Changes between Version 8 and Version 9 of GEMINIv1.1IntegrationTasks


Ignore:
Timestamp:
10/08/12 12:28:11 (12 years ago)
Author:
Jeanne Ohren
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEMINIv1.1IntegrationTasks

    v8 v9  
    1010||  2 || Set up MS dev instance || Ahmed || 10/8 || || ||
    1111||  3 || Send data access code to Jeremy || Ahmed || 10/8 || ||
    12 ||  4 || Package, instrumentize, and test Blipp/UNIS/MS ||  Ezra and Matt ||  10/12 || || ||
    13 || 5 || Integrate Blipp graphs into drupal || Jeremy and Charles || 10/11, 10/15 || || ||
     12||  4 || Package, instrumentize, and test Blipp/UNIS/MS ||  Ezra and Matt ||  10/12 || || Deliverables are a new tarball and install script ||
     13|| 5 || Integrate Blipp graphs into drupal || Jeremy and Charles || 10/11, 10/15 || || Deliverables are new drupal configuration installed on the GN ||
    1414|| 6 || Run Acceptance tests on all supported configurations || Jeanne || 10/22 || || ||
    1515|| 7 || Compose tutorial wiki || Jeremy and Ahmed || 10/12 || || 1st draft by 10/12, iterate the week before GEC ||
    1616|| 8 || Define topology, produce initial rspec || Jim and Charles || 10/10 || || ||
     17|| 9 || Set up and verify half of slices for tutorial || Ezra || 10/12 || || ||
     18|| 10 || Set up rest of slices for tutorial || Ezra || 10/15 || || ||
     19|| 11 || Create information sheet || Jeanne || 10/22 || || ||
     20|| 12 || Create accounts for path controller || Charles || 10/19 || || ||
     21|| 13 || Verify resource allocation for tutorial || Jim ||  10/12 || || ||
    1722
    1823
    1924
     25