    104 === 5.2  Campus Deployment Plan ===
     102=== 5.2  Integration Status ===
     103
     104
     105=== 5.3  Integration Issues ===
     106
     107
     108
     109=== 5.4  Campus Deployment Plan ===
    105110
    106111The [http://groups.geni.net/geni/attachment/wiki/WiMAXInteg/113009%20v0.5%20GENIDandPInfraBuildouts.pdf  GENI D&P WiMAX Infrastructure Buildout] summarizes the entire plan.[[BR]]
     
    110115
    111116And a list of involved researchers and IT leaders:  [[BR]]
    112 [[Image(tabl1campusresanditlead.jpg, 60%)]]  [[BR]]
     117[[Image(tabl1campusresanditlead.pdf, 60%)]]  [[BR]]
    113118
    114119The WiMAX Kit Project (1753) outlined the usage plans for each campus: [[BR]]
    115120[[Image(tablesiteplan.jpg, 60%)]]  [[BR]]
    116121
    117 
    118 
    119 === 5.3  Open Issues ===
     122=== 5.5  Campus Deployment Status ===
     123
     124
     125|| Step || Description || BBN || Colu || Poly || UCLA || Colo || UMass || Wisc || ||
     126||   1  || Identify Outdoor Site on Campus || - || - || - || - || - || - || - || ||
     127|| 2 || Obtain FCC License || - || - || - || - || - || - || - || ||
     128|| 3 || Identify Indoor Equipment Room on Campus || - || - || - || - || - || - || - || ||
     129|| 4 || Install Wiring at Outdoor Site and to Indoor Equipment Room || - || - || - || - || - || - || - || ||
     130|| 5 || Install Pole at Outdoor Site and Ground  || - || - || - || - || - || - || - || ||
     131|| 6 || Install Antenna at Outdoor Site  || - || - || - || - || - || - || - || ||
     132|| 7 || Install Base Station Outdoor Unit  || - || - || - || - || - || - || - || ||
     133|| 8 || Complete Wiring at Outdoor Site and to Indoor Equipment Room  || - || - || - || - || - || - || - || ||
     134|| 9 || Install Indoor Equipment Racks and Ground  || - || - || - || - || - || - || - || ||
     135|| 10 || Install 120VAC and -48VDC Power Feeds and/or Supplies  || - || - || - || - || - || - || - || ||
     136|| 11 || Install Base Station Indoor Unit  || - || - || - || - || - || - || - || ||
     137|| 12 || Complete Wiring of Base Station Indoor Unit  || - || - || - || - || - || - || - || ||
     138|| 13 || Initial Check-Out of Antenna and Base Station Outdoor and Indoor Units  || - || - || - || - || - || - || - || ||
     139|| 14 || Install Ethernet (VLAN) Switch, or Identify Existing Capacity  || - || - || - || - || - || - || - || ||
     140|| 15 || Install Linux Server(s) and Software || - || - || - || - || - || - || - || ||
     141|| 16 || Connect Backbone Network  || - || - || - || - || - || - || - || ||
     142|| 17 || Provide Reference Client Platform  || - || - || - || - || - || - || - || ||
     143|| 18 || Initial Check-Out of Campus WiMAX Testbed  || - || - || - || - || - || - || - || ||
     144
     145=== 5.6  Campus Deployment Issues ===
    120146
    121147