Version 55 (modified by 14 years ago) (diff) | ,
---|
-
WiMAX Meso-Scale Deployment Integration
- 1. Projects
- 2. Meetings and Demos
- 3. References and Documents
- 4. System Engineering
- 5. Integration and Campus Deployment Plan =
- 6. WiMAX Campus Deployment Kit
- 7. WiMAX Client Platforms
- 8. Campus Installation
-
9. Experimentation
- 9.1 Standalone Operation using OMF
- 9.2 Instrumentation and Measurements using OML
- 9.3 Multiple Experiments using Virtualization
- 9.4 Customizing Experiements using Programmability
- 9.5 Federation with Other Testbeds
- 9.6 Demo A: Application Deployed on Federated WiMAX Tetsbeds on …
- 9.7 Demo B: Research Experiment Utilizing WiMAX Basestaion Kit and …
- 9.8 Demo C: Virtualization of WiMAX Testbeds ot Accomodate …
- 9.9 GEC6 Demo:
- 9.10 GEC7 Demo:
- 9.11 GEC8 Demo:
- 9.12 GEC9 Demo:
WiMAX Meso-Scale Deployment Integration
1. Projects
Campus deployment projects:
WiMAX at BBN Technologies
WiMAX at Columbia University
WiMAX at Polytechnic Institute of NYU
WiMAX at UCLA
WiMAX at University of Colorado at Boulder
WiMAX at UMass Amherst
WiMAX at University of Wisconsin
Open GENI WiMAX Base Station Kit for Campus Deployments
WIMAX Design and Prototype
ORBIT Design and Prototype
OMF (cOntrol and Management Framework)
ORBIT Testbed
GENI Projects at WINLAB
Process for updating Milestones, submitting QSRs
2. Meetings and Demos
Suggested mailing lists for Cluster E and WIMAX Integration participants:
GENI mailing lists, including the dev, discuss and geni-announce lists, plus working groups that cover your interests.
mail to cluster-e-admin@winlab.rutgers.edu for PIs. / subscribe / mailman archieve
mail to cluster-e-user@winlab.rutgers.edu for users / subscribe / mailman archieve
WiMAX Base Station Demo at GEC 6, November 17, 2009
Cluster E and WiMAX Deployment Call on Februaruy 8, 2010
Cluster E and WiMAX Deployment Meetings at GEC7 March 16 and 17, 2010
3. References and Documents
WiMAX Concepts and RF Measurements, IEEE 802.16-2004 WiMAX PHY layer operation and measurements, Hewlett Packard Application Note
GENI WiMAX Project: System Engineering Summary
API Specification for Virtualized WiMAX Basestation
D. Raychaudhuri and Editors M. Gerla, “New architectures and disruptive technologies for the future internet: The wireless, mobile and sensor network perspective” Report of NSF Wireless Mobile Planning Group (WMPG) Workshop, August 2005
Open Base Station Architecture Initiative
“Android: An Open Handset Alliance Project"
”NEC’s broadband wireless access products”, NEC Corporation Technical White Paper
“Wireless virtualization in GENI”, GDD-06-17, 2006
- Paul, R. Yates, D. Raychaudhuri and J. Kurose, "The Cache-and-Forward Network Architecture for Efficient Mobile Content Delivery Services in the Future Internet", to appear in ITU-T Next Generation Networks (NGN) Conference, Geneva, May 2008.
OMF (cOntrol and Management Framework)
ORBIT Testbed
Current OMF documents
Cluster E Overview Drawing
ORBIT diagram
ORBIT Connectivity
(WiMAX connectivity from WINLAB follows ORBIT connectivity)
OML is a measurement library developed in the context of OMF.
OML Overview (wiki)
OML Overview (slides)
4. System Engineering
GENI WiMAX Project: System Engineering Summary
5. Integration and Campus Deployment Plan =
See campus table from 1793 proposal
See high-level schedule Figure 6 from 1793 proposal
6. WiMAX Campus Deployment Kit
6.1 Configuration
Fig 1-2a) Hardware and Networking
6.2 NEC Hardware
Fig 1-2b) NEC BTS, ODU and Antenna
6.3 -48VDC Power
6.4 Software Modules
6.5 Messages and APIs
6.6 Virtualization
6.7 Control and Management
Fig 1-5) Control and Management
6.8 Kit Bill of Materials
6.9 Kit Delivery and Release Plan
7. WiMAX Client Platforms
8. Campus Installation
9. Experimentation
9.1 Standalone Operation using OMF
ORBIT Experiments (getting started)
9.2 Instrumentation and Measurements using OML
9.3 Multiple Experiments using Virtualization
9.4 Customizing Experiements using Programmability
9.5 Federation with Other Testbeds
ORBIT to PlanetLab Interoperability
9.6 Demo A: Application Deployed on Federated WiMAX Tetsbeds on Multiple Campuses
9.7 Demo B: Research Experiment Utilizing WiMAX Basestaion Kit and WiMAX Clients
9.8 Demo C: Virtualization of WiMAX Testbeds ot Accomodate Applications and Research Experiments
9.9 GEC6 Demo:
9.10 GEC7 Demo:
9.11 GEC8 Demo:
9.12 GEC9 Demo:
Attachments (24)
- 111309b WiMAXSystemOverview.vsd (3.8 MB) - added by 14 years ago.
- Visio-111309b WiMAXSystemOverview.pdf (741.7 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_1.jpg (258.5 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_2.jpg (231.0 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_3.jpg (397.7 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_4.jpg (931.5 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_5.jpg (542.7 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_6.jpg (496.5 KB) - added by 14 years ago.
- Visio-111309b_WiMAXSystemOverview_Page_7.jpg (360.7 KB) - added by 14 years ago.
- WiMAX Concepts and RF Measuremnts by HP WiMAX-details.pdf (983.8 KB) - added by 14 years ago.
- figure6-1networkrefmodel.jpg (46.6 KB) - added by 14 years ago.
- figure6-2asnrefmodel.jpg (33.0 KB) - added by 14 years ago.
- 113009 v0.5 GENIDandPInfraBuildouts.pdf (181.1 KB) - added by 14 years ago.
- fig1wimaxcampusbuildout.jpg (54.8 KB) - added by 14 years ago.
- fig6schedule.jpg (34.9 KB) - added by 14 years ago.
- table1projecttasks.jpg (80.5 KB) - added by 14 years ago.
- tablesiteplan.jpg (132.4 KB) - added by 14 years ago.
- tabl1campusresanditlead.jpg (64.7 KB) - added by 14 years ago.
- 041510 Quote_5018368.pdf (97.8 KB) - added by 14 years ago.
- coverletter.pdf (89.6 KB) - added by 14 years ago.
- Mobile_WiMAX-_Part_1-Overview_and_Performance.pdf (732.1 KB) - added by 14 years ago.
- Mobile_WiMAX_Part2_Comparative_Analysis.pdf (331.0 KB) - added by 14 years ago.
- 092010b GENI_WiMAX WINTECH_2010.ppt (4.3 MB) - added by 14 years ago.
- UoC - MacroMAXe RF Plan V1.1.pptx (8.6 MB) - added by 12 years ago.