Changes between Version 115 and Version 116 of WikiStart


Ignore:
Timestamp:
06/17/10 17:41:16 (14 years ago)
Author:
hdempsey@bbn.com
Comment:

Post GENI Integration Release Guidelines for GIR 2.1

Legend:

Unmodified
Added
Removed
Modified
  • WikiStart

    v115 v116  
    3131  '''GENI Spiral 2 Overview''':  This document provides an overview of GENI Spiral 2. It describes this spiral’s developmental goals and summarizes the active projects. GENI Spiral 2 runs from October 2009 through September 2010. It is the second phase of exploratory rapid-prototyping that will begin to inform technical and operational plans for the envisioned GENI suite of research infrastructure. Spiral 2's primary goal is to begin moving towards continuous experimentation. (Informational) [http://groups.geni.net/geni/attachment/wiki/SpiralTwo/GENIS2Ovrvw060310.pdf pdf] (6/3/10)
    3232
     33  '''GENI Integration Release Guidelines''':  This document provides common guidelines for contributing software to Spiral 2 Integration Release 1 (GIR 2.1)   This release will capture working versions of software that have been integrated in GENI as of GENI Engineering Conference 8 (GEC8). This document describes completion criteria that are helpful for any software deliverable associated with a feature milestone (release, integration, resource availability, and documentation). (Informational) [http://groups.geni.net/geni/attachment/wiki/GIR2.1Guidelines/GIR2.1Guidelines.pdf pdf] (5/10/10)
     34
    3335  '''GENI Security Plan''': The plans presented in this document are motivated by: (1) The tremendous growth of GENI by the end of Spiral 2: By the end of Spiral 2 GENI will have been deployed in over a dozen campus networks and will have over twenty aggregates providing resources for use by experimenters, and (2) An increase in the numbers of researchers expected to use GENI for experimentation. The plans described in this document are Spiral 2 activities in preparation for this growth by Spiral 3.  (Draft Recommendation)  [http://groups.geni.net/geni/attachment/wiki/SpiralTwoSecurityPlans/GENI-Spiral2-SecurityPlan.pdf pdf] (3/15/10)
    3436
     
    4446'''GENI Engineering Conferences.''' 
    4547  The GEC is the GENI Project Office’s (GPO) regular open working meeting where researchers, developers, industrial & international partners and the GPO meet to advance infrastructure planning and prototyping for the GENI project. Further, the GEC focuses on how to design and build a suite of infrastructure that can best inspire and support creative research. The conference is open to all.  ''The dates and locations below should be considered mostly firm until registration opens.''
     48
    4649
    4750 ||''GEC1'' || ''October 9-11, 2007'' || ''Minneapolis, MN'' || ''[wiki:GEC1 archives]'' ||