Changes between Version 146 and Version 147 of WiMAXInteg


Ignore:
Timestamp:
04/01/10 11:52:28 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WiMAXInteg

    v146 v147  
    271271 One power supply for IDU, Mean Well [http://www.mouser.com/ProductDetail/Mean-Well/SP-320-48/?qs=vSyGtvivC8zwzazZzxeJ9g%3d%3d SP-320-48], 110VAC input,  -48VDC output, rated 6.7A or 320W, mounted in tesbed equipment room.  [[BR]]
    272272 
    273 
    274 === 6.6  Software Modules ===
     273=== 6.6  Server Hardware ===
     274
     275Fig 1-2a)  Hardware and Networking  [[BR]]
     276[[Image(Visio-111309b_WiMAXSystemOverview_Page_2.jpg, 90%)]]  [[BR]]
     277
     278Figure 1-2a) shows the full configuration with three servers: [[BR]]
     279 ASNGW-03, that provides combined ASN GW functions. [[BR]]
     280 ASNGW-02, that provides virtualized ASN GW functions, for separate slices. [[BR]]
     281 OMF-04, that provides a set of OMF/OML functions. [[BR]]
     282
     283In some cases, a campus already has a set of OMF/OML functions, and would likely not require the OMF-04 server:[[BR]]
     284 Rutgers, WINLAB[[BR]]
     285 Rutgers, Bush Campus[[BR]]
     286 Polytechnic Institute of NYU[[BR]]
     287 
     288For the initial bringup, it should be possible to load all functions into one server.[[BR]]
     289
     290Issue:  Are there campuses that can complete their expected experiments operating with only one server?  two servers?
     291
     292
     293=== 6.7  Software Modules ===
    275294
    276295Fig 1-3a)  Software  [[BR]]
    277296[[Image(Visio-111309b_WiMAXSystemOverview_Page_4.jpg, 90%)]]  [[BR]]
    278297
    279 === 6.7  Messages and APIs  ===
     298=== 6.8  Messages and APIs  ===
    280299
    281300Fig 1-3b)  Messages and APIs  [[BR]]
    282301[[Image(Visio-111309b_WiMAXSystemOverview_Page_5.jpg, 90%)]]  [[BR]]
    283302
    284 === 6.8  Virtualization ===
     303=== 6.9  Virtualization ===
    285304
    286305Fig 1-4)  Virtualization  [[BR]]
     
    288307
    289308
    290 === 6.9  Control and Management  ===
     309=== 6.10  Control and Management  ===
    291310
    292311Fig 1-5)  Control and Management  [[BR]]
     
    294313
    295314
    296 === 6.10  Backbone Network Access ===
    297 
    298 
    299 
    300 === 6.11  Federation  ===
     315=== 6.11  Backbone Network Access ===
     316
     317
     318
     319=== 6.12  Federation  ===
    301320
    302321During initial bringup, each WiMAX testbed will operate as a self-contained OMF-controlled testbed.
     
    310329Issue:  How will WiAMX tesbeds be connected together, using a VLAN carried by a GENI backbone?
    311330
    312 === 6.12  Monitoring and Management ===
    313 
    314 
    315 
    316 === 6.13  Kit Bill of Materials ===
     331=== 6.13  Monitoring and Management ===
     332
     333
     334
     335=== 6.14  Kit Bill of Materials ===
    317336
    318337The following WiMAX base station kit items are supplied by NEC.   [[BR]]
     
    364383
    365384
    366 === 6.14  Kit Software ===
    367 
    368 
    369 
    370 === 6.15  Kit Integration and Delivery  ===
     385=== 6.15  Kit Software ===
     386
     387
     388
     389=== 6.16  Kit Integration and Delivery  ===
    371390
    372391The WiMAX Kit Project (1753) divided up projects tasks this way: [[BR]]
     
    429448
    430449
    431 === 6.16  Kit Issues ===
     450=== 6.17  Kit Issues ===
    432451
    433452