Modified |
---|---|---|---|---|---|---|---|---|---|
#1339 | SDX Poster | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 10/28/14 | |
#1214 | SDX on GENI | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1168 | SDX-iGENI: Software Define Network Exchange for international GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1328 | SDX for GENI | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 10/28/14 | |
#1395 | SDN Router Security in GENI (demo) | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 04/27/15 | |
#1006 | SDN in public safety | GPO | closed | fixed | SPIRAL5 | task | major | peter.stickney@bbn.com | 03/20/13 |
#1479 | SDN-Enabled Highly Resilient and Efficient Microgrids | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 06/18/15 | |
#1472 | SDN-based Transparent Handover Scheme in Heterogeneous Wireless Networks | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 06/18/15 | |
#1461 | SDN-based Flow Scheduling in Heterogeneous Wireless Networks | GPO | closed | invalid | SPIRAL7 | major | peter.stickney@bbn.com | 05/18/15 | |
#1352 | SCS thinks link type vlan is not stitching | MAXSCS | closed | fixed | SPIRAL7 | major | xyang@maxgigapop.net | 10/21/14 | |
#1033 | SCS should implement Getversion | MAXSCS | assigned | SPIRAL5 | task | minor | xyang@maxgigapop.net | 06/24/13 | |
#1259 | SCS should detect bad Ads and skip them | MAXSCS | new | SPIRAL6 | major | xyang@maxgigapop.net | 06/05/14 | ||
#1016 | SCS returns malformed VLAN range | MAXSCS | closed | fixed | SPIRAL5 | defect | major | xyang@maxgigapop.net | 05/02/13 |
#1050 | SCS request RSpec option not implemented. | STITCHING | closed | invalid | SPIRAL5 | defect | major | xyang@maxgigapop.net | 06/11/13 |
#1099 | SCS puts wrong suggested tag on one ION hop | MAXSCS | closed | fixed | SPIRAL5 | defect | major | Aaron Helsinger | 09/05/13 |
#1100 | SCS picked same tag for 2 paths through same interface | MAXSCS | closed | fixed | SPIRAL5 | defect | major | Aaron Helsinger | 09/09/13 |
#1497 | SCS page for Delegated GENI Stitching VLANs is no longer available | GPO | closed | fixed | SPIRAL8 | major | xyang@maxgigapop.net | 02/04/16 | |
#1456 | SCS mxtce daemon memory leak | STITCHING | accepted | SPIRAL7 | major | xyang@maxgigapop.net | 06/29/15 | ||
#1034 | SCS must handle 2 URLs in Ad RSpec | MAXSCS | closed | fixed | SPIRAL5 | task | major | xyang@maxgigapop.net | 06/03/13 |
#1405 | SCS is ignoring link type egre | STITCHING | reopened | SPIRAL7 | critical | xyang@maxgigapop.net | 12/10/15 | ||
#1349 | SCS ignores excludeHops on one path when there are multiple paths | STITCHING | closed | fixed | SPIRAL7 | major | xyang@maxgigapop.net | 12/01/14 | |
#1042 | SCS hops from ION use v2 schema | MAXSCS | closed | fixed | SPIRAL5 | defect | major | xyang@maxgigapop.net | 06/06/13 |
#1355 | SCS hang with timed out threads when a request is submitted with large number of nodes | STITCHING | accepted | SPIRAL7 | major | xyang@maxgigapop.net | 12/12/14 | ||
#1163 | SCS exception for lines topology | STITCHING | new | SPIRAL6 | defect | major | xyang@maxgigapop.net | 01/31/14 | |
#1357 | SCS does not suggest the same VLAN tag for cross-connect hops that connect AL2S to ION | STITCHING | accepted | SPIRAL7 | major | xyang@maxgigapop.net | 01/20/15 | ||
#1458 | SCS does fails when some special characters are used | GPO | new | SPIRAL7 | minor | somebody | 04/06/15 | ||
#1354 | SCS checks for capacity return the same error as unknown paths. | STITCHING | new | SPIRAL7 | major | xyang@maxgigapop.net | 11/13/14 | ||
#1351 | SCS: 2 hop path has no dependencies | STITCHING | closed | fixed | SPIRAL7 | major | xyang@maxgigapop.net | 10/21/14 | |
#1261 | SciWiNet demo | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1312 | Science Shakedown / ExoGENI Demo Request GEC21 | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 10/28/14 | |
#684 | Scheduled reboot of I2 of.atla OpenFlow core switch | GPO | closed | fixed | SPIRAL3 | task | major | jwilliams@bbn.com | 01/11/11 |
#751 | Scheduled outage of BBN's ION circuits 5AM EST on 03-08-2011 | GPO | closed | fixed | SPIRAL3 | task | major | jwilliams@bbn.com | 03/11/11 |
#748 | scheduled OpenFlow Core re-configuration (potential outage) 2.15.2011 | GPO | closed | fixed | SPIRAL3 | task | major | jwilliams@bbn.com | 02/18/11 |
