Custom Query (1408 matches)
Results (31 - 33 of 1408)
Ticket | Resolution | Summary | Owner | Reporter |
---|---|---|---|---|
#190 | wontfix | MAX outreach | ||
Description |
Coordinate with the University of Maryland’s Clark School of Engineering Center for Minorities in Science and Engineering to explore involving one or more graduate student interns. |
|||
#250 | wontfix | SPP GPE Board failure at Salt Lake City Pop | ||
Description |
One of the two GPEs in the SPP Chassis at the Salt Lake City Pop has failed. It will need to be replaced. There are two possible avenues to replacing it as we see it.
We have a work around in place that allows us to operate the SPP node with just one GPE. There is no pressing need to replace the failed GPE before the GEC6 demonstration. In fact, we would probably prefer not to perturb things by replacing it before the demonstration. This failure appears to be similar to the failure we had with the LC at Kansas City which has already been fixed. That failed LC board is now in the hands our the manufacturer for diagnosis and repair. |
|||
#345 | wontfix | Collaboration between GMOC and ORBIT | ||
Description |
GMOC needs collaboration from exemplar projects about data format and data sharing. Orbit has been contacted and a conference call is being planned. |