Changes between Version 1 and Version 2 of Gec7ClusterDDemos
- Timestamp:
- 03/23/10 11:52:09 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Gec7ClusterDDemos
v1 v2 1 GEC7 demos, updated 1/27 and 2/31 GEC7 Demos on 3/16/10 (demo session) 2 2 3 4 Note: Projects should correct and expand this list.5 3 6 4 LEARN: Use RENCI/BEN's Infinera DTNs for the demonstration of the measurement handler software together with IMF project. Remote connect to local ORCA; by GEC8, control LEARN … … 14 12 IMF: Gather data from BEN, distribute with Pub-Sub system 15 13 16 ORCA/BEN: Connect multiple sites via NLR, e.g., demo floor to ?14 ORCA/BEN: Connect multiple sites via NLR, e.g., demo floor to ViSE 17 15 18 iGENI: Provisioning two 10Gbps links, Starlight via NLR to RENCI. Dynamic provisioning of the paths. Novel high-performance protocols. 16 iGENI: Provisioning two 10Gbps links, 6509 at Northwestern, via Starlight and NLR to RENCI via BEN, and to UMass via NOX. 17 + Dynamic provisioning of the path to RENCI via BEN 18 + Static provisioning of the path to UMass via NOX 19 19 20 iGENI:21 Towards extended Cluster D connectivity. [[BR]]22 Direct fiber from Starlight to Ohio State, and other sites. [[BR]]23 Will be using QinQ to mitigate numbering issues.24 20 21 GEC7 Demo on 3/17/10 (plenary session) 25 22 26 23 ORCA/BEN, iGENI and UMass: Demo from UMass to demo floor[[BR]] 27 24 + Take CASA software, ship radar data via VLAN to demo floor, process data there, visualize on a map. 28 25 + [http://groups.geni.net/geni/attachment/wiki/Gec7Agenda/orca-demo-gec7.pdf Demo description] 29 26 30 27 … … 32 29 33 30 + Planning on a demo, RENCI, iGENI, UMass[[BR]] 34 + Both first day, and plenary[[BR]]35 + BBN will map VLAN, from UMass to BBN, to NLR FrameNet[[BR]]36 + To setup path: David Irwin, Chaos Golubitsky, Chris Heermann, Jim Chen[[BR]]37 + Pending: UMass direct connection to NLR FrameNet[[BR]]38 + Pending: BBN will get Cisco 3750, which can be used later[[BR]]39 + Pending: x2 NLR FrameNet ports for Starlight40 31 32