Changes between Version 25 and Version 26 of 041409NYCOptInWGAgenda
- Timestamp:
- 07/16/09 13:51:18 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
041409NYCOptInWGAgenda
v25 v26 15 15 If you are interested in reviewing the overview document, please contact the WG Chairs, the WG System Engineer, or send mail to the WG mailing list. 16 16 17 To be able to discuss solutions to opt-in issues requires a knowledge of the strucutre of a GENI suite i.e., the entities, actors and agreements. It was decided to discuss possible structures, and identify likely reference structures, and this has been summarized in a DRAFT document. See [http://groups.geni.net/geni/attachment/wiki/041409NYCOptInWGAgenda/061509b%20%20GENI-SE-SY-STRO-01.1.pdf ] ]for the current DRAFT of the "GENI Structure Overview" document.[[BR]]17 To be able to discuss solutions to opt-in issues requires a knowledge of the strucutre of a GENI suite i.e., the entities, actors and agreements. It was decided to discuss possible structures, and identify likely reference structures, and this has been summarized in a DRAFT document. See [http://groups.geni.net/geni/attachment/wiki/041409NYCOptInWGAgenda/061509b%20%20GENI-SE-SY-STRO-01.1.pdf ] for the current DRAFT of the "GENI Structure Overview" document.[[BR]] 18 18 19 19