Opened 14 years ago

Closed 13 years ago

#718 closed (fixed)

demo request for GEC10

Reported by: mblodget@cs.wisc.edu Owned by: chaos@bbn.com
Priority: major Milestone:
Component: MeasurementSys Version: SPIRAL3
Keywords: GEC10 Cc:
Dependencies:

Description

  1. Brief demo description : To follow
  1. List of equipment that will need AC connections 1
  1. Number of wired network connections 1 minimal bandwidth
  1. Number of wireless network connections: 0
  1. Number of static addresses needed: 0
  1. Projector/Monitor, One of either DVI connector preferred
  1. Number of posters (max size poster boards are 30" x 40"): 1
  1. Description of any special requests: 6' of tablespace

Change History (7)

comment:1 Changed 14 years ago by agosain@bbn.com

Owner: changed from somebody to chaos@bbn.com

comment:2 Changed 14 years ago by chaos@bbn.com

Status: newassigned

Thank you for your demo request. We will update this ticket when the resources have been confirmed.

comment:3 Changed 14 years ago by hdempsey@bbn.com

It appears from your request that you do not need a full table for a laptop plus projector/monitor. As you know space is tight. Are you expecting to bring more equipment that needs tablespace?

comment:4 Changed 14 years ago by mblodget@cs.wisc.edu

Demo Description:

Title: Proto-GENI Integrated Instrumentation and Measurement

Demo participants: Mike Blodgett, Joel Sommers, Charles Thomas, Paul Barford, Mark Crovella

Affiliations: University of Wisconsin, Boston University, Colgate University

We intend to demo our high-speed packet capture system and control framework, which is based on the Reference Component Manager implementation for ProtoGENI. This system allows instantiation of a ProtoGENI experiment with high-speed packet capture, system monitoring and control, and results display.

comment:5 Changed 14 years ago by mblodget@cs.wisc.edu

Regarding the table, true we don't expect a large setup but the four feet of table space in the past with posters from neighboring tables encroaching has been a problem in the past.

comment:6 Changed 14 years ago by chaos@bbn.com

GPO has confirmed that we can support your demo at GEC10.

comment:7 Changed 13 years ago by hdempsey@bbn.com

Resolution: fixed
Status: assignedclosed
Note: See TracTickets for help on using tickets.