Timeline
06/26/09:
- 22:52 GENIMeasWS edited by
- Add paper reference forK. Sollins (diff)
- 17:49 GENIMeasWS edited by
- (diff)
- 17:33 GENIMeasWS edited by
- (diff)
- 17:32 GENIMeasWS edited by
- (diff)
- 17:27 GENIMeasWS edited by
- (diff)
- 17:26 GENIMeasWS edited by
- (diff)
- 16:41 GENIMeasWS edited by
- (diff)
- 16:39 GENIMeasWS edited by
- (diff)
- 16:37 GENIMeasWS edited by
- Added Chris Small's presentation (diff)
- 15:38 Ticket #138 (Gush demo) created by
- I plan to demo the basic functionality of Gush using geniwrapper for …
- 15:04 NetworkRspecMiniWorkshopNotes edited by
- (diff)
- 15:03 NetworkRspecMiniWorkshopNotes edited by
- (diff)
- 14:58 Embedded Real-Time Measurements edited by
- (diff)
- 14:51 GENIMeasWS edited by
- (diff)
- 13:35 GeniRspec edited by
- (diff)
- 13:31 NetworkRSpecMiniWorkshop edited by
- (diff)
- 13:21 OtherMeetings edited by
- (diff)
- 13:16 GENIMeasWS edited by
- (diff)
- 13:12 WikiStart edited by
- (diff)
- 13:08 WikiStart edited by
- (diff)
- 12:57 Ticket #137 (ViSE GEC5 Demonstration) created by
- The ViSE project is demonstrating the integration of virtualized …
- 12:50 GENIMeasWS edited by
- (diff)
- 12:50 GENIMeasWS edited by
- (diff)
- 12:45 GENIMeasWS edited by
- (diff)
- 12:42 GENIMeasWS edited by
- (diff)
- 12:38 GENIMeasWS edited by
- (diff)
- 12:26 GENIMeasWS edited by
- (diff)
- 12:15 GENIMeasWS edited by
- (diff)
- 12:10 GENIMeasWS edited by
- (diff)
- 11:35 Ticket #136 (GEC5 DOME Demo Description and Needs) created by
- We will demo the integration of DOME with ORCA. Also, we will be …
- 11:32 GENIMeasWS edited by
- (diff)
- 11:32 GENIMeasWS edited by
- (diff)
- 11:15 GENIMeasWS edited by
- (diff)
- 11:14 GENIMeasWS edited by
- (diff)
- 10:59 GENIMeasWS edited by
- (diff)
- 10:59 GENIMeasWS edited by
- (diff)
- 10:53 Ticket #135 (Demonstration of the proposed GENI Federated Clearinghouse by CNRI) created by
- The Corporation for National Research Initiatives (CNRI) will be …
- 10:46 NetworkRspecMiniWorkshopNotes edited by
- (diff)
- 10:40 NetworkRspecMiniWorkshopNotes edited by
- (diff)
- 10:35 GENIMeasWS edited by
- (diff)
- 10:35 GENIMeasWS edited by
- (diff)
- 10:34 GENIMeasWS edited by
- (diff)
- 10:34 GENIMeasWS edited by
- Create page for workshop (diff)
- 10:33 GENIMeasWS created by
- 10:26 WikiStart edited by
- (diff)
06/25/09:
- 16:41 NetworkRspecMiniWorkshopNotes created by
- 16:40 NetworkRSpecMiniWorkshop edited by
- (diff)
- 14:29 NetworkRSpecMiniWorkshop edited by
- (diff)
- 14:27 NetworkRSpecMiniWorkshop edited by
- (diff)
- 12:26 NetworkRSpecMiniWorkshop edited by
- (diff)
- 12:24 NetworkRSpecMiniWorkshop edited by
- (diff)
- 12:24 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:58 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:57 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:57 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:56 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:55 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:55 NetworkRSpecMiniWorkshop edited by
- (diff)
- 10:01 Data Plane Measurements edited by
