Changes between Version 1 and Version 2 of feb32010agenda


Ignore:
Timestamp:
02/03/10 19:27:08 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • feb32010agenda

    v1 v2  
    4141+  Planning on a demo, RENCI, iGENI, UMass[[BR]]
    4242+  Both first day, and plenary[[BR]]
    43 +  BBN will map VLAN, from UMass to BBN, to NLR FrameNet[[BR]]
    44 +  To setup path:  David Irwin, Chaos Golubitsky, Chris Heermann, Jim Chen[[BR]]
     43+  BBN will map VLAN, from UMass to BBN, to NLR FrameNet (which now terminates at RENCI)[[BR]]
     44+  Overall path:  from UMass, through NOX, to BBN, through NOX, through NLR Framenet, to iGENI,  to RENCI.
     45+  To setup path:  David Irwin (UMass Amherst), Chaos Golubitsky (BBN), Chris Heermann (RENCI), Jim Chen (Northwestern)[[BR]]
     46+  Chris Heermann (RENCI) coordinates
    4547+  Pending:  UMass direct connection to NLR FrameNet[[BR]]
    4648+  Pending:  BBN will get Cisco 3750, which can be used later[[BR]]