Version 38 (modified by 14 years ago) (diff) | ,
---|
Project Number
1633
Project Title
GENI-fying and Federating Autonomous Kansei Wireless Sensor Networks
a.k.a. KanseiGENie
Technical Contacts
Principal Investigator:
Anish Arora,
Ohio State University,
anish@cse.ohio-state.edu,
http://www.cse.ohio-state.edu/~anish/
Co-Principal Investigator:
Rajiv Ramnath,
Ohio State University,
ramnath@cse.ohio-state.edu,
http://www.cse.ohio-state.edu/~ramnath/
Co-Principal Investigator:
Hongwei Zhang,
Wayne State University,
hzhang@cs.wayne.edu,
http://www.cs.wayne.edu/~hzhang/
Co-Principal Investigator:
Sami Ayyorgun,
Los Alamos National Laboratory,
sami@lanl.gov,
http://public.lanl.gov/sami/
Participating Projects and Organizations ==
KanseiGENI Project
Kansei Sensor Network Testbed
NetEye Sensor Network Testbed
Ohio State University, Columbus, OH
Wayne State University, Detroit, MI
Los Alamos National Labs, Los Alamos, NM
Scope
The scope of work on this project is to adapt the large-scale prototype wireless sensor networks of Kansei Consortium to provide GENI-compliant interfaces and principles, to provide publically available support for programmability, virtualization, and slice-based experimentation, and to deploy three geographically dispersed sites in a federated arrangement. Also, provide periodic demonstrations, code releases and installation packages.
Furthermore, provide an experiment interaction dashboard as well as a scripting environment for composing long-running, complex/phased experiments. And finally, provide the Kansei Doctor, whose multi-level invariant-based detector-corrector modules will help make Kansei more self-repairing and autonomic.
Current Capabilities
At end of Year 1.
Milestones
MilestoneDate(KANSEI: 1a Import a GENI-compliant control framework based on ORCA)?
status
MilestoneDate(KANSEI: 1b Establish Kansei testbed clearinghouse)?
status
MilestoneDate(KANSEI: 1c1 Refactor Kansei researcher portal-)?
status
MilestoneDate(KANSEI: 1c2 Integrate Kansei researcher portal-)?
status
MilestoneDate(KANSEI: 1d1 Refactor Kansei component and aggregate managers-)?
status
MilestoneDate(KANSEI: 1d2 Integrate Kansei component and aggregate managers-)?
status
MilestoneDate(KANSEI: 1e Implement, integrate and document v1.0 software)?
MilestoneDate(KANSEI: 1f Demo basic virtualization and experiment control functions)?
MilestoneDate(KANSEI: 1g Open Kansei testbed to GENI users)?
Project Technical Documents
KanseiGENI technical documents
KanseiGENI Infrastructure Description
Quarterly Status Reports
KANSEI: 4Q08 Status Report
KANSEI: 1Q09 Status Report
Spiral 1 Connectivity
Location of equipment:
Lab at Ohio State University
Lab at Wayne State University
Lab at Los Alamos National Labs
See KanseiGENI Infrastructure Description for equipment decriptions.
Ohio State is using their own public IP addresses (please specify). Wayne State IP addresses are TBD. Los Alamos National Labs IP addresses are TBD.
This project will begin with IP connectivity only.
Layer 2 connectivity is TBD.
IT contact at Ohio State University: Rajiv Ramnath
IT contact at Wayne State University: Hongwei Zhang
GPO Liason System Engineer
Harry Mussman hmussman@geni.net
Attachments (13)
- KanseiGenie-Spiral 1-Fall 2008 StatusReport.pdf (400.4 KB) - added by 15 years ago.
- KanseiGenie-InfrastructureCatalog.pdf (337.7 KB) - added by 15 years ago.
- KanseiGenie-Spiral 1-Winter 2009 StatusReport.pdf (1006.5 KB) - added by 14 years ago.
- KanseiGenie_2Q09 Spiral 1-Spring 2009 StatusReport.pdf (320.2 KB) - added by 14 years ago.
- KanseiGenie_3Q09 Spiral 1-Annual StatusReport.pdf (322.7 KB) - added by 14 years ago.
- KanseiGenie_4Q09 Spiral 2-Fall 2009 StatusReport.pdf (79.0 KB) - added by 14 years ago.
-
KanseiGenie_Spiral 2-Winter 2010 StatusReport.pdf (80.3 KB) - added by 14 years ago.
Winter 2010 status report
- KanseiGenie_Spiral 2-Spring 2010 StatusReport.pdf (152.7 KB) - added by 13 years ago.
- Spiral 2 Project Review-v2.pptx (254.7 KB) - added by 13 years ago.
-
KanseiGenie_Spiral 3-GEC9-10 StatusReport.pdf (245.8 KB) - added by 13 years ago.
KanseiGenie Status Report: Spiral 3, GEC10
- GEC9Cluster-Kansei.pptx (623.8 KB) - added by 13 years ago.
- KanseiGenie-poster-GEC10.pdf (1.7 MB) - added by 13 years ago.
-
KanseiGenie_FinalReport.pdf (1.4 MB) - added by 12 years ago.
KanseiGenie Final Report