- (diff)
- 10:00 Embedded Real-Time Measurements edited by
- (diff)
- 09:59 ProgrammableEdgeNode edited by
- (diff)
- 09:58 Internet Scale Overlay Hosting edited by
- (diff)
- 09:57 GpENI edited by
- (diff)
- 09:56 Mid-Atlantic Crossroads edited by
- (diff)
- 09:55 GeniFourYearColleges edited by
- (diff)
- 09:54 GeniFourYearColleges edited by
- (diff)
- 09:53 GeniFourYearColleges edited by
- (diff)
- 09:52 GeniFourYearColleges edited by
- (diff)
- 09:36 Ticket #134 (Requirement for KanseiGenie demo at GEC 5) created by
- We would like a stands for 1 poster, 3 chairs and sufficient table …
- 01:28 NetworkRSpecMiniWorkshop edited by
- (diff)
- 01:04 Mid-Atlantic Crossroads edited by
- (diff)
- 01:03 Mid-Atlantic Crossroads edited by
- (diff)
- 00:56 Mid-Atlantic Crossroads edited by
- (diff)
- 00:55 Mid-Atlantic Crossroads edited by
- (diff)
- 00:51 Mid-Atlantic Crossroads edited by
- (diff)
- 00:49 Mid-Atlantic Crossroads edited by
- (diff)
- 00:45 NetworkRSpecMiniWorkshop edited by
- (diff)
- 00:25 NetworkRSpecMiniWorkshop edited by
- (diff)
06/24/09:
- 15:55 Ticket #133 (GEC 5 Demo requirements for Million Node GENI project) created by
- We would like to have four people from our project present work (1 PI, …
- 10:48 Ticket #132 (MANFRED/MAX GEC5 demo) created by
- In our demonstration for GEC5, MANFRED will demonstrate an Aggregate …
06/23/09:
- 10:51 MillionNodeGENI edited by
- (diff)
- 09:52 Ticket #131 (PlanetLab/Geniwrapper Demo) created by
- I need a projector and a display screen. If wired ethernet is …
06/22/09:
- 14:06 Ticket #130 (Requirements for GMOC demo at GEC5) created by
- GMOC is planning a demo of the current GMOC implementation at GEC5. …
06/19/09:
- 18:14 Ticket #129 (ProtoGENI demo at GEC#5) created by
- ProtoGENI will be giving a demo at GEC5. We wil need: * Table space …
- 15:26 ChristopherSmallTest edited by
- (diff)
- 15:25 ChristopherSmallTest edited by
- (diff)
- 15:13 ChristopherSmallTest edited by
- (diff)
- 14:54 ChristopherSmallTest edited by
- (diff)
- 14:48 ChristopherSmallTest edited by
- (diff)
- 14:47 WikiNewPage edited by
- (diff)
- 14:46 ChristopherSmallTest created by
- 14:46 WikiNewPage edited by
- (diff)
06/18/09:
- 18:57 MeasurementSystem edited by
- (diff)
- 17:54 Ticket #128 (Ticket for Miletone: student testbed use) created by
- The CMU testbed already sees a lot of use by users internal and …
- 17:52 Ticket #127 (Dataplane tunnelling 4c) created by
- Tunneling packets from CMU to Homenet nodes - We have a solution for …
- 17:49 Ticket #126 (Dataplane tunnelling 4b) created by
- Tunneling packets from CMU to Utah - We have a solution for this which …
- 17:46 Ticket #125 (Dataplane tunnelling 4a) created by
- Task 4a requires Internet2, which we have not heard anything about.
- 17:44 Ticket #124 (ProtoGENI control plane integration status) created by
- It is possible to allocate emulator and homenet nodes using ProtoGENI …
- 17:32 Ticket #123 (Close "Milestone CMU Lab: desired node config & boot mgmt ...) created by
- No remaining issues on this - should've been closed some time ago.
