Changes between Initial Version and Version 1 of feb172010agenda


Ignore:
Timestamp:
02/17/10 15:35:41 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • feb172010agenda

    v1 v1  
     1Cluster D conference call on Wednesday, February 19, 2010
     2
     3Attendees:   [[BR]]
     4Ilia Baldine  RENCI[[BR]]
     5
     6Joe Mambretti Northwestern[[BR]]
     7Jim Chen
     8
     9Harry Mussman  GPO  [[BR]]
     10
     11Brian Lynn UMass Amherst[[BR]]
     12Mike Zink[[BR]]
     13David Irwin
     14
     15Xi (Wayne State)[[BR]]
     16
     17Denise Gurkan (Univ Houston)
     18
     19Caroline Lai  (Columbia) [[BR]]
     20Michael Wang
     21
     22Han  (OKGems)
     23
     24
     25Agenda:
     26
     27
     281)  2.1 release coming very soon
     29
     30+  Available this weekend [[BR]]
     31+  Will include better 6509 driver structure, permits unit testing, better choice for modifying for use with 3750 [[BR]]
     32-  Significant change from 1.2[[BR]]
     33-  Changes in protocol, so incompatible with old 1.1 brokers[[BR]]
     34-  Not really stable;  don't recommend use for GEC7 demos [[BR]]
     35+  Putting up a new clearinghouse container, rel 2.1[[BR]]
     36+  RENCI will use 2.1 for GEC7 demo [[BR]]
     37
     38
     392)  GEC7 demos by projects
     40
     41+  Federated experiment, two testbeds, Kansei (Ohio State) and NetEye (Wayne State) [[BR]]
     42+  Locally cloned Kansei GENI project, with ORCA 1.2  (OKGems) [[BR]]
     43+  ORCA in lab (1.2?), connected to 3750 switch (using 6509 driver?) (LEARN) [[BR]]
     44+  Demo on bus network, move data to GENI server at UMass, download via VLAN to demo floor;  probably 1.2.  (DOME) [[BR]]
     45+  Take CASA software, ship radar data via VLAN to demo floor, process data there, visualize on a map; possibly 2.1?  (ViSE) [[BR]]
     46+  Polatis and Infinera demo (ERM, IMF, LEARN)  [[BR]]
     47
     483)  Connectivity for demos
     49
     50+  Planning on a demo, RENCI, iGENI, UMass[[BR]]
     51+  Both first day, and plenary[[BR]]
     52+  VLAN now mapped from UMass, via NOX, to NLR FrameNet, to RENCI;  tested. [[BR]]
     53+  Pending:  x2 NLR FrameNet ports for Starlight approved;  need to get to Starlight [[BR]]
     54-  Pending:  UMass direct connection to NLR FrameNet[[BR]]
     55-  Pending:  BBN will get Cisco 3750, which can be used later[[BR]]
     56+  NLR rolling out multipoint VLAN capability this Sunday
     57
     58
     594)  Big demo from UMass to demo floor[[BR]]
     60+  Take CASA software, ship radar data via VLAN to demo floor, process data there, visualize on a map. [[BR]]
     61
     62
     635)  Next call:  March 3, 3pm