Timeline
01/20/10:
- 18:19 LEARN edited by
- (diff)
- 18:15 Ticket #270 (Milestone S2.h completion) closed by
- fixed
- 18:13 Ticket #270 (Milestone S2.h completion) reopened by
- 18:04 ORCABEN edited by
- (diff)
- 17:55 Ticket #299 (Milestone S2.a change) closed by
- fixed
- 17:55 Ticket #299 (Milestone S2.a change) created by
- Changed to 01/20/10, per note from Rudra Dutta on 1/6/10; "As you …
- 17:53 IMF edited by
- (diff)
- 17:38 Ticket #117 (milestone 1b completion) closed by
- fixed
- 17:02 KanseiSensorNet edited by
- (diff)
- 16:48 Milestone S3MONITOR: S2.a Plan for measurement system on ProtoGENI completed
- Plan for measurement system on ProtoGENI: Software design document. …
- 16:47 DOME edited by
- (diff)
- 16:46 Ticket #298 (Milestone S2.j completion) created by
- Per 4Q09 report: Inclusion of Million Node GENI (project Seattle) on …
- 16:45 Ticket #297 (Milestone S2.m completion) created by
- Work by REU on multi-testbed experimentation. We have an REU student …
- 16:39 Ticket #296 (MIlestone S2.g completion) created by
- Per 4Q09 report: Milestone 2g has DOME supporting 900 MHz (a.k.a. …
- 16:37 Ticket #295 (Milestone S2.c completion) created by
- Per 4Q09 report: Since the completion of milestone S2.a, additional …
- 16:08 ViSE edited by
- (diff)
- 16:06 Ticket #294 (Milestone S2.m completion) closed by
- fixed
- 16:06 Ticket #294 (Milestone S2.m completion) created by
- Per 3Q09 status report: October 1st, 2009. Testbed available for …
- 16:06 Ticket #293 (Milestone S2.m completion) created by
- Per 3Q09 status report: October 1st, 2009. Testbed available for …
- 15:57 Ticket #292 (S2.p milestone completion) created by
- Per 4Q09 report: We have prepared a 6 lecture seminar to be held in …
- 15:53 Ticket #291 (Milestone S2.e completion) closed by
- fixed
- 15:52 Ticket #291 (Milestone S2.e completion) created by
- Per ViSE 4Q09 report on 1/1/09: We have setup a rapidly deployable …
- 15:41 ViSE edited by
- (diff)
- 15:28 clusterdvlan edited by
- (diff)
- 15:27 clusterdvlan edited by
- (diff)
- 15:04 clusterdvlan edited by
- (diff)
- 15:03 clusterdvlan edited by
- (diff)
- 15:02 clusterdvlan edited by
- (diff)
- 14:58 clusterdvlan edited by
- (diff)
- 14:29 DICLOUD edited by
- (diff)
- 13:37 WiMAXInteg edited by
- (diff)
- 13:36 WIMXRG edited by
- (diff)
- 13:26 WIMXUWI edited by
- (diff)
- 13:26 WIMXUWI edited by
- (diff)
- 13:25 WIMXUWI edited by
- (diff)
- 13:23 WIMXUWI edited by
- (diff)
- 13:22 WIMXUWI created by
- 13:15 SpiralTwo edited by
- (diff)
- 10:15 GENIMetaOps edited by
- (diff)
- 10:01 GENIMetaOps edited by
- Added links to Quarterly Reports (diff)
01/19/10:
- 08:59 ABAC edited by
- (diff)
- 08:50 Ticket #290 (ABAC requirement milestone deliverable report) created by
- Attached is our draft ABAC requirements document for spiral 2 …
01/15/10:
- 21:20 Milestone CompSec: S2.a completed
- Initial collection of use cases relevant for GENI threat and risk …
- 18:08 Milestone DICLOUD: S2.m Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan for Spiral 2. (9/30/10)
- 17:43 Milestone ViSE: S2.p Contribution to GENI outreach completed
- Specific contribution to GENI outreach plan required for Spiral 2: …
- 16:37 Milestone PlanetLab: S2.b GENI Spiral 2 code release 1 completed
- Cleaned-up, documented code from GEC6 demo.
