Version 11 (modified by 12 years ago) (diff) | ,
---|
-
GEMINI Spiral 5 Planning Meeting
- Schedule
- Location
- Attendees
- Description
- Summary
- Agenda
- 1) GEMINI Goals
- 2) Basic Test/Tutorial/Experiment Workflow
- 3) GEMINI Definition for v1.1/GEC15
- 4) Target Aggregates for v1.1/GEC15 and Spiral 5
- 5) Reference Experiments for v1.1/GEC15 and Spiral 5
- 6) Introducing New GEMINI Architecture for v1.1/GEC15
- 7) GEMINI Portal for v1.1/GEC15
- 8) GEMINI Integration Plan for v1.1/GEC15
- Lunch
- 9) Extending New GEMINI Architecture for Spiral 5
- 10) Extending GEMINI Measurement Analysis, Presentation, Storage and …
- 11) Extending GEMINI Portal Service in Spiral 5
- 12) Review of GEMINI Plans and Open Issues for Spiral 5
- Adjourn
GEMINI Spiral 5 Planning Meeting
Schedule
Friday, October 5, 9:00am - 3:30pm
Location
Hilton Garden Louisville-Airport
Address: 2735 Crittenden Drive Louisville, KY 40209 United States
Tel: +1 (502) 637-2424
Attendees
GENI Project Office: Harry Mussman, Jeanne Ohren
Indiana Univ: Martin Swany, ...
Univ of Kentucky: Jim Griffioen,
Description
Summary
Agenda
1) GEMINI Goals
9:00am
Spiral 5:
Introduce and deploy new architecture;
provide useful tools at each GEC
v1.1/GEC15:
Introduce new architecture with passive measurements;
follow basic test/tutorial/experiment workflow;
who is responsible on GEMINI team for flow of tutorial?
v2beta/GEC16:
Extend new architecture to include basic active measurements;
extend analysis, presentation, storage and archiving of measurements
v2.0/GEC17:
Add full set of active measurements;
follow infrastructure measurement workflow, including sharing data with others;
include ability to retrieve data from storage for further analysis and presentation
Spiral 6:
Add functions, features and refinements, based on user feedback;
integrate with other GENI tools (e.g., GENI CH Portal)
Comments or changes?
2) Basic Test/Tutorial/Experiment Workflow
9:15am
See link
Sets requirements for use of tools by experimenter to instrument and measure their slice.
Should be used as basis for GEC15 tutorial.
Comments or changes?
3) GEMINI Definition for v1.1/GEC15
9:30am
See link
Comments or changes?
4) Target Aggregates for v1.1/GEC15 and Spiral 5
10:00am
v1.1/GEC15:
Target either ProtoGENI clusters and InstaGENI racks
However, since InstaGENI racks are still unstable, GEC15 tutorial will target only ProtoGENI clusters, preferably Univ Kentucky.
v2beta/GEC16:
Target either ProtoGENI clusters and InstaGENI racks
GEC16 tutorial should target InstaGENI racks, preferably slices spanning multiple racks
v2.0/GEC17:
Add target of ExoGENI racks, for slices spanning multiple racks
However, a slice does NOT need to span both types of racks
Comments or changes?
5) Reference Experiments for v1.1/GEC15 and Spiral 5
10:15am
v1.1/GEC15:
Phoebus/XSP? See link (Ezra)
Alternate? (Jim) [[BR}}
How to orchestrate reference experiment? consider OMF?
v2beta/GEC16:
Active network measurements?
v2.0/GEC17:
Active network measurements, with data sharing?
CCNIE award to IU (starting Jan, 2013), focus on distributed storage on infrastructure; includes Phoebus, OF; concern: does GENI have enough storage? ( Note: ExoGENI includes storage resources) (Martin)
Comments or changes?
6) Introducing New GEMINI Architecture for v1.1/GEC15
10:45am
See BLiPP, MS, NewUNIS, for Type-2 passive host measurements; see config (Ezra, Ahmed)
Introduce flexible AA between new modules and NewUNIS; see config (Ezra, Ahmed)
Comments or changes?
7) GEMINI Portal for v1.1/GEC15
11:15am
Use to find all GUIs; integrate with NewUNIS (Jim, Charles)
Comments or changes?
8) GEMINI Integration Plan for v1.1/GEC15
11:30am
Arrangements for source control? (IU/UK/Jeanne)
Who produces what modules?
Who integrates moduels?
Acceptance testing (Jeanne)
Lunch
12noon
9) Extending New GEMINI Architecture for Spiral 5
1:00pm
New MPs, for active network measurements; extend to OF/L2?
Extended MSs, and data flows between MPs, MSs, and MAPs
How to configure and orchestrate?
Local NewUNIS and global NewUNIS; use by GENI stitching?
Data flow between slices, with authentication and authorization, for sharing measurements
10) Extending GEMINI Measurement Analysis, Presentation, Storage and Archive Functions in Spiral 5
1:30pm
Flexible analysis and presentation of measurements.
Push/pull to/from storage service, based on iRODS
Include descriptors, following GENI schema
Retrieve measurements from storage service, for further analysis and presentation
Define object, and move to archive service; share with others per attached policy
11) Extending GEMINI Portal Service in Spiral 5
2:00pm
Basic: find all GUIs
Extended functions?
Access from GENI CH Portal? or merge with GENI CH Portal?
12) Review of GEMINI Plans and Open Issues for Spiral 5
2:30pm
Adjourn
3:30pm