Version 11 (modified by 14 years ago) (diff) | ,
---|
Project Number
1774 and 1833
Project Title
OpenFlow Campus Trials at Stanford University a.k.a. OFSTAN
Technical Contacts
PI: Nick McKeown nickm@stanford.edu
Guru Parulkar parulkar@stanford.edu
Participating Organizations
Stanford University, Palo Alto CA
GPO Liaison System Engineer
Josh Smift Josh Smift
Scope
This project will deploy an OpenFlow, testbed throughout the Stanford University campus. This project will develop OpenFlow extensions focused on the creation of flexible, heterogeneous slices, the development of a generic load balancer and a captive portal for authentication. This work is a precursor to the deployment of OpenFlow into campus production networks.
Current Capabilities
Stanford OpenFlow deployment
- Three OpenFlow VLANs (74 for production traffic, 374 for experimental traffic, 901 for demos)
- Eight OpenFlow switches (HP, NEC, Quanta, and Toroki)
- FlowVisor, SNAC, and NOX controllers
- Production user traffic
Milestones
MilestoneDate(OFSTAN: S2.a Release OpenFlow 1.0)?
MilestoneDate(OFSTAN: S2.b Support campuses)?
MilestoneDate(OFSTAN: S2.c Upgrade FlowVisor and Aggregate Manager)?
MilestoneDate(OFSTAN: S2.d OpenFlow Integration)?
MilestoneDate(OFSTAN: S2.e Integration Testing)?
MilestoneDate(OFSTAN: S2.f Coordinate Nicera Campus Support)?
MilestoneDate(OFSTAN: S2.g improved NOX packaging)?
MilestoneDate(OFSTAN: S2.h Support I2 and NLR Openflow)?
Project Technical Documents
Quarterly Status Reports
GEC
Stanford's slides from the OpenFlow meeting at GEC 7
Spiral 2 Connectivity
Campus Network Connectivity Diagram
Related Projects
OFSTAN
OFGT
OFIU
OFPR
OFRG
OFUWA
OFUWI
OFNOX
EnterpriseGeni
The OpenFlow switch Consortium
NOX
SNAC
FlowVisor
Deploying OpenFlow
Enterprise-GENI
E-GENI Aggregate Manager
Attachments (3)
-
stanford-connectivity.png (108.8 KB) - added by 15 years ago.
Stanford connectivity diagram
-
GEC7-openflow-meeting-slides-OFSTAN.pdf (1.3 MB) - added by 15 years ago.
Stanford's slides from the OpenFlow meeting at GEC 7
-
E-GENI-Status-report-Q1-2010.doc (172.5 KB) - added by 15 years ago.
OFSTAN 2010 Q1 status report
Download all attachments as: .zip