Changes between Version 25 and Version 26 of 041409NYCOptInWGAgenda


Ignore:
Timestamp:
07/16/09 13:51:18 (15 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 041409NYCOptInWGAgenda

    v25 v26  
    1515If you are interested in reviewing the overview document, please contact the WG Chairs, the WG System Engineer, or send mail to the WG mailing list.
    1616
    17 To be able to discuss solutions to opt-in issues requires a knowledge of the strucutre of a GENI suite i.e., the entities, actors and agreements.  It was decided to discuss possible structures, and identify likely reference structures, and this has been summarized in a DRAFT document.  See [http://groups.geni.net/geni/attachment/wiki/041409NYCOptInWGAgenda/061509b%20%20GENI-SE-SY-STRO-01.1.pdf  ]] for the current DRAFT of the "GENI Structure Overview" document.[[BR]]
     17To be able to discuss solutions to opt-in issues requires a knowledge of the strucutre of a GENI suite i.e., the entities, actors and agreements.  It was decided to discuss possible structures, and identify likely reference structures, and this has been summarized in a DRAFT document.  See [http://groups.geni.net/geni/attachment/wiki/041409NYCOptInWGAgenda/061509b%20%20GENI-SE-SY-STRO-01.1.pdf  ] for the current DRAFT of the "GENI Structure Overview" document.[[BR]]
    1818
    1919