Version 46 (modified by 14 years ago) (diff) | ,
---|
Project Number
1663
Project Title
GENI Registry Services
a.k.a Digital Object Registry, DIGOBREG
Technical Contacts
PI Larry Lannom (mailto:llannom@cnri.reston.va.us / 703 620 8990)
Giridhar Manepalli (mailto:gmanepalli@cnri.reston.va.us / 703 620 8990)
Jim French (mailto:jfrench@cnri.reston.va.us / 703 620 8990)
Christophe Blanchi (mailto:cblanchi@cnri.reston.va.us / 703 620 8990)
Participating Organizations
Corporation for National Research Initiatives (CNRI)
1895 Preston White Drive, Suite 100
Reston, VA 20191 - 5434
Scope
The scope of work on this project is to adapt the Handle System and/or a Digital Object Registry to realize a clearinghouse registry for principals, slices, and/or components in a selected GENI Spiral 1 control framework (possibly using XML RPC), and capable of supporting limited operations in Year 1. Also, to analyze how the Handle System and/or a Digital Object Registry could be used to identify and register GENI software, including experimenter’s tools, test images and configurations, and test results. And finally, to define the operational, scaling, security, and management requirements, plus recommended design approaches, for implementing GENI clearinghouse and software registry services.
Milestones
MilestoneDate(DIGOBREG: S2.a Host a Digital Object Repository service)? (Details here.)
MilestoneDate(DIGOBREG: S2.b DOR services to the Million Node GENI project)?
MilestoneDate(DIGOBREG: S2.c Complete Clearinghouse impl. & federate w/ ProtoGENI)? Link to federated clearinghouse: http://geni.doregistry.org/GFC/
MilestoneDate(DIGOBREG: S2.d Collaborate on security design for Spiral 2)? Link to report
MilestoneDate(DIGOBREG: S2.e Continuously operating GENI Federated Clearinghouse)?
MilestoneDate(DIGOBREG: S2.f Evaluation report on GENI Federated Clearinghouse)? Link to report
MilestoneDate(DIGOBREG: S2.g Collaborate with O&M team)?
MilestoneDate(DIGOBREG: S2.h Contribute to GENI outreach)?
Project Technical Documents
Plan to demonstrate the use of the digital object architecture to implement clearinghouse functionality for ProtoGENI
Security requirements for implementing clearinghouse and registry services.
DOR based GENI Experiment Management Service
Evaluation of the GENI Federated Clearinghouse
Use of the Handle system for identity management in GENI
http://www.handle.net/faq.html
http://doregistry.org
Project Presentations
Digital Object Architecture and GENI Poster
CNRI displayed this poster during the GEC3 held in Palo Alto, CA
GENI Registry Services
Larry Lannom presented these slides at the GEC3 held in Palo Alto, CA
Digital Object Architecture "Lightening Talk"
Giridhar Manepalli presented these slides at the GEC3 held in Palo Alto, CA
Current Status and Future Plans
Larry Lannom presented these slides at the "ProtoGENI Cluster and Preparation for Year 2" Meeting held on July 8th, 2009 in Cambridge, MA
GENI Federated Clearinghouse
Giridhar Manepalli presented these slides at the GEC5 held in Seattle, WA
GENI Federated Clearinghouse Poster
CNRI displayed this poster during the GEC5 held in Seattle, WA
GENI Proposed Services
Giridhar Manepalli presented these slides at the GEC6 held in Salt Lake City, UT
GENI Proposed Services Poster
CNRI displayed this poster during the GEC6 held in Salt Lake City, UT
GENI Proposed Services Poster
CNRI displayed this poster during the GEC7 held in Durham, NC
Quarterly Status Reports
January 2009
April 2009
June 2009
Sept 2009 QSR and Annual Report
December 2009
March 2010
August 2010
Spiral 1 Connectivity
Expect to use IP addresses for registry. Part of ProtoGENI cluster.
No special GENI layer 2 connectivity needs for virtual Ethernet connections.