- 16:37 Milestone ABAC: S2.a completed
- A requirements analysis, focusing on the current security …
- 16:08 GeniServices edited by
- fixed Jeannie's email address (diff)
- 11:09 Milestone BGPMux: S2.b Initial definition of reference experiment - completed
- Publish initial definition of reference experiment. For instance, an …
01/14/10:
- 17:18 DavisSocialLinks(DSL) edited by
- new GPO SE (diff)
- 17:17 OpportunisticWirelessNets edited by
- new GPO SE (diff)
- 16:46 Milestone DOME: S2.j Available to GENI users completed
- Make your (federated) testbed, including its extended capabilities, …
- 14:01 OFCLEM edited by
- (diff)
- 14:00 OFCLEM edited by
- (diff)
- 13:57 OFCLEM edited by
- (diff)
- 13:55 OFUWI edited by
- (diff)
- 13:54 OFUWA edited by
- (diff)
- 13:52 OFRG edited by
- (diff)
- 13:51 OFIU edited by
- (diff)
- 13:50 OFGT edited by
- (diff)
- 13:49 OFCLEM edited by
- (diff)
- 13:48 OFCLEM edited by
- (diff)
- 13:40 OFNOX created by
- 13:34 OFPR created by
- 12:38 Internet Scale Overlay Hosting edited by
- (diff)
- 12:37 Internet Scale Overlay Hosting edited by
- (diff)
- 12:36 sppReport-4Q09 created by
- 09:29 MilestonesAndTickets edited by
- (diff)
01/13/10:
- 17:18 Milestone PrimoGENI: S2.b: Design document review completed
- Complete review of design document by ProtoGENI, GENI security team, …
- 09:38 ProgrammableEdgeNode edited by
- (diff)
- 09:23 ProgrammableEdgeNode edited by
- (diff)
- 09:21 ProgrammableEdgeNode edited by
- (diff)
01/12/10:
- 21:30 ClusterC edited by
- (diff)
- 21:28 ClusterC edited by
- (diff)
- 16:01 PGAugmentation edited by
- (diff)
- 12:48 Mid-Atlantic Crossroads edited by
- (diff)
- 12:21 Mid-Atlantic Crossroads edited by
- (diff)
- 11:32 GENIMeasWS edited by
- (diff)
01/11/10:
- 16:13 LEARN edited by
- (diff)
- 16:13 LEARN edited by
- (diff)
- 16:11 LEARN edited by
- (diff)
- 16:09 LEARN edited by
- (diff)
- 16:08 LEARN edited by
- (diff)
- 11:53 InstrumentationTools edited by
- (diff)
- 11:41 InstrumentationTools edited by
- (diff)
- 11:33 SpiralTwo edited by
- (diff)
- 11:31 SpiralTwo edited by
- (diff)
- 11:29 SpiralTwo edited by
- (diff)
- 11:27 WIMXRG edited by
- (diff)
- 11:26 WiMAXInteg edited by
- (diff)
- 11:24 WiMAXInteg edited by
- (diff)
- 11:19 WIMXNYUPT edited by
- (diff)
- 11:18 WIMXCOLUM edited by
- (diff)
- 11:15 WIMXUCLA edited by
- (diff)
- 11:14 WIMXUCLA edited by
- (diff)
- 11:14 WIMXUCLA edited by
- (diff)
- 07:57 WiMAXInteg/CampusInstallation edited by
- (diff)
01/08/10:
- 18:17 WIMXCOLUM edited by
- (diff)
- 18:13 WIMXCOLUM edited by
- (diff)
- 18:11 WIMXCOLUM edited by
- (diff)
- 18:08 WIMXUCLA created by
- 18:07 WIMXCOLUM created by
- 18:06 SpiralTwo edited by
- (diff)
- 17:16 WiMAXInteg/CampusInstallation edited by
- (diff)
- 10:33 Milestone ExptsSec: S2.a - completed
- Design experiment to evaluate the security of select functions in the …
01/07/10:
01/06/10:
- 16:51 LEFA edited by
- (diff)
- 11:54 GushProto edited by
- (diff)
- 11:50 SecureUpdates edited by
- (diff)
- 11:49 SCAFFOLD edited by
- (diff)
- 11:44 netKarma edited by
- (diff)
- 11:40 GeniControl edited by
- new GPO SE; added Spiral 2 plans (diff)
- 11:33 GeniControl edited by
- (diff)
- 11:31 GEC6CFWGAgenda edited by
- (diff)
- 11:29 OpenCIRRUS edited by
- (diff)
- 11:29 VMI-FED edited by
- (diff)
- 11:28 GEC6CFWGAgenda edited by
- (diff)
- 11:27 GEC6CFWGAgenda edited by
- (diff)
- 11:25 GEC6CFWGAgenda edited by
- (diff)
- 11:25 GEC6CFWGAgenda edited by
- (diff)
- 11:24 GEC6CFWGAgenda edited by
- (diff)
- 11:22 Internet Scale Overlay Hosting edited by
- (diff)
- 11:18 GpENI edited by
- (diff)
- 10:59 Mid-Atlantic Crossroads edited by
- (diff)
01/05/10:
- 12:17 Embedded Real-Time Measurements edited by
- (diff)
