Changes between Version 60 and Version 61 of WiMAXSiteDeployments
- Timestamp:
- 03/18/13 13:11:43 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WiMAXSiteDeployments
v60 v61 475 475 * Both report "RF failure"; Netspan and/or base station issue 476 476 477 GEC16 status: [[BR]]478 * Remain 1 up, 2 down479 * have been working continuously with Airspan to identify issue:480 * BS {#2} confirmed needing RMA for the second time - still waiting for clarification on return shipping handling/charge481 * BS {#3} debugged before without result, GPS unit taken to replace corroded one on BS {#1}, waiting for new GPS units to arrive and continue debugging with Airspan482 483 477 a) Status of deployments planned for Spiral 4: [[BR]] 484 478 Get experimental frequency from the FCC, that does not interfere with Clearwire services (yes) [[BR]] … … 525 519 526 520 527 Dec 2012 status: [[BR]] 528 * TBD [[BR]] 529 530 531 GEC16 status: [[BR]] 532 * TDB [[BR]] 533 521 GEC16 status: [[BR]] 522 * Remain 1 up, 2 down 523 * have been working continuously with Airspan to identify issue: 524 * BS {#2} confirmed needing RMA for the second time - still waiting for clarification on return shipping handling/charge 525 * BS {#3} debugged before without result, GPS unit taken to replace corroded one on BS {#1}, waiting for new GPS units to arrive and continue debugging with Airspan 534 526 535 527 === 11) Wayne State University Site Deployment Plan ===