Changes between Version 7 and Version 8 of GEC5SubsWGAgenda


Ignore:
Timestamp:
07/22/09 12:16:21 (15 years ago)
Author:
Christopher Small
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC5SubsWGAgenda

    v7 v8  
    10102)  Review of recent vertical and horizontal integration examples:
    1111
    12         a) [http://groups.geni.net/geni/attachment/wiki/GEC5SubsWGAgenda/GEC5-xin-substrate-wg.pdf ORCA integration with BEN], including cross layer setup in BEN, and setup of VLANs through BEN and NLR (stitching)  (20 min)
     12        a) [http://groups.geni.net/geni/attachment/wiki/GEC5SubsWGAgenda/GEC5-xin-substrate-wg.pdf ORCA integration with BEN], including cross layer setup in BEN, and setup of VLANs through BEN and NLR (stitching)
    1313        Yufeng Xin - RENCI
    1414
    15         b) ORBIT (OMF) integration with a WiMAX base station (vertical integration) and plans to connect WINLAB and NICTA sites via I2, etc. (horizontal integration)  (20 min) 
     15        b) [http://groups.geni.net/geni/attachment/wiki/GEC5SubsWGAgenda/WiMAX_OMF_integration_GEC5_7.09.pdf ORBIT (OMF) integration with a WiMAX base station] (vertical integration) and plans to connect WINLAB and NICTA sites via I2, etc. (horizontal integration)
    1616        Ray Raychaudhuri - WINLAB/Rutgers
    1717
    18         c)  PlanetLab GENI integration with DRAGON resources in MAX (vertical integration), and using DRAGON to make connections across multiple entities (horizontal integration)  (20 min)
     18        c)  PlanetLab GENI integration with DRAGON resources in MAX (vertical integration), and using DRAGON to make connections across multiple entities (horizontal integration)
    1919        Chris Tracy - MAX, incoming co-chair
    2020
    21 3)  Introduction to Ultra Science Net  (15 min)
     213)  [http://groups.geni.net/geni/attachment/wiki/GEC5SubsWGAgenda/UltraScienceNet-5GENI-Rao.pdf Introduction to Ultra Science Net]
    2222        Nagi Rao - Oak Ridge National Laboratory
    2323