- 14:13 Ticket #122 (Plan for GEC5 demonstrations) created by
- Collect demonstration requirements from all GEC5 projects. Work with …
- 09:24 WikiStart edited by
- Add more obvious instructions for getting an account. (diff)
06/17/09:
- 13:39 ORCABEN edited by
- (diff)
- 11:23 GpoDoc edited by
- (diff)
- 11:21 GpoDoc edited by
- (diff)
- 11:15 GpoDoc edited by
- (diff)
- 11:13 GpoDoc edited by
- (diff)
- 10:54 Ticket #120 (milestone 1d1 completion) closed by
- fixed
- 10:51 Ticket #116 (milestone 1a completion) closed by
- fixed
- 10:51 Ticket #118 (milestone 1c1 completion) closed by
- fixed
- 10:46 KanseiSensorNet edited by
- (diff)
06/16/09:
- 21:33 KanseiSensorNet edited by
- (diff)
- 21:32 Ticket #121 (milestone 1d2 completion) created by
- 21:31 Ticket #120 (milestone 1d1 completion) created by
- Completed 4/1/09 per attached status report
- 21:29 Ticket #119 (milestone 1c2 completion) created by
- 21:29 KanseiSensorNet edited by
- (diff)
- 21:27 Ticket #118 (milestone 1c1 completion) created by
- Completed 4/1/09 per attached status report
- 21:26 KanseiSensorNet edited by
- (diff)
- 21:26 Ticket #117 (milestone 1b completion) created by
- 21:24 KanseiSensorNet edited by
- (diff)
- 21:17 Ticket #116 (milestone 1a completion) created by
- Completed by 4/30/09 per attached file
- 21:09 KanseiSensorNet edited by
- (diff)
- 21:05 KanseiSensorNet edited by
- (diff)
- 20:57 KanseiSensorNet edited by
- (diff)
- 20:44 KanseiSensorNet edited by
- (diff)
- 20:41 KanseiSensorNet edited by
- (diff)
- 20:30 KanseiSensorNet edited by
- (diff)
- 19:48 Ticket #102 (milestone 1c completion) closed by
- fixed
- 19:47 Ticket #102 (milestone 1c completion) reopened by
06/15/09:
06/12/09:
- 12:00 WikiStart edited by
- (diff)
- 10:06 Data Plane Measurements edited by
- (diff)
- 10:04 Data Plane Measurements edited by
- (diff)
- 09:58 ProtoGENI edited by
- !-escape McGeer (diff)
06/11/09:
- 16:59 SpiralOneProjects edited by
- (diff)
- 16:49 SpiralOneProjects created by
- 16:38 GeniNewcomers edited by
- (diff)
- 14:42 ProtoGENI edited by
- (diff)
- 14:40 ProtoGENI edited by
- (diff)
06/10/09:
06/09/09:
- 13:49 DTunnels edited by
- (diff)
- 13:45 Ticket #115 (Develop alternate spiral-1 outreach milestone) closed by
- fixed: GPO approved on 6/9/09 Nick to provide an abstract of the HowTo by …
06/08/09:
- 11:13 DTunnels edited by
- (diff)
- 11:01 DTunnels edited by
- (diff)
- 11:00 DTunnels edited by
- (diff)
- 09:05 Ticket #115 (Develop alternate spiral-1 outreach milestone) created by
- Nick isn't teaching this year and would like to find an alternate …
06/07/09:
- 13:23 TIED edited by
- Under Technical Documents: added pointer to and description of … (diff)
- 13:13 TIED edited by
- (diff)
- 13:12 TIED edited by
- (diff)
06/04/09:
- 22:38 GpoDoc edited by
- add RUP (diff)
- 13:23 Embedded Real-Time Measurements edited by
- (diff)
- 02:24 GENISecurity edited by
- remove .pdf soon comment, since the .pdf version is attached. (diff)
- 02:06 GENISecurity edited by
- fix link to match attachment (diff)
06/01/09:
05/30/09:
- 10:06 Milestone D Meas: Identify external measurement equipment completed
- Identify external measurement equipment (if any) and/or recommend …
05/29/09:
- 18:48 KanseiSensorNet edited by
- (diff)
- 18:07 Ticket #103 (milestone 1d completion) closed by
- fixed
- 18:05 DOME edited by
- (diff)
- 18:04 Ticket #102 (milestone 1c completion) closed by
- fixed
- 14:55 OpticalAccessNets edited by
- (diff)
- 14:54 Data Plane Measurements edited by
- (diff)
- 14:54 GeniFourYearColleges edited by
- (diff)
- 14:54 Embedded Real-Time Measurements edited by
- (diff)
- 14:53 ProgrammableEdgeNode edited by
- (diff)
- 14:53 Internet Scale Overlay Hosting edited by
- (diff)
- 14:52 GpENI edited by
- (diff)
- 14:52 Mid-Atlantic Crossroads edited by
- (diff)
- 11:34 Gec5Agenda edited by
- (diff)
- 11:32 Gec5Agenda edited by
- (diff)
- 11:03 Milestone DigitalObjectRegistry: Security requirements for implementing Clearinghouse and Registry Services. completed
- Define the security requirements, plus recommended design approaches, …
05/27/09:
- 18:07 Milestone DOME: 1d Import and setup a GENI-compliant control framework based on ORCA completed
- 1d Import and setup a GENI-compliant control framework based on ORCA, …
- 18:05 Milestone DOME: 1c Implement, integrate and document virtualized access to the WiFi radio completed
- 1c Implement, integrate and document virtualized access to the WiFi …
- 09:52 NetworkRSpecMiniWorkshop edited by
- (diff)
Note: See TracTimeline
for information about the timeline view.