Opened 15 years ago

Closed 14 years ago

#95 closed (fixed)

milestone 1e completion

Reported by: hmussman@bbn.com Owned by: Ivan Seskar
Priority: major Milestone: WiMAX: 1e Demo basic functionality of base station
Component: WIMAX Version: SPIRAL1
Keywords: Cc: hmussman@bbn.com
Dependencies:

Description (last modified by hmussman@bbn.com)

From 1Q09 QSR:

Deliverables made: D1. Demonstration of WiMAX base station accessed via ORBIT control interface – March 31, 2009 (features shown at GEC-4 demo in Miami include: experimenter script to set up WiMAX experiment, use of WiMAX as control channel for V2V application, high bandwidth video streaming, mobile devices with both WiFi? & WiMAX, GUI)

The demo showed a realistic experimental scenario where WiMAX is used as a control channel for location aware/opportunistic vehicular communications. This was intended as a first demo for GEC-4, and further work on more extensive control of radio API features, virtualization and performance monitoring is planned for 2Q09.

From 2Q09 QSR: In terms of key findings, we now have a complete WiMAX experimental setup operating with an FCC experimental license, and have been able to fully integrate this equipment (initially without virtualization) with the ORBIT testbed (i.e. the GENI cluster E framework). This makes it possible for a remote experimenter to use OMF services to run a WiMAX experiment within the ORBIT framework. Further, our initial implementation of the open WiMAX API permits experimenters to access certain L2 parameters of the base station radio including PHY mode settings, RSSI, service class mappings, etc. The example system-level demo using vehicles equipped with dual-mode WiMAX/WiFi radios and GPS shows the feasibility of conducting outdoor experiments with mobility. Ongoing work during 3Q09 will extend this capability to multiple virtual slices operating on the same hardware, and when completed would achieve all the major goals for year 1 of this project. An open design issue to be worked on further is that of fine-grained slice resource management for a WiMAX base station with varying user demands and mobile user signal quality.

Deliverables made: D1. Demonstration of WiMAX base station accessed via ORBIT control interface – March 31, 2009 (features shown at GEC-4 demo in Miami include: experimenter script to set up WiMAX experiment, use of WiMAX as control channel for V2V application, high bandwidth video streaming, mobile devices with both WiFi & WiMAX, GUI)

Change History (5)

comment:1 Changed 15 years ago by hmussman@bbn.com

Description: modified (diff)

comment:2 Changed 14 years ago by hmussman@bbn.com

Resolution: fixed
Status: newclosed

comment:3 Changed 14 years ago by hmussman@bbn.com

Resolution: fixed
Status: closedreopened

comment:4 Changed 14 years ago by hmussman@bbn.com

Owner: changed from ray@winlab.rutgers.edu to Ivan Seskar
Status: reopenednew

On 10/20/09, discuss with Ivan Seskar that this milestone will be completed when demo is done showing multiple slices, expected at GEC6.

comment:5 Changed 14 years ago by Ivan Seskar

Resolution: fixed
Status: newclosed

Demonstrated at GEC6

Note: See TracTickets for help on using tickets.