Changes between Version 3 and Version 4 of PlasticSlices/RequirementsTracking


Ignore:
Timestamp:
07/26/11 11:39:25 (13 years ago)
Author:
hdempsey@bbn.com
Comment:

Add explaination

Legend:

Unmodified
Added
Removed
Modified
  • PlasticSlices/RequirementsTracking

    v3 v4  
    11= Experimenter Requirements =
    22
    3 GENI experimenters provide major input to the meso-scale experiments requirements that drive this project.  Following is a list of requirements as understood at this time.
     3GENI experimenters provide major input to the meso-scale experiments requirements that drive this project.  Following is the list of experimenter requirements as collected through GEC10. Requirements are listed by whether they MUST or MAY be satisfied in the Plastic Slices project, and whether they MUST or MAY be met in a future mesoscale integration project (currently all MAY). 
    44
    55The following requirements '''MUST''' be met within the Plastic Slices Project: