{6} All Tickets By Milestone (Including closed) (1502 matches)
A more complex example to show how to make advanced reports.
Results (301 - 400 of 1502)
(empty) (100 matches)
Ticket | Summary | Component | Status | Resolution | Version | Type | Priority | Owner | Modified |
---|---|---|---|---|---|---|---|---|---|
#1143 | Move MAX GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/28/14 |
#1251 | pyOpenSSL requirement? | GPO | closed | invalid | SPIRAL6 | major | somebody | 05/21/14 | |
#1250 | Sign CSR for ExoGENI generic collector cert | GPO | closed | fixed | SPIRAL6 | blocker | tmitchel@bbn.com | 05/21/14 | |
#1247 | request for GENI-VIRO demo at GEC20 | GPO | closed | duplicate | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1246 | request for GENI-VIRO demo at GEC20 | GPO | closed | invalid | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1219 | Sign CSR for vmcount at gpo | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/08/14 | |
#1216 | Sign CSR for genicollector at uky | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/07/14 | |
#1144 | Move Clemson InstatGENI GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/06/14 |
#1213 | Sign CSR for collector at max_ops_mon_localstore | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/05/14 | |
#1212 | Sign CSR for TOOL collector for INSTANCE jfed-iminds | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 05/01/14 | |
#1152 | Tennesee State University poster | GPO | closed | wontfix | SPIRAL6 | task | major | peter.stickney@bbn.com | 05/01/14 |
#1210 | Sign CSR for collector at gpo | GPO | closed | fixed | SPIRAL6 | major | tmitchel@bbn.com | 04/28/14 | |
#1211 | InstaGENI OpenFlow stops working over stitched link | GPO | closed | fixed | SPIRAL6 | major | somebody | 04/25/14 | |
#1181 | Virtual Topology Service (VTS) demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1161 | Demo on Geni-enabled vehicular sensing and control networking | WIMXWAYNE | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1198 | GENI Experiment Engine (GEE) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1204 | SoNIC Software defined Precise Measurement in GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1178 | GENI Cinema | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1206 | Applied Research Center for Computer Networks (ARCCN) Recent Projects | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1187 | Location-Based Networking | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1171 | Software Defined Internet Exchange (SDX) at Georgia Tech and Magic Window | SOXREGIONAL | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1193 | MOXI Slice Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1182 | Internet2 Openflow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1160 | Mobile Video Streaming | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1203 | Multi-Domain OpenFlow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1177 | Server Redundancy Using OpenFlow | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1184 | Tapestry GEC19 - Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1175 | VNODE and FLARE | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1168 | SDX-iGENI: Software Define Network Exchange for international GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1191 | Clemson Vertical Handover | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1196 | ExoGENI demos | EXOGENI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1194 | Request for GIMI demo at GEC | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1192 | GENI MOOC courseware demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1190 | GEC 19 Federation tools, authorities, and APIs | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1189 | Demonstration of Course Modules for Teaching Networking Concepts (UNC - Chapel Hill) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1188 | Network characterization of Hadoop using GENI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1186 | Virtualized services via OpenFlow based end-to-end networking | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1185 | Optimize a protocol pattern matching mechanism on the LINC switch | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1183 | Simulation, Detection, and Denial of ping attack | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1180 | Submission for GEC19 by University of Kentucky for demo on monitoring prototype | MeasurementSys | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1179 | Content Retrieval in MobilityFirst FIA | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1174 | Dell Split Data Plane on ExoGENI as Network Experiment Resource | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1173 | Fast packet processing performance improvement with NETMAP | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1172 | The GENI Desktop | GEMINI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1170 | GEC19 demo submission (ProtoRINA over GENI) | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1169 | IDMS demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1167 | WiMAX Connectivity and Monitoring Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1166 | GEC19 Jacks Demo | PROTOGENI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1164 | Demo request SDN-Video-Orchestrator | SOXREGIONAL | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/24/14 |
#1176 | GEC 19 Cisco ExoGENI racks demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 03/09/14 |
#1165 | Move Cornell University InstaGENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 02/18/14 |
#1159 | Renewing stitched sliver with ION in path may result in OSCARS path modificaiton failure | STITCHING | closed | fixed | SPIRAL6 | defect | major | xyang@maxgigapop.net | 02/12/14 |
#1195 | Delete of sliver whose circuit on longer exists in MAX causes subsequent circuits to not complete | STITCHING | closed | fixed | SPIRAL6 | defect | major | xyang@maxgigapop.net | 02/11/14 |