#705 | scheduled OpenFlow Core outage 2.9.211 | GPO | closed | fixed | SPIRAL3 | task | major | jwilliams@bbn.com | 02/09/11 |
#696 | scheduled ION outage in Internet2 2/10.211 | GPO | closed | fixed | SPIRAL3 | task | major | hdempsey@bbn.com | 02/15/11 |
#1337 | Scale up your experiment by international federation | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 10/28/14 | |
#656 | SCAFFOLD demo request for GEC9 | SCAFFOLD | closed | fixed | SPIRAL2 | task | major | hdempsey@bbn.com | 11/15/10 |
#688 | satisfied late deliverable NETKARMA: S2.h prototype | GPO | closed | fixed | SPIRAL2 | task | major | Vic Thomas | 01/28/11 |
#687 | satisfied late deliverable NETKARMA: S2.g user doc | GPO | closed | fixed | SPIRAL2 | task | major | Vic Thomas | 01/28/11 |
#686 | satisfied late deliverable NETKARMA: S2.f experience report | GPO | closed | fixed | SPIRAL2 | task | major | Vic Thomas | 01/28/11 |
#1451 | Safe Community Awareness and Alerting (SCALE2) | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 04/27/15 | |
#724 | S3Monitor Demonstration | S3MONITOR | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#660 | S3Monitor Demo at GEC9 | S3MONITOR | closed | fixed | SPIRAL2 | task | major | hdempsey@bbn.com | 11/15/10 |
#496 | S2.o POC to GENI Security Team | GPO | closed | fixed | SPIRAL2 | task | major | hmussman@bbn.com | 05/06/13 |
#350 | Rutgers OpenFlow demo | OFRG | closed | fixed | SPIRAL2 | task | major | NIDHI | 03/24/10 |
#756 | Rutgers and BBN Internet2 OpenFlow Core scheduled outage | GPO | closed | fixed | SPIRAL3 | task | major | jwilliams@bbn.com | 03/23/11 |
#916 | Running Opportunistic Mobile Wireless Network Experiments on ORBIT | OPPWIRELESS | closed | fixed | SPIRAL4 | task | major | agosain@bbn.com | 07/10/12 |
#884 | Resource allocation demonstration | GPO | closed | fixed | SPIRAL4 | task | major | agosain@bbn.com | 03/14/12 |
#1491 | Resilience of KanREN OpenFlow network to large-scale disasters | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 06/18/15 | |
#1025 | Require some form of authentication? | MAXSCS | assigned | SPIRAL5 | task | major | xyang@maxgigapop.net | 05/02/13 | |
#134 | Requirement for KanseiGenie demo at GEC 5 | KANSEI | closed | fixed | SPIRAL1 | task | major | hdempsey@bbn.com | 10/18/09 |
#1048 | Requesting link below minimumReservableCapacity does not generate error and allocates default | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 06/10/13 | |
#483 | Request for sudo access on Salamis | GPO | closed | wontfix | SPIRAL2 | task | major | somebody | 07/01/10 |
#1194 | Request for GIMI demo at GEC | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1404 | Request for GENI-VIRO demo at GEC22 (Re: request #1403) | GPO | closed | duplicate | SPIRAL7 | major | peter.stickney@bbn.com | 02/02/15 | |
#1403 | request for GENI-VIRO demo at GEC22 | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 04/27/15 | |
#1248 | request for GENI-VIRO demo at GEC20 | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1247 | request for GENI-VIRO demo at GEC20 | GPO | closed | duplicate | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1246 | request for GENI-VIRO demo at GEC20 | GPO | closed | invalid | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#719 | Request for GEC10 DEMO/POSTER: Flexible OpenFlow 1.1 switch over Network Processors | GPO | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#1153 | Request for 3 node linear stitched sliver results in "no edge hop" error at Utah IG | STITCHING | closed | fixed | SPIRAL6 | defect | major | somebody | 11/20/13 |
#1207 | Repeated AddPersonToSite errors | I2AM | new | SPIRAL6 | defect | major | xyang@maxgigapop.net | 05/21/14 | |
#1159 | Renewing stitched sliver with ION in path may result in OSCARS path modificaiton failure | STITCHING | closed | fixed | SPIRAL6 | defect | major | xyang@maxgigapop.net | 02/12/14 |
#1078 | Remote Training of Surgeons using Virtual Reality | GENICLOUD | closed | fixed | SPIRAL5 | task | major | peter.stickney@bbn.com | 07/22/13 |
#1237 | Reliable Communications Protocol for Advanced Manufacturing | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#898 | Release gcf-1.6.2 | GPO | closed | wontfix | SPIRAL4 | task | major | lnevers@bbn.com | 05/07/12 |
