Changes between Version 3 and Version 4 of Gec5OmisAgenda
- Timestamp:
- 07/21/09 16:17:03 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Gec5OmisAgenda
v3 v4 1 1 = ''Draft'' Agenda for OMIS meeting at GEC5 = 2 2 3 The fifth [http://groups.geni.net/geni/wiki/Gec5Agenda GENI Engineering Conference] will be held in Seattle, WA from July 20 to 22, 2009. The OMIS WG will meet from 3:30 to 5:30 pm on Tuesday, July 21. This is the ''draft'' agenda for what we will do during that time. In particular, the order and amount of time are just guesses. This is already tight on time, but any suggestions for other topics that should be added, or lightning talks you'd like to do, can be sent to the [mailto:HPD@GENI.net Chair]/[mailto:MAP@GENI.net SE] or to the [mailto:OMIS-WG@GENI.net mailing list] for discussion.3 The fifth [http://groups.geni.net/geni/wiki/Gec5Agenda GENI Engineering Conference] will be held in Seattle, WA from July 20 to 22, 2009. The OMIS WG will meet from 3:30 to 5:30 pm on Tuesday, July 21. This is already tight on time, but any suggestions for other topics that should be added, or lightning talks you'd like to do, can be brou8ght up during "Agenda Bashing". Clock times are based on starting on schedule and staying on schedule, so are subject to change... 4 4 5 5 == Agenda == 6 * Administrivia - WG Chair (Heidi Picher Dempsey) 5 mins6 * ![3:30-3:35] Administrivia - WG Chair (Heidi Picher Dempsey) 5 mins 7 7 * Introduction, agenda bashing and orientation 8 8 * [http://groups.geni.net/geni/attachment/wiki/Gec5OmisAgenda/Integration%20Summary.pdf Integration status] 9 * Network (Mike Patton) 15 mins10 * Operations and Management (Jon-Paul Herron) 15 mins11 * Security (Stephen Schwab) 15 mins9 * ![3:35-3:50] Network (Mike Patton) 15 mins 10 * ![3:50-4:05] Operations and Management (Jon-Paul Herron) 15 mins 11 * ![4:05-4:20] Security (Stephen Schwab) 15 mins 12 12 * Design/Requirements/Ideas Discussions (will be interactive with all interested participants) 13 * Emergency Shutdown: operational concerns, security, etc. max 25 mins14 * Data sharing when the data is distributed max 25 mins15 * Distributed authorization (if time available and not already covered)13 * ![4:20-4:45] Emergency Shutdown: operational concerns, security, etc. max 25 mins 14 * ![4:45-5:10] Data sharing when the data is distributed max 25 mins 15 * ![5:10-5:25] Distributed authorization (if time available and not already covered) 16 16 * Lightning Talks (about 5 mins each) 17 * Quilt Regional Networks status update (Jen Leasure)17 * ![5:25-5:30] Quilt Regional Networks status update (Jen Leasure) 18 18 * others as time permits 19 19