#1158 | test ticket | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 01/24/14 |
#1154 | Missing Site VLAN Delegation information | STITCHING | closed | fixed | SPIRAL6 | defect | major | asydney@bbn.com | 11/22/13 |
#1153 | Request for 3 node linear stitched sliver results in "no edge hop" error at Utah IG | STITCHING | closed | fixed | SPIRAL6 | defect | major | somebody | 11/20/13 |
#1146 | Access to WiMAX Developer pages | GPO | closed | invalid | SPIRAL6 | task | major | agosain@bbn.com | 11/18/13 |
#1103 | ExoGENI ORCA demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1107 | MU-OSU Science DMZ Demo | ONTIME | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1108 | iGENI-International Global Environment for Network Innovations | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1109 | GENI Desktop Demonstration | GEMINI | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1110 | Demo Request: Applying Operating System Principles to SDN Controller Design | NONE | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1111 | WiMAX @ NYU-Poly - GEC18 Demo | WIMXNYUPT | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1113 | Demonstrate handover solutions in GENI WiMAX | WIMXCLEM | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1114 | GENI @ SoX - Regional Deployment | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1117 | MySlice, the portal technology for the FIRE facilities | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1116 | Lehigh Mobility Support for Streaming Video | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1118 | Internet2 OpenFlow GEC18 Demo Request | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1120 | A location based messaging system in MobilityFirst FIA | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1119 | Awesome Omni Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1112 | Sea-Cloud Innovation Environment demo request | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1115 | Measurements of OF video streaming experiments with GIMI | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1125 | Mid-Atlantic Crossroads (MAX) Demo at GEC#18 | MAX | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1124 | Security and Performance evaluation of cloud services | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1123 | A Distributed Private Social Networking Infrastructure. | DSL | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1122 | Demo Request at GEC18 for the project OpenBIDS. | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1133 | Wimax Connectivity Demo | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1135 | GEC 18 Brooklyn Poster - Title: Latent Interest Group Discovery - Authors: He, Kesidis, Miller | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1134 | VNode and FLARE | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1132 | InstaGENI: Demonstration of Slice Creation and Permanent File System | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1148 | G-Lab ToMaTo poster and laptop | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1150 | Intelligent Data Movement and Storage in GENI poster | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1151 | ProtoRINA over ProtoGENI Poster | GPO | closed | fixed | SPIRAL6 | task | major | peter.stickney@bbn.com | 10/30/13 |
#1149 | Cisco poster at OSU-MU table | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 10/27/13 |
#1038 | Manifest rspec for PG and IG does not pass rspeclint | STITCHING | new | SPIRAL5 | defect | minor | duerig@flux.utah.edu | 07/16/14 | |
#1101 | stitching raw-pc at PG or IG requires capacity to be defined unlike xen and openvz, which do not | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 09/06/13 | |
#1044 | Duplicate IP addresses configured in Utah PG to InstaGENI Utah sliver with multiple links | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 08/01/13 | |
#1039 | Stitching slivers with Utah InstaGENI end point requires that capacity must be specified for link | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 08/01/13 | |
#1012 | Expand the SCS wiki with basic design details | MAXSCS | new | SPIRAL5 | task | major | tlehman@maxgigapop.net | 06/25/13 | |
#1033 | SCS should implement Getversion | MAXSCS | assigned | SPIRAL5 | task | minor | xyang@maxgigapop.net | 06/24/13 | |
#1048 | Requesting link below minimumReservableCapacity does not generate error and allocates default | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 06/10/13 | |
#1025 | Require some form of authentication? | MAXSCS | assigned | SPIRAL5 | task | major | xyang@maxgigapop.net | 05/02/13 | |
#1024 | Support AM API v3 and negotiation | MAXSCS | new | SPIRAL5 | enhancement | major | tlehman@maxgigapop.net | 05/01/13 | |
#1023 | Add a call to query the SCS for interconnected AMs | MAXSCS | new | SPIRAL5 | enhancement | major | tlehman@maxgigapop.net | 05/01/13 | |
#1022 | Support openflow controlled VLANs | MAXSCS | new | SPIRAL5 | enhancement | major | tlehman@maxgigapop.net | 05/01/13 | |
#1058 | "global name 'extract_exception' is not defined" error reported for create sliver | I2AM | closed | wontfix | SPIRAL5 | defect | major | xyang@maxgigapop.net | 05/19/15 |
#1094 | 'Path Setup failed with error from PSSSetup' reported for I2/ION aggregate | I2AM | closed | wontfix | SPIRAL5 | defect | major | ckotil@grnoc.iu.edu | 05/19/15 |
#1049 | Some errors should cause stitcher.py to exit | STITCHING | closed | fixed | SPIRAL5 | defect | major | Aaron Helsinger | 08/25/14 |
#1241 | WiMAX Connectivity and Monitoring | GPO | closed | fixed | SPIRAL5 | major | peter.stickney@bbn.com | 07/03/14 | |
#1097 | Stitching request for two links between InstaGENI nodes fails while VLANs are available | STITCHING | closed | fixed | SPIRAL5 | defect | major | duerig@flux.utah.edu | 06/26/14 |
Note:
See TracReports for help on using and creating reports.