Project Number
1604
Project Title
GENI Meta Operations
a.k.a. GMOC GMOC website
Technical Contacts
Principal Investigator Jon-Paul Herron jph@grnoc.iu.edu - GMOC Network Engineering
Co-Principal Investigator Luke Fowler luke@grnoc.iu.edu - GMOC Systems Engineering
Principal Investigator Marianne Chitwood chitwood@ilight.net - GMOC Service Desk Project
Participating Organizations
Indiana University Bloomington, IN
Global Research Network Operations Center Indianapolis, IN
Scope
The scope of work on this project is to facilitate the sharing of operational and experimental information among GENI experimental components.
This effort has both technical development and operational requirements. Technically, the GENI Meta Operations Center (GMOC) would require a well-defined protocol to help generalize the operational details of GENI prototypes and for the providers of prototypes to send those details to an operational data repository. These requirements suggest a modular approach, with a generalized protocol rather than a restricted set of hardware and software that GENI prototype participants would be required to run. In other words, it would be largely up to the GENI Spiral project investigators to decide what data to share and how to collect this data from their prototype infrastructure. The GMOC would provide the standardized format for this data and the systems required to share, monitor, display, and act on this data. In addition, the GMOC could be used to help provide a repository for data collections passing into and out of GENI prototypes for the purpose of discovering and isolating prototypes that have caused problems. This might require additional instrumentation at the connection points and substrate elements between prototypes.
This would be accomplished with the help of the other prototypes that are part of GENI Spirals. The GMOC will work with these other projects to develop the operational data formats, processes, and systems needed for a consistent and useful suite of GENI infrastructures. During the project, participants will investigate how a Meta Operations Center might interact with various prototype participants to accomplish operations functions.
Operations Documents
- GMOC Security Procedure
Milestones
MilestoneDate(GMOC: S3.a Complete GENI Concept of Operations document)?
MilestoneDate(GMOC: S3.b Build an initial "Operations Eco-System" table)?
MilestoneDate(GMOC: S3.c Build and populate a GENI operational contact database)?
MilestoneDate(GMOC: S3.d Work with OpenfFow, ORCA, ProtoGENI, and PlanetLab projects to collect and share more operations data)?
MilestoneDate(GMOC: S3.e Support limited operations functions for specific projects)?
MilestoneDate(GMOC: S3.f Work with I&M projects to allow experiments to provide measurement data for their slices to GMOC)?
Project Technical Documents
Operational Dataset Discussion Strawman
Internal data format to be used by GMOC
GMOC Relational Data schema (data format used for submitting relational data to GMOC)
Data exchange format to be used by GMOC (NOTE: See Updated data schema )
GENI Emergency Shutdown Procedure and Workflow Diagram - Spiral 4
GMOC prototype monitoring pages
operations ecosystem table last updated 3/15/2011
GEC Presentations
Reports
Spiral 1 :
Q1
Q2
Q3
Annual Report
Spiral 2 :
Q1
Q2(doc)
Q3(pdf)
Spiral 2 Annual Review
Spiral 3:
- Post-GEC10
- Post-GEC11
Spiral 4:
- GMOC Service Desk Report SP4 Post-GEC13
- GMOC Service Desk Report SP4 Post-GEC14
- GMOC Software Development Post-GEC14 Report
- GMOC Service Desk Report SP4 Post-GEC15
- GMOC Software Development Post-GEC15 Report
Spiral 5:
- GMOC Service Desk Report SP5 Post-GEC16
- GMOC Service Desk Report SP5 Post-GEC17
- GMOC Service Desk Report SP5 Post-GEC18
- GMOC Service Desk Annual Report Spiral 5 (Oct. 2013)
- GMOC Service Desk Report SP5 Post-GEC19
- GMOC Service Desk Report SP5 Post-GEC20
- GMOC Service Desk Report SP5 Post-GEC21
- GMOC Service Desk Annual Report 2014
- GMOC Service Desk Report SP5 Post-GEC22
- GMOC Service Desk Annual Report 2015
Spiral 1 Connectivity
This project will use existing GRNOC addresses and connections. The GRNOC can access Internet2 nodes and endpoints. The project requires IP connectivity between the GRNOC and GENI nodes, servers, and other components that will provide or share operational data. Requirements for layer 2 virtual ethernet connections, are TBD.
GPO Liaison System Engineer
Heidi Picher Dempsey hpd@geni.net
Related Projects
Attachments (51)
-
GMOC.gif (13.2 KB) - added by 16 years ago.
logo
-
GMOC.jpg (141.1 KB) - added by 16 years ago.
block diagram
-
gmoc.framework.png (33.6 KB) - added by 16 years ago.
GMOC Block Diagram
- gmoc_logo_top.png (9.5 KB) - added by 16 years ago.
-
operational_dataset_v31.pdf (80.1 KB) - added by 16 years ago.
Discussion Strawman - Operational Dataset (v3.1)
-
GMOC QR -Q1.pdf (368.6 KB) - added by 16 years ago.
Q42008 GMOC quarterly report
-
GMOC QR -Q2.pdf (1.1 MB) - added by 15 years ago.
GMOC Q2 Quarterly Report
-
GMOC-SECARCH.pdf (208.1 KB) - added by 15 years ago.
Joint GMOC & GENI Security Architecture v1
- GMOC Security Summary.pdf (575.3 KB) - added by 15 years ago.
-
Emergency_Shutdown_System_Description.pdf (9.0 MB) - added by 15 years ago.