#644 | Redundancy Elimination on Network Elements | GPO | closed | fixed | SPIRAL2 | task | major | hdempsey@bbn.com | 10/13/10 |
#1489 | Recursive copy of wiki pages. | GPO | new | SPIRAL7 | major | somebody | 05/21/15 | ||
#577 | Raven GEC9 demo | RAVEN | closed | fixed | SPIRAL2 | task | major | hdempsey@bbn.com | 02/03/11 |
#468 | Raven GEC8 demo | RAVEN | closed | wontfix | SPIRAL2 | task | major | hdempsey@bbn.com | 02/03/11 |
#225 | Raven GEC6 demo | RAVEN | closed | fixed | SPIRAL1 | task | major | NIDHI | 02/03/11 |
#156 | Raven GEC5 demo requirements | RAVEN | closed | fixed | SPIRAL1 | task | major | hdempsey@bbn.com | 02/03/11 |
#42 | Raven demo at GEC4 | RAVEN | closed | fixed | SPIRAL1 | task | major | hdempsey@bbn.com | 02/03/11 |
#332 | Raven demo | RAVEN | closed | fixed | SPIRAL1 | task | major | NIDHI | 02/03/11 |
#482 | QSR for LEARN | LEARN | closed | fixed | SPIRAL2 | task | major | hmussman@bbn.com | 07/09/10 |
#1217 | QoS SDN (Colocate with GENI Cinema) | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#1251 | pyOpenSSL requirement? | GPO | closed | invalid | SPIRAL6 | major | somebody | 05/21/14 | |
#108 | Provide information on prototype clearinghouse and where/how it will operate. | TIED | closed | fixed | SPIRAL1 | task | major | jtw@ISI.EDU | 08/19/09 |
#1460 | Prototype of a ChoiceNet Economy Plane for the Future Internet Architecture | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 06/18/15 | |
#1151 | ProtoRINA over ProtoGENI Poster | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#500 | ProtoGENI node documentation pages need updating to reflect switchover from Infinera wave connections to I2 1 GE connections via Juniper switch | PROTOGENI | closed | wontfix | SPIRAL2 | task | major | jwilliams@bbn.com | 05/28/14 |
#984 | ProtoGENI/InstaGENI demo at GEC16 | INSTAGENI | closed | fixed | SPIRAL5 | task | major | peter.stickney@bbn.com | 03/20/13 |
#614 | ProtoGENI GEC9 Demo | PROTOGENI | closed | fixed | SPIRAL2 | task | major | hdempsey@bbn.com | 11/15/10 |
#704 | ProtoGENI GEC10 Demo | PROTOGENI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#233 | ProtoGENI demo at GEC#6 | PROTOGENI | closed | fixed | SPIRAL1 | task | major | NIDHI | 02/02/10 |
#129 | ProtoGENI demo at GEC#5 | PROTOGENI | closed | fixed | SPIRAL1 | enhancement | minor | hdempsey@geni.net | 02/08/10 |
#50 | ProtoGENI demo at GEC#4 | PROTOGENI | closed | fixed | SPIRAL1 | task | minor | ricci@cs.utah.edu | 05/11/09 |
#816 | ProtoGENI Demo at GEC12 | PROTOGENI | closed | fixed | SPIRAL4 | task | major | Josh Smift | 11/16/11 |
#1079 | Project OpenBIDS is an efficient Network Intrusion Detection System (NIDS) using OpenFlow framework and Bloom Filter data structure. | GPO | closed | fixed | SPIRAL5 | task | major | peter.stickney@bbn.com | 07/22/13 |
#940 | Project 1868 has updated status reports, please update project page to show milestons have been met | GPO | closed | fixed | SPIRAL4 | task | major | hdempsey@bbn.com | 08/26/13 |
#914 | PrimoGENI demo | PRIMOGENI | closed | fixed | SPIRAL4 | task | major | agosain@bbn.com | 07/10/12 |
#1372 | PrimoGENI and MyExperiment | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 04/27/15 | |
#1200 | Preserve schemas in Manifest | I2AM | new | SPIRAL6 | task | major | xyang@maxgigapop.net | 03/05/14 | |
#1240 | poster request for GEC'20 | GPO | closed | fixed | SPIRAL6 | minor | peter.stickney@bbn.com | 06/06/14 | |
#888 | Poster request for aalborg FIA project | GPO | closed | fixed | SPIRAL4 | task | major | agosain@bbn.com | 03/14/12 |
#1393 | Poster request: A High Level Rule-based Language for Openflow | GPO | closed | fixed | SPIRAL7 | major | peter.stickney@bbn.com | 04/27/15 | |
#1226 | Poster presentation for "End-to-End Cloud Security" | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 | |
#831 | Poster on vehicle multi homing | WIMXUCLA | closed | fixed | SPIRAL4 | task | major | Josh Smift | 11/16/11 |
#729 | Poster on Sustainability of Open Source Software - Kansei | KANSEI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#1236 | Poster on Integrating Dell SDP on GENI: Considerations on the Aggregate | GPO | closed | fixed | SPIRAL6 | major | peter.stickney@bbn.com | 07/03/14 |
Note:
See TracReports for help on using and creating reports.