Version 31 (modified by 8 years ago) (diff) | ,
---|
US Ignite InstaGENI Confirmation Test Status
This page captures the status for new US Ignite InstaGENI sites that are validated by the GPO upon completion of the US Ignite GENI Rack Site Installation Checklist?. The GPO executes Administration, Experiment, Network VLAN Stitching and Monitoring tests to confirm the ability of a New Site to operate within the GENI environment. Tests are defined in the US Ignite Site Confirmation Tests page.
Site Status
Confirmation Tests In Progress:
University of Louisiana USIgnite at Lafayette,
Completed Confirmation Tests successfully:
Status Legend
Overall InstaGENI Site Status may be one of the following:
- Pass - Site confirmation tests completed successfully and site is ready for Experimenters.
- Pass: most criteria - Site partially confirmed with documented exceptions.
- Blocked - Site confirmation tests blocked by tracked issue.
- In Progress - Site confirmation tests in progress.
Individual Confirmation Test Status status may be one of the following:
- Color(green,Pass)? - Site Confirmation Test completed and met all criteria
- Color(#98FB98,Pass: most criteria)? - Site Confirmation Test completed and met most criteria with exceptions documented
- Color(red,Fail)? - Site Confirmation Test completed and failed.
- Color(orange,Blocked)? - Site Confirmation Blocked by ticketed issues.
- Color(#63B8FF,In Progress)? - Site Confirmation Test in progress.
US Ignite InstaGENI Sites Test Status
University of Louisiana US Ignite - Lafayette
Overall Site Status:_ In Progress
Confirmation Test Start Date: 2017-05-08
Confirmation Test Completion Date: <<insert_date_here>>
Confirmation Tests Logs: University of Louisiana US Ignite - Lafayette
Request RSpecs: <<insert_link_to_repo_rspec1>>.
University of Vermont - Burlington
Overall Site Status:_ In Progress
Confirmation Test Start Date: 2017-05-08
Confirmation Test Completion Date: <<insert_date_here>>
Confirmation Tests Logs: University of Vermont - Burlington
Request RSpecs: <<insert_link_to_repo_rspec1>>.
University of Texas - Dallas
Overall Site Status:_ <<insert_site_status>>
Confirmation Test Start Date: <<insert_date_here>>
Confirmation Test Completion Date: <<insert_date_here>>
Confirmation Tests Logs: University of Texas - Dallas
Request RSpecs: <<insert_link_to_repo_rspec1>>.
Template Site GPO US Ignite - Cambridge
Overall Site Status:_ Pass: most criteria
Confirmation Test Start Date: 2017-02-22
Confirmation Test Completion Date: <<insert_date_here>>
Test | State | Completed | Tickets | Notes |
IG-CT-1 VM Resources | Color(green,Pass)? | 2017-02-24 | ||
IG-CT-2 Bare Metal and VM | Color(green,Pass)? | 2017-02-24 | ||
IG-CT-3 Multi-site Tunnel | Color(green,Pass)? | 2017-02-27 | GRE IP table patching | |
IG-CT-5 Monitoring | N/A | Not configured for template rack | ||
IG-CT-6 Administrative | Color(green,Pass)? | 2017-02-28 | ||
IG-ST-1 New Site to GPO IG | Color(green,Pass)? | 2017-02-27 | ||
IG-ST-2 Loop topology | Color(red,Fail)? | 2017-02-28 | Multi-link problem specific to GPO rack, not reproducible at other sites. | |
IG-ST-3 Linear topology | Color(red,Fail)? | 2017-02-28 | Multi-link problem specific to GPO rack, not reproducible at other sites. | |
IG-ST-4 New Site to GPO EG | Color(green,Pass)? | 2017-02-27 | ||
IG-ST-5 Site Information | N/A | Temporary site | ||
IG-ST-6 OpenFlow topology | Color(green,Pass)? | 2017-02-22 |
Confirmation Tests Logs: GPO US Ignite Template Site
Request RSpecs: <<insert_link_to_repo_rspec1>>.