- 12:07 ProvisioningService edited by
- (diff)
- 11:49 S3Monitor-QSR-Dec09 created by
- 11:42 ScalableMonitoring edited by
- (diff)
01/04/10:
- 17:18 Milestone KANSEI: S2.c Extend researcher portal to support workflow management completed
- Extend KanseiGenie Researcher Portal to Support Experiment Workflow …
- 14:25 GEC6CFWGAgenda edited by
- (diff)
- 13:17 Milestone MILNGENI: S2.b End hosts with intermitted connectivity completed
- Operation with end-hosts that have intermittent connectivity and/or …
01/01/10:
- 16:35 Milestone BGPMux: S2.e BGP Mux in GaTech syllabus completed
- - Release “integration of BGP Mux as a tool for learning about BGP” …
- 15:53 Milestone ViSE: S2.e Installation of x86 sensor node completed
- Best-effort installation of Pelham tower x86 sensor node (note: funded …
- 00:00 Milestone OFNOX: S2.b Release NOX supporting OpenFlow 1.0 completed
- Release software that supports OpenFlow 1.0. In GENI environments. …
12/31/09:
- 20:48 Milestone NETKARMA: S2.c identify tools completed
- Establish connections with relevant experimental tools projects …
- 18:36 OnTimeMeasure edited by
- (diff)
- 18:35 OnTimeMeasure edited by
- (diff)
- 18:35 OnTimeMeasure edited by
- (diff)
- 17:55 Milestone GpENI: S2.f MAX completed
- Investigate options for interconnecting MAX with GpENI; document in a …
- 17:44 Milestone RAVEN: S2.a continuous completed
- a) Support continuous operation of GENI. Raven/Stork repository must …
- 17:28 Milestone SPP: S2.m code completed
- Provide sample applications using SPP fast paths and provide complete, …
- 17:16 ExptsSecurityAnalysis edited by
- (diff)
- 17:16 Milestone RAVEN: S2.c two cluster plan completed
- c) Plan for using Raven as a provisioning service for one other …
- 17:11 PGAugmentation edited by
- (diff)
- 17:06 PGAugmentation edited by
- (diff)
- 17:01 ProtoGENI edited by
- (diff)
- 16:47 OnTimeMeasure edited by
- (diff)
- 16:44 Ticket #289 (NetKarma Dec 2009 Milestones) created by
- We have added the NetKarma 2009 Q4 quarterly report to the wiki at: …
- 16:38 Milestone OnTime: S2.a: OnTimeMeasure for ProtoGENI design v 1.0 completed
- High-level design of OnTimeMeasure Version 1.0 customizations for …
- 16:36 netKarma edited by
- Added link to NetKarma 2009 Q4 report (diff)
- 16:18 Milestone MAX: S2.a NetFPGA Integration into DRAGON completed
- Complete the placement and configuration of the NetFPGA systems into …
- 16:06 Milestone MAX: S2.f DRAGON Aggregate Manager Documentation completed
- Update the design and installation documents for the DRAGON Aggregate …
- 16:05 Milestone MAX: S2.e User Support completed
- Work with and support interested users on use of the DRAGON GENI …
- 16:02 Milestone MAX: S2.d Common Control Framework Design completed
- Work with GENI community to develop an approach for a common control …
- 12:53 Milestone SPP: Limited research available completed
- Make initial SPP deployment available for limited external research
- 11:26 Milestone GpENI: S2.e VINI completed
- Collaborate with Princeton on the programmable router feature using …
- 10:46 IGENI edited by
- (diff)
- 10:33 DICLOUD edited by
- (diff)
- 09:52 Milestone MAX: S2.c DRAGON Aggregate Manager Enhancement Design completed
- Complete design for the enhancements to the DRAGON Aggregate Manager. …
- 09:52 Milestone NETKARMA: S2.b webpage completed
- Set up project web page Status: Web page at …
- 09:41 Milestone RAVEN: S2.b GUSH integration completed
- b) Integration with GUSH. Integrate provisioning into the GUSH set of …
- 00:00 Milestone OFIU: S2.a1 Select vendors completed
- Select vendors for on-campus hardware evaluations.
- 00:00 Milestone OFSTAN: S2.a Release OpenFlow 1.0 completed
- Release OpenFlow 1.0.
