Version 6 (modified by 16 years ago) (diff) | ,
---|
Project Number
1658
Project Title
Mid-Atlantic Crossroads
a.k.a. MAX
Technical Contacts
Principal Investigator: Peter O'Neil poneil at maxgigapop.net
Chris Tracy chris at maxgigapop.net
Jarda Flidr jflidr at maxgigapop.net
Participating Organizations
Mid-Atlantic Crossroads University of Maryland, College Park USC ISI Qwest Eckington Place NE, Washington, DC George Washington University
Scope
Milestones
MAX: Extend DRAGON/GRMS completed
MAX: Purchase virtualization servers and connections completed
MAX: Integrate DRAGON/GRMS Due 5/1/09
MAX: Integrate DRAGON/GENI control framework Due 7/1/09
MAX: Make a working prototype Due 9/1/09
MAX: Delivery of preliminary design doc Due 9/1/09
MAX: Specific contribution to GENI outreach On-going
Project Technical Documents
Quarterly Status Reports
4Q08 Status Report
1Q09 Status Report
Recommended Reading
DRAGON: http://dragon.maxgigapop.net
DRAGON Architecture: http://dragon.maxgigapop.net/twiki/bin/view/DRAGON/Architecture
DRAGON Network: http://dragon.maxgigapop.net/twiki/bin/view/DRAGON/Network
DRAGON Workshop materials and software: http://dragon.maxgigapop.net/twiki/bin/view/DRAGON/Internet2DCNWorkshopJul2008
Standards Documents used in DRAGON: http://dragon.maxgigapop.net/twiki/bin/view/DRAGON/Standards
Those most relevent to the control plane work include:
RFC 2205, RFC 2328, RFC 2370, RFC 2702, RFC 3031, RFC 3209, RFC 3471, RFC 3473, RFC 3477, RFC 3630, RFC 3945, RFC 3946, RFC 4202, RFC 4203, RFC 4206, RFC 4990
Spiral 1 Connectivity
The list of MAX participant institutions that will have potential access to GENI for research experiments are included here:
<http://wiki.maxgigapop.net/twiki/bin/view/MAX/Participants>
These participants are homed into multiple PoP locations where MAX equipment has space agreements with universities, carriers, and participating partners.
PoP locations include:
University of Maryland, College Park
USC ISI-East Arlington, VA
Qwest Eckington Place NE, Washington, DC
George Washington University
Level 3 Old Meadow Rd. Mclean, VA
6 St Paul Street Baltimore
660 Redwood Street Baltimore
Equinix 21715 Filigree Court Ashburn, VA
MAX is able to fully interconnect with NLR layers 1, 2, and 3. Peter O'Neil is the point of contact for NLR connectivity and Chris Tracy for Internet2.
Clarification is needed to address the current air gap of an Ethernet switch between the I2 10G port on the Infinera located at Mclean and the MAX infrastructure. MAX could connect the Infinera either directly to one of DRAGON's existing layer 2 switches, or if another switch is provided, we can connect DRAGON to that switch.
GPO Liason System Engineer
John Jacob jjacob@geni.net
Related Projects
Attachments (22)
- MAX QReport Dec08.doc (47.0 KB) - added by 16 years ago.
- MAX_QReport_March09_rev3-1.doc (514.5 KB) - added by 16 years ago.
-
typical_DRAGON_core_node_photo.png (277.0 KB) - added by 15 years ago.
Typical DRAGON core node (photo)
-
washington_dc_metro_area_DRAGON_footprint.png (290.4 KB) - added by 15 years ago.
Washington DC Metro Area DRAGON network footprint
- GPO_QReport_June09.pdf (114.6 KB) - added by 15 years ago.
-
typical_DRAGON_core_node_block_diagram.2.png (108.0 KB) - added by 15 years ago.
Typical DRAGON core node block diagram
-
typical_dragon_node_physical.png (410.8 KB) - added by 15 years ago.
Typical DRAGON core node physical
-
network-substrate-with-plab-and-netfpga.png (4.3 MB) - added by 15 years ago.
Washington DC metro area footprint showing PlanetLab and NetFPGA nodes
- MAX QSR Sept09.pdf (108.9 KB) - added by 15 years ago.
-
QSR-Dec09.pdf (2.0 MB) - added by 15 years ago.
December 2009 Quarterly Status Report.
-
MAX-GENI-Quarterly-Report-2010-03-31.pdf (1.0 MB) - added by 14 years ago.
1 Q 2010 Status Report
-
max-spiral2-review-slides-2010aug30.pdf (1.5 MB) - added by 14 years ago.
MAX GENI Project Spiral 2 Review slides
-
MAX-GENI-Quarterly-Report-2009-12-31.pdf (2.0 MB) - added by 14 years ago.
MAX GENI 2009-Quarterly4-Report
-
MAX-GENI-Quarterly-Report-2010-06-30.pdf (150.1 KB) - added by 14 years ago.
MAX GENI 2010-Quarterly2-Report
-
MAX-GENI-Quarterly-Report-2010-09-30.pdf (123.8 KB) - added by 14 years ago.
3Q10 Status Report (due 09/30/2010)
-
MAX-GENI-Status-Report-post-gec9-2010-11.pdf (52.0 KB) - added by 14 years ago.
Nov 2010 (Post GEC9) Status Report
-
max-substrate-wash-dc-region.png (1.1 MB) - added by 14 years ago.
MAX Washington DC area Substrate
-
typical_DRAGON_core_node_diagram-v3.png (85.1 KB) - added by 14 years ago.
typical max dragon node
-
dragon_optical-switching-element-v2.png (200.2 KB) - added by 14 years ago.
max research network optical switching element
-
geni-network-stitching-architecture-overview.pdf (1.5 MB) - added by 14 years ago.
GENI Network Stitching Architecture Overview
-
MAX-GENI-Status-Report-2011-08-20.pdf (81.4 KB) - added by 13 years ago.
MAX GENI Status Report - August 20, 2011
-
MAX-GENI-and-Stitching-Status-Report-GEC14.pdf (87.0 KB) - added by 12 years ago.
MAX GENI and Stitching Status Report Post GEC14