GMOC Emergency Shutdown Early Implementation
- Gmoc_GENI_concept_of_operations.pdf (89.4 KB) - added by 15 years ago.
-
GENI Concept of Operations-final.pdf (96.5 KB) - added by 15 years ago.
PDF version of Concept of Operations Document
- GENI_Concept_of_Operations-final.pdf (62.3 KB) - added by 15 years ago.
- Gmoc_spiral2_prototying_plans.doc (317.5 KB) - added by 15 years ago.
-
GMOC QR 2009Q4.pdf (605.8 KB) - added by 15 years ago.
GMOC Quarterly Report 2009 Q4
-
GMOC Annual Report.pdf (2.8 MB) - added by 15 years ago.
GMOC Spiral 1 Annual Report
-
GMOC QR -Q3.pdf (1.1 MB) - added by 15 years ago.
Spiral1 Q3 Quarterly Report
-
Emergency Stop System Description v4.pdf (1.4 MB) - added by 15 years ago.
GMOC Spiral 2 Emergency Stop Description
-
GMOC OMIS update presentation 03|10.pdf (1.8 MB) - added by 15 years ago.
Presentation on Emergency Stop for GEC7
-
concept of operations 03|10.pdf (913.8 KB) - added by 15 years ago.
Presentation on Concept of Operations for GEC7
-
GMOC QR SP2-Q2.doc (292.5 KB) - added by 14 years ago.
GMOC Spiral2 Quarterly report 2
- Emergency_Stop_System_Description_v5.1.doc (898.0 KB) - added by 14 years ago.
-
GMOC QR SP2-Q3 FINAL.pdf (1.1 MB) - added by 14 years ago.
GMOC QR SP2-Q3
- GENI-Concept-of-Operations-v2.1.doc (61.0 KB) - added by 14 years ago.
- GMOC Spiral 2 review.pptx (277.4 KB) - added by 14 years ago.
- GMOC-status-report-March-2011-final.pdf (317.3 KB) - added by 14 years ago.
- measumement_api.pdf (154.3 KB) - added by 13 years ago.
- GMOC QR SP3-August 2011-submited.doc (133.0 KB) - added by 13 years ago.
-
GMOC QR SP3-Nov 2011.doc (131.5 KB) - added by 13 years ago.
GMOC Post GEC11 report
- gmocv3.rng (13.2 KB) - added by 12 years ago.
-
GMOC Service Desk Quarterly Report SP4-Q1.docx (761.3 KB) - added by 12 years ago.
GMOC Service Desk Quarterly Report Spiral 4-Q1
- GMOC Service Desk Quarterly Report SP4-Q1.pdf (482.3 KB) - added by 12 years ago.
- GMOC Service Desk Quarterly Report SP4-Q2.pdf (134.2 KB) - added by 12 years ago.
-
GMOC-Post-GEC14.pdf (247.4 KB) - added by 12 years ago.
GMOC Software Development Post-GEC14 Report
-
GMOC-Post-GEC15.pdf (248.7 KB) - added by 12 years ago.
GMOC Software Development Post-GEC15 Report
-
GMOC Service Desk Quarterly Report SP5-Post GEC16.pdf (115.7 KB) - added by 12 years ago.
GMOC Service Desk Post-GEC16 Quarterly report
-
GMOC Service Desk Quarterly Report SP5-Post GEC17.pdf (116.8 KB) - added by 11 years ago.
GMOC Service Desk Quarterly Report SP5-Post GEC17
-
GMOC Service Desk Annual Report SP5 - 2013.pdf (375.8 KB) - added by 11 years ago.
GMOC Service Desk Annual Report 2013
-
GMOC Service Desk Quarterly Report SP5-Post GEC18.pdf (119.6 KB) - added by 11 years ago.
GMOC Service Desk Quarterly Report SP5-Post GEC18
-
GMOC Service Desk Quarterly Report SP5-Post GEC19.pdf (180.6 KB) - added by 11 years ago.
GMOC Service Desk Quarterly Report SP5-Post GEC19
- GMOC Service Desk Quarterly Report SP5-Post GEC20.docx (329.0 KB) - added by 10 years ago.
- GMOC Service Desk Quarterly Report SP5-Post GEC20.pdf (136.2 KB) - added by 10 years ago.
-
GMOC-Presentation at GEC21.pdf (1.0 MB) - added by 10 years ago.
GMOC Presentation at GEC21
-
GMOC Service Desk Quarterly Report SP5-Post GEC21.pdf (146.7 KB) - added by 10 years ago.
POST GEC 21
- GMOC Service Desk Quarterly Report SP5-Post GEC22.pdf (208.0 KB) - added by 9 years ago.
- GEC22-GMOC-Presentation.pptx (2.8 MB) - added by 9 years ago.
- GMOC Service Desk Annual Report 2015.pdf (438.0 KB) - added by 9 years ago.
- GMOC Service Desk Annual Report 2014.pdf (258.7 KB) - added by 9 years ago.
-
GMOC Security Procedure.docx (15.4 KB) - added by 8 years ago.
GMOC Security Precedure - Event, Vulnerability and Attack
-
GMOC Security Procedure.pdf (51.9 KB) - added by 8 years ago.
.pdf version of GMOC Security Procedure
-
GMOC Service Desk Annual Report 2016 Draft1.2.docx (928.9 KB) - added by 8 years ago.
2016 GMOC annual report