Changes between Version 21 and Version 22 of GECDemoSubmission
- Timestamp:
- 04/28/14 17:47:33 (9 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GECDemoSubmission
v21 v22 17 17 {{{ 18 18 19 NOTE: we are requiring a good description,as it will be on the Demo Night Map given to all Demo Night Attendees.19 NOTE: We will distribute this description to all GENI attendees to help people find the demos they are most interested in seeing, so it is important to write a compelling and accurate description. If you have done demonstrations before, make sure to highlight what is different about this demonstration compared to previous ones. Indicate in your description who really should see the demo and why (e.g. "Network providers that support OpenFlow should see this tool demonstration because it will let them manage limited bandwidth efficiently.") **as it will be on the Demo Night Map given to all Demo Night Attendees. 20 20 21 Brief demo description (A few sentences to best describe your demo for the GEC wiki and Demo Night Map. See http://groups.geni.net/geni/wiki/GEC16Agenda/EveningDemoSession )21 Demo description paragraph. 22 22 23 23 List of equipment that will need AC connections (e.g. laptop, switch hardware prototype, monitor). (Just put in the number of connections needed if your demo description already lists the equipment) 24 24 25 Number of wired network connections (include required bandwidth if significant) 25 Total number of wired network connections (wired IP AND VLAN conenctions). 26 27 Number of wired layer 2 VLANs. Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. 26 28 27 29 Number of wireless network connections (include required bandwidth if significant) … … 33 35 Number of posters (max size poster boards are 30" x 40") 34 36 35 Description of any special requests (include any specific network connectivity needs (e.g. layer2 VLAN to NLR), projects you'd like to be located near, etc.)37 Special requests (include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be located near, etc.) 36 38 37 If you need a layer 2 VLAN to the demo floor, does it need to be tagged or untagged?39 38 40 39 41 }}} 40 42 41 We expect most demonstrations will integrate two or more projects, so please make sure you mention any other collaborating teams in the text of 42 your ticket. The tickets will help us locate collaborating teams near each other in the demo space as much as possible. 43 We expect most demonstrations will integrate two or more projects, so please make sure you mention any other collaborating teams in the text of your ticket. The tickets will help us locate collaborating teams near each other in the demo space as much as possible. 43 44 44 45 Posters will be mounted on stands near the demo tables. The maximum poster board size is 30" x 40." Half size posters (30" x 20") are encouraged if the contents allow. … … 49 50 50 51 When you are entering data for your demo ticket: 51 * 52 * Select your Project Name from the drop-down list for the ticket "Component" field. 52 53 * Leave the "Milestone" and "Dependencies" fields blank, which is the default. 53 54 * Include anyone who should get email updates on the ticket in the "Cc" field. You will automatically get updates on the ticket.