Experimental Control Tool Proposal
This proposal, we made to Vicraj Thomas, is to use our Digital Object Architecture for building experimental control tools. Vic suggested that there are not enough experiments being conducted in GENI to evaluate this proposal. (Click here for the proposal)
GPO Liaison System Engineer
Related Projects
Attachments (28)
-
QSR-Q408.pdf (75.7 KB) - added by 15 years ago.
Quarterly Status Report --- Dec 2008
-
QSR-Q109.pdf (45.1 KB) - added by 15 years ago.
Quarterly Status Report --- April 2009
-
ClearinghouseSecurityReqmnts.pdf (91.5 KB) - added by 15 years ago.
Clearinghouse Security Requirements
-
FederatedClearinghouse.pdf (235.7 KB) - added by 15 years ago.
Plan for using the Digital Object Repository architecture to implement ProtoGENI registries and clearinghouse.
-
ControlFramework.pdf (250.9 KB) - added by 15 years ago.
Experiment Control Tool
-
QSR-Q209.pdf (52.7 KB) - added by 15 years ago.
Quarterly Status Report --- June 2009
-
DOA-for-ExperimenterTools.pdf (200.0 KB) - added by 15 years ago.
Milestone deliverable: Use of DOA by Experimenter Tools & Svcs
-
QSR-Q309+finalReport.pdf (60.8 KB) - added by 15 years ago.
Quarterly and Final Report --- Sept 2009
-
GENI-ExptMngmntSvc.pdf (146.4 KB) - added by 15 years ago.
DOR based GENI Experiment Management Service
-
QSR-Q409.pdf (185.1 KB) - added by 15 years ago.
December 2009 Quarterly Status Report.
-
CNRI-QSR-Q1-2010.pdf (87.2 KB) - added by 14 years ago.
Quarterly Status Report --- Mar 2010
- GENI Federated Clearing House Performance report.pdf (55.0 KB) - added by 14 years ago.
- Spiral 2 Project Review DOR-Final.pptx (212.2 KB) - added by 14 years ago.
-
Handle-based-GENI-Security-Design.pdf (27.4 KB) - added by 14 years ago.
Handle system for identity management in GENI.
-
GFC Technical Reference.pdf (1.5 MB) - added by 14 years ago.
The GENI Federated Clearinghouse Technical Reference
- GENI-CNRI-Q410.doc (46.0 KB) - added by 14 years ago.
-
GENI-CNRI-SR-033111.pdf (83.0 KB) - added by 14 years ago.
Status Report for the Period Jan 1, 2011 through Mar 31, 2011
-
Measurement Data Archive Prototype.pdf (233.5 KB) - added by 13 years ago.
MDA Design, Implementation and API.
- GENI-CNRI-0811.doc (44.0 KB) - added by 13 years ago.
- Measurement Data Archive Prototype-3.docx (306.6 KB) - added by 13 years ago.
-
GENI-CNRI-Year4Report1.pdf (84.9 KB) - added by 13 years ago.
Solicitation 1 Year 4 First Status Report
-
GENI-CNRI-Year4FinalReport-2012.pdf (74.5 KB) - added by 12 years ago.
Project Status and Final Report for Year 4
-
GENI-CNRI-Year5Report1-2012.pdf (83.0 KB) - added by 12 years ago.
Project Status Report - GEC 15 - Year 5
-
GENISchemaAndExamples.zip (11.5 KB) - added by 11 years ago.
GENI Metadata Schema and Examples. Controlled Vocabulary to be added.
-
GENI-CNRI-Year5Report2-2013.pdf (83.8 KB) - added by 11 years ago.
GENI-CNRI-1663-Year5-Report2-GEC16
-
GENIObject-v2.0.xsd (13.9 KB) - added by 11 years ago.
GSAS Metadata Schema 2.0
-
GENI-RRS-Policy.docx (61.5 KB) - added by 11 years ago.
GENI Research Results Sharing Policy Draft
-
GENI-CNRI-Year5-FinalReport-2013.pdf (83.5 KB) - added by 11 years ago.
GENI Year 5 Final Report