Changes between Version 9 and Version 10 of ClusterECall020810


Ignore:
Timestamp:
02/08/10 16:06:40 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ClusterECall020810

    v9 v10  
    55Attendees:
    66                Harry Mussman  (GPO)[[BR]]
    7                 BBN Technologies Tony Michele [[BR]]
     7                BBN Technologies Tony Michel [[BR]]
    88                PI: Dipankar Raychaudhuri WINLAB, Rutgers University[[BR]]
    99                Sampath Rangarajan NEC Laboratories America[[BR]]       
     
    191911:05am Update on WiMAX kits:  contents, including clients, and schedule for hardware and software[[BR]]
    2020                Ivan Seskar (Rutgers WINLAB) and Sampath Rangarajan (NEC)[[BR]]
    21                 Sampath:  Seven base stations were ordered, profile A, and are now expected to arrive (with a high confidence) by mid-May, 2010.  Profile A were choosen to allow the most cutomization.  Later orders will be for Profile C stations.  [[BR]]
    22                 Ray:  As these arrive, they will be assembled int kits with software on PCs, and delivered sequentially to cmapuses.  Goal for 2010:  deliver two kits to two campuses. Goal for 2011:  deliver remaining kits. [[BR]]
    23                 Harry:  Who wishes to plase an order for additiuonal base station kits?  BBN technologies;  University of Wisconsin;  others?  [[BR]]
     21                Sampath:  Seven base stations were ordered, profile A, and are now expected to arrive (with a high confidence) by mid-May, 2010.  Profile A was choosen to allow the most cutomization.  Later orders will be for Profile C stations.  [[BR]]
     22                Ray:  As these arrive, they will be assembled into kits with software on PCs, and delivered sequentially to campuses.  Goal for 2010:  deliver two kits to two campuses. Goal for 2011:  deliver remaining kits. [[BR]]
     23                Harry:  Who wishes to plase an order for additional base station kits?  BBN Technologies;  University of Wisconsin;  others?  [[BR]]
    2424                Ivan:  First clients have arrived:  USB dongles.  [[BR]]
    2525
     
    5454
    5555A review of experience from these projects, and suggestions for others:[[BR]]
    56                 BBN Technologies (pending)      Tony Michele [[BR]]
    57                 Tony:  completed survey and application process, per: [http://groups.geni.net/geni/attachment/wiki/WIMXBBN/020810%20%20license-HOWTO.pdf  slides].  Applied for two experimental licenses;  both are now pending;  waiting for response from FCC.  If and when received, good for 2 years;  then, will need to reapply.
     56                BBN Technologies (pending)      Tony Michel [[BR]]
     57                Tony:  completed survey and application process, per [http://groups.geni.net/geni/attachment/wiki/WIMXBBN/020810%20%20license-HOWTO.pdf  slides].  Applied for two experimental licenses;  both are now pending;  waiting for response from FCC.  If and when received, good for 2 years;  then, will need to reapply.
    5858       
    5959               
     
    6363
    6464                NEC Laboratories America (done)         Sampath Rangarajan [[BR]]
    65                 Sampath:  You should be sure to include "GENI Meso-Scale Project Overview" to alert FCC to government contract form NSF.  [[BR]]
     65                Sampath:  You should be sure to include "GENI MiMAX Meso-Scale Project Overview" to alert FCC to government contract form NSF.  [[BR]]
    6666               
    6767                UMass Amherst   (pending)       Mark Corner and Brian Lynn[[BR]]
     
    8080               
    8181                Wisconsin (1724)        PI: Suman Banerjee [[BR]]
    82                 Suman:  Have license, using it with current Cisco base station, owned by Eduacational Communications Board.  Will be applying for a second license.  Have three good sites:  one for Cisco, one for this kit, and would liek to get a second lit for thrid site.  [[BR]]
     82                Suman:  Have license, using it with current Cisco base station, owned by Educational Communications Board.  Will be applying for a second license.  Have three good sites:  one for Cisco, one for this kit, and would like to get a second kit for third site.  [[BR]]
    8383               
    8484                UMass Amherst (1731)    PI:  Mark Corner, Brian Lynn [[BR]]
     
    8787               
    8888                Colorado: (1768) PI: Dirk Grunwald Univ. of Colorado, Boulder [[BR]]
    89                 Dirk:  Have eight sites with 802.11 antennas, rangin from high (6 km range) to low (within clutter of buildings).  Another group on campus runs a WiMAX system inside a lab.  Staring application process for experimental license.  University has leased license to Clearwire, but may some use may still be possible.[[[BR]]
     89                Dirk:  Have eight sites with 802.11 antennas, ranging from high (6 km range) to low (within clutter of buildings).  Another group on campus runs a WiMAX system inside a lab.  Staring application process for experimental license.  University has leased license to Clearwire, but may some use may still be possible.[[[BR]]
    9090               
    9191                BBN Technologies, Cambridge MA  Tony Michel is our radio expert;  Chaos Golubitsky is responsible for our testbed.[[BR]]
     
    104104               
    105105                Workshop at Rutgers to train campuses?[[BR]]
    106                 All:  Yes, between GEC7 and GEC8. Perhaps June. [[BR]]
     106                All:  Yes, between GEC7 and GEC8, perhaps in June. [[BR]]
    107107               
    108108                Demos at GEC8  (multiple campuses;  Ivan Seskar coordinating)[[BR]]