12/30/09:
- 21:11 Ticket #213 (Integration and Documentation proceeding) closed by
- fixed: A complete document describing the INSTOOL instrumentation and …
- 17:13 Milestone PrimoGENI: S2.a: Integration of PRIME into ProtoGENI completed
- Initial draft of the design document that describes how to integrate …
- 16:26 MillionNodeGENI edited by
- (diff)
- 16:25 MillionNodeGENI edited by
- (diff)
- 16:20 MillionNodeGENI edited by
- (diff)
- 16:19 MillionNodeGENI edited by
- (diff)
- 16:18 Milestone SECUREUPDATES: S2.c repo lib design completed
- Deliver a design document for the repository library protection …
- 16:17 Milestone SECUREUPDATES: S2.b client lib design completed
- Deliver a design document for client library protection against replay …
- 14:39 Milestone GUSH: S2.b Course development completed
- Course materials are available from Jeannie Albrecht upon request and …
- 08:46 PrimoGENI edited by
- (diff)
- 01:40 PrimoGENI edited by
- (diff)
- 01:29 PrimoGENIDesignDocument edited by
- (diff)
- 01:21 PrimoGENIDesignDocument edited by
- (diff)
- 01:16 PrimoGENIDesignDocument created by
- 00:54 PrimoGENI edited by
- (diff)
12/29/09:
- 17:17 MillionNodeGENI edited by
- (diff)
- 16:41 Milestone OnTime: S2.b: PoC for response and escalation group completed
- Identify point-of-contact (POC) for GENI Prototype Response and …
- 11:24 OFIU edited by
- (diff)
- 11:02 OFIU edited by
- (diff)
12/28/09:
- 22:52 InstrumentationTools edited by
- (diff)
- 20:30 Ticket #288 (Spiral 2: Prototyping plans milestone completed) created by
- The file has been added to: …
- 17:59 Ticket #287 (Milestone S2.a completion) closed by
- fixed
- 17:57 Ticket #287 (Milestone S2.a completion) created by
- Two presentations at GEC 6 meetings on iGENI
- 17:48 Ticket #286 (Milestone S2.g completion) closed by
- fixed
- 17:46 Ticket #286 (Milestone S2.g completion) created by
- Per 11/20/09 email: Ilia and all, Attached is an updated set of …
- 17:36 MPRADIO edited by
- (diff)
- 17:30 Ticket #285 (Milestone S2.b completion) closed by
- fixed
- 17:30 Ticket #284 (Milestone S2.b completion) closed by
- fixed
- 17:28 Ticket #285 (Milestone S2.b completion) created by
- Per 12/22/09 email; Please find attached to this email Deliverable …
- 17:26 Ticket #284 (Milestone S2.b completion) created by
- Per 12/22/09 email; Please find attached to this email Deliverable …
- 17:06 Ticket #283 (Milestone S2.1 completion) closed by
- fixed
- 17:06 Ticket #283 (Milestone S2.1 completion) created by
- Per 12/21 email: Hi Camilo, Wenjie will be expert from our team to …
- 17:04 Ticket #282 (Milestone S2.j completion) closed by
- fixed
- 17:04 Ticket #282 (Milestone S2.j completion) created by
- Per 12/21/09 email: Hi Camilo, Wenjie will be expert from our team …
- 16:15 WiMAXInteg/CampusInstallation edited by
- (diff)
- 16:09 WiMAXInteg/CampusInstallation edited by
- (diff)
- 00:00 Milestone GMOC: S2.a Spiral 2 prototyping plans completed
- Complete Spiral 2 Prototyping Plans. Document plans for gathering and …
12/23/09:
12/22/09:
- 17:30 Milestone DICLOUD: S2.b Plan to connect to cloud completed
- Report on the options and cost implications for network connectivity …
- 17:10 Ticket #95 (milestone 1e completion) closed by
- fixed: Demonstrated at GEC6
- 15:46 Ticket #276 (Providing CM for VLAN creation on backbone switches to other projects) closed by
- fixed: The appropriate modifications have been made to the ProtoGeni …
- 14:27 Milestone MeasurementSys: S1.e Prototype with basic measurement functionality. completed
- Develop a prototype with basic measurement functionality, including …
12/21/09:
- 20:05 Ticket #281 (RSpec extension spec) closed by
- fixed: A new version of ProtoGENI RSpecs has been developed which includes a …
- 20:04 Ticket #281 (RSpec extension spec) created by
- Release RSpec extension specification, describing how other projects …
- 17:20 Milestone KANSEI: S2.k POC to GENI security team completed
- Provide POC to Security team and provide input for security review in …
- 17:06 Milestone KANSEI: S2.j POC to GENI response team completed
- Provide POC to GENI Prototype Response and Escalation team. (11/1/09)
- 17:06 Milestone KANSEI: S2.i Collaborate with GMOC completed
- Collaborate with GMOC operations group on providing access to Kansei …
Note: See TracTimeline