Project Number
1791
Project Title
Experimenting on Opportunistic Mobile Wireless Networks in GENI
a.k.a. OppWireless
Technical Contacts
Principal Investigator Jiang Li jli@howard.edu
Participating Organizations
Howard University
2400 6th Street NW
Washington DC 20059
GPO Liaison System Engineer
Mark Berman
Scope
This effort will perform early experiments on ORBIT with the goal of identifying issues with setting up, running and instrumenting experiments on ORBIT. The project team will document its experiences and provide program examples and libraries that will be useful to other researchers wishing to conduct experiments using ORBIT.
Current Capabilities
BRIEF descriptions of resources/functions/tools that are available to anyone in the GENI community
Milestones
OppWireless: S2.a (Completed late 06/04/10) Experiment design document v. 1.0 experiment_spec_v1.0.docx
OppWireless: S2.b (Completed late 08/27/10) Report on early experiments with ORBIT
OppWireless: S2.c (Completed late 10/13/10) Experiment design document v. 1.1
OppWireless: S2.d (Completed late 12/15/10) Implementation of a Pigeon network algorithm for ORBIT
OppWireless: S2.e (Completed late 08/03/12) Report on experiences with running Pigeon network based experiments on ORBIT
Project Technical Documents
Links to wiki pages for the project's technical documents go here. List should include any document in the working groups, as well as other useful documents. Projects may have a full tree of wiki pages here.
Quarterly Status Reports
Quarterly status report 1Q2010 Q1_Report.docx
Spiral 2 Connectivity
To be confirmed: Layer 3 connectivity to ProtoGENI Clearinghouse. Layer 3 connectivity to provision resources used in experiment. Layer 2/3 connectivity between resources in experiment.
Related Projects
Includes non-GENI projects.
Attachments
- experiment_spec_v1.0.docx (14.7 kB) -
Experiment Design Spec, v1.0
, added by mberman@bbn.com on 06/22/10 11:31:35. - Q1_Report.docx (15.6 kB) -
Quarterly Report 1Q2010
, added by mberman@bbn.com on 06/22/10 11:33:48. - Interim_report_2010_08.ppt (384.0 kB) -
A detailed report on current progress (till August 2010)
, added by jli@howard.edu on 08/27/10 01:33:44. - Spiral 2 Project Review.pptx (199.4 kB) -
Spiral 2 Project Review
, added by jli@howard.edu on 08/27/10 09:15:30. - PigeonNet-10-11-2010.zip (94.1 kB) -
The basic emulation framework with 3 nodes
, added by jli@howard.edu on 10/13/10 10:14:18. - 2011_Q1_Report.docx (16.6 kB) -
2011 Q1 Report
, added by jli@howard.edu on 04/01/11 16:49:07. - 2011_Q1_Code_and_Doc.zip (218.8 kB) -
2011 Q1 - Source Code and Detailed Report
, added by jli@howard.edu on 04/01/11 16:50:19. - 2012_Q2_Report.docx (16.4 kB) -
Q1-Q2 2012 status report
, added by jli@howard.edu on 08/03/12 12:52:41. - detailed_report.docx (183.0 kB) -
Detailed report for the whole project
, added by jli@howard.edu on 08/03/12 12:57:58. - code.zip (97.8 kB) -
Source code developed in the project
, added by jli@howard.edu on 08/03/12 